Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Astoria (North)-Ditmars-Steinway

21-39 27 Street, Queens

11105 · 16 apartments · 4 stories · City Council district 22

By · Updated · Data from NYC HPD

C
5open immediately hazardous violations · 31 per 100 apartments
B31Hazardous, open
A13Non-hazardous, open
!49Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company21-39 27TH STREET LP
Landlord (head officer or owner)James Demetriou

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    14
  2. Leaks and water damage
    14
  3. Peeling paint and plaster
    11
  4. Plumbing, sinks and toilets
    4
  5. Broken doors or locks
    3
  6. Electrical problems
    2
  7. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

CNot enough data
NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsReplace with new the broken or defective control valve to radiator at east wall in the 1st room from northIssued Jan 21, 2020 · fix by Feb 25, 2020 overdue · Violation #13553007
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 4th room from northIssued Jan 21, 2020 · fix by Jan 29, 2020 overdue · Violation #13552997
  • C
    Other repairsReplace with new the broken or defective air-valve to radiator at east wall in the 1st room from northIssued Jan 21, 2020 · fix by Jan 29, 2020 overdue · Violation #13553001
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 4th room from northIssued Jan 21, 2020 · fix by Feb 25, 2020 overdue · Violation #13552998
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and sourh walls in the 4th room from northIssued Jan 21, 2020 · fix by Jan 29, 2020 overdue · Violation #13553010
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from northIssued Jan 17, 2020 · fix by Feb 21, 2020 overdue · Violation #13553002
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the bathroomIssued Jan 17, 2020 · fix by Feb 21, 2020 overdue · Violation #13553014
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 17, 2020 · fix by Jan 25, 2020 overdue · Violation #13553013
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Jan 17, 2020 · fix by Feb 21, 2020 overdue · Violation #13553012
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste-line at bathtub in the bathroomIssued Jan 17, 2020 · fix by Jan 25, 2020 overdue · rent impairing · Violation #13553011
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from northIssued Jan 17, 2020 · fix by Feb 21, 2020 overdue · Violation #13553009
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 1st room from northIssued Jan 17, 2020 · fix by Feb 21, 2020 overdue · Violation #13553008
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jan 17, 2020 · fix by Feb 21, 2020 overdue · Violation #13553006
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 2 square feet at east wall around 2nd window from north at east in the 1st room from…Issued Sep 11, 2019 · fix by Oct 16, 2019 overdue · Violation #13274314
  • B
    Other repairsReplace with new the broken or defective wire glass lite at the skylight at 1st public hall bulkhead from east, 4th storyIssued May 10, 2019 · fix by Jun 14, 2019 overdue · Violation #13058052
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the wash basin in the bathroomIssued May 10, 2019 · fix by Jun 14, 2019 overdue · Violation #13058044
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of plant pots at the 2nd, 3rd, and 4th story balconies…Issued May 10, 2019 · fix by Jun 14, 2019 overdue · Violation #13058079
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of protruding air conditioner without brackets at the 1st window from north at the front of building , 4th storyIssued May 10, 2019 · fix by Jun 14, 2019 overdue · Violation #13058150
  • B
    Other repairsProperly repair with similar material the broken or defective window sills at east wall in the 1st room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060211
  • B
    Electrical problemsReplace with new the broken or defective electrical ceiling light swicth at west wall in the 1st room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060215
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060225
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060226
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in wasteline at bathtub in the bathroomIssued May 9, 2019 · fix by Jun 13, 2019 overdue · rent impairing · Violation #13060246
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060259
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060278
  • B
    Other repairsReplace with new the missing shut off valve handle to radiator in the 1st room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060209
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall in the 1st room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060189
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west north and southwalls and ceiling in the 1st room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060176
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color water damaged wall at east in the 1st room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060089
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall around top of window reveal in the 4th room from eastIssued May 9, 2019 · fix by Jun 13, 2019 overdue · Violation #13060033
  • B
    Other repairsProperly repair the broken or defective bell-buzzer/intercom system in the entire apartmentIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13009434
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 4th room from northIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13009357
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13009343
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at south wall in the kitchenIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13009272
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13009224
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Apr 15, 2019 · fix by May 20, 2019 overdue · Violation #13009190

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

352019
152020
12022
12024
12025
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 59 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.