Housing violations · Hamilton Heights-Sugar Hill
507 West 139 Street, Manhattan
10031 · 20 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
20 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs50
- Broken doors or locks24
- Peeling paint and plaster24
- Leaks and water damage17
- Mold13
- Missing smoke or CO detector12
- Lead paint8
- Electrical problems6
- No heat or hot water6
- Roaches5
- Plumbing, sinks and toilets3
- Missing window guards2
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 36 closed · NYC typical: 87 days
from 51 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairs& 309 m/d law abate the nuisance consisting of free standing radiator at north wall in the 1st room from northIssued Nov 13, 2026 · fix by Nov 19, 2026 · Violation #19359573
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at ceiling in the bathroomIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19359572
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance doorIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19359574
- BOther repairsProperly secure the loose cabinet at south wall in the kitchenIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19354310
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 5, 2026 · fix by Dec 1, 2026 · Violation #19354311
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Nov 5, 2026 · fix by Nov 29, 2026 · Violation #19362612
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19286524
- COther repairsProperly secure the loose cabinets at north and south walls in the kitchenIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19286522
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at wash basin in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19286525
- BLeaks and water damageRepair the leaky and/or defective water supply pipe at sink in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · rent impairing · Violation #19286523
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19255069
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance at public hall, 1st storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208537
- BOther repairsProperly repair with similar material the broken or defective cement load bearing wall east wall at building rear at fire passage wayIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19079054
- BOther repairsProperly repair or replace the broken or defective ceramic floor tiles in the kitchenIssued May 29, 2026 · fix by Jul 3, 2026 overdue · Violation #18963278
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 26, 2026 · fix by Jun 21, 2026 overdue · Violation #18949143
- CLead paintProvide ready access to buildings heating system door locked leading to basement at boiler roomIssued May 26, 2026 · fix by Jun 1, 2026 overdue · Violation #18949138
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock and assembly at lobby, 1st storyIssued Apr 23, 2026 · fix by Apr 29, 2026 overdue · Violation #18805823
- COther repairsProperly secure the loose shut off valve at radiator in the 2nd room from north at eastIssued Apr 22, 2026 · fix by Apr 28, 2026 overdue · Violation #18793920
- COther repairsProperly secure the loose shut off valve at radiator in the 1st room from north at eastIssued Apr 22, 2026 · fix by Apr 28, 2026 overdue · Violation #18793919
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at all walls in the 2nd room from north at eastIssued Apr 22, 2026 · fix by May 27, 2026 overdue · Violation #18793921
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at south wall in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806137
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 17, 2026 · fix by May 13, 2026 overdue · Violation #18793926
- COther repairsProvide an adequate supply of gas to the fixtures at the range in the kitchenIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · rent impairing · Violation #18793933
- BPlumbing, sinks and toiletsProperly secure the loose wood sink base cabinet at west wall in the kitchenIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18793932
- BBroken doors or locksProperly repair with similar material the broken or defective wood door at sink base cabinet at west wall in the kitchenIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18793931
- COther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18793922
- BOther repairsReplace with new the missing radiator cover at south wall in the entire apartmentIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18790709
- BOther repairsProperly repair or replace the broken or defective bell buzzer in the entranceIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18790708
- BBroken doors or locksProperly repair or replace the broken or defective latch at door in the entrance to buildingIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18799577
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18793929
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18793928
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 1st room from north at eastIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18793925
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at all walls in the 1st room from north at eastIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18793924
- COther repairsProperly repair with similar material the broken or defective wood casing to 2nd window (fire escape window) from east at north wall in the 1st room from north…Issued Apr 17, 2026 · fix by Apr 23, 2026 overdue · Violation #18793923
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 17, 2026 · fix by May 13, 2026 overdue · Violation #18793927
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north and east walls in the 1st room from north at westIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704053
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color south and east walls in the 1st room from north at eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704052
- BOther repairsProperly repair with similar material the broken or defective wood base cabinet in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704054
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704051
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704060
- BOther repairsReplace with new the missing ceiling and north wall in the bathroomIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704071
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak west wall in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704057
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north and west walls in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704056
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead at public hall, 6th storyIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704066
- COther repairsProvide an adequate supply of gas to the fixtures gas range in the kitchenIssued Mar 13, 2026 · fix by Mar 19, 2026 overdue · rent impairing · Violation #18704058
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704055
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704072
- BMissing window guardsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes window guard at balcony at building front at fire escape, 2nd storyIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704065
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at bulkhead at public hall, 6th storyIssued Mar 13, 2026 · fix by Apr 17, 2026 overdue · rent impairing · Violation #18704068
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704069
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704070
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 13, 2026 · fix by Apr 17, 2026 overdue · Violation #18704073
- CBroken doors or locksProperly repair or replace the broken or defective latch and assembly at door at vestibule , 1st storyIssued Mar 10, 2026 · fix by Mar 16, 2026 overdue · Violation #18693782
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from east at southIssued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18693723
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, west and north wall in the kitchenIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18653218
- BOther repairsProperly repair or replace the broken or defective radiator shut off valve in the 1st room from north at eastIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18653221
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, west and north wall in the kitchenIssued Feb 19, 2026 · fix by Mar 26, 2026 overdue · Violation #18653219
- COther repairs& 309 m/d law abate the nuisance consisting of raised window sill preventing fire escape window from opening 2nd window from west at north in the 1st room from…Issued Feb 19, 2026 · fix by Feb 25, 2026 overdue · Violation #18653220
- COther repairsProvide an adequate supply of gas to the fixtures no gas at range in the entire apartmentIssued Feb 19, 2026 · fix by Feb 25, 2026 overdue · rent impairing · Violation #18653222
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Feb 17, 2026 · fix by Feb 23, 2026 overdue · Violation #18641277
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.