Housing violations · Hamilton Heights-Sugar Hill
603 West 139 Street, Manhattan
10031 · 21 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs5
- Roaches4
- Lead paint4
- Peeling paint and plaster3
- Leaks and water damage3
- Mice or rats2
- Broken doors or locks2
- Mold2
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 14 closed · NYC typical: 87 days
from 10 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19305105
- BOther repairsProperly repair or replace the broken or defective escutcheon plate at north riser in the 2nd room from northIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19164327
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the foyerIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · rent impairing · Violation #19164323
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2026 · fix by Sep 21, 2026 overdue · Violation #19164324
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 4th room from north at eastIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · rent impairing · Violation #19164328
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective trip lever drain stopper at bathtub in the bathroomIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19164326
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Aug 26, 2026 · fix by Sep 30, 2026 overdue · Violation #19164325
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st storyIssued Jul 31, 2026 · fix by Aug 14, 2026 overdue · Violation #19108041
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule at public hall, 1st storyIssued May 18, 2026 · fix by Jun 1, 2026 overdue · Violation #18939168
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 25, 2026 · fix by Apr 20, 2026 overdue · Violation #18735240
- BOther repairsRemove all encumbrances consisting of construction materials at public hall, 1st storyIssued Sep 2, 2025 · fix by Oct 7, 2025 overdue · rent impairing · Violation #18196660
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding more than 4 inches from window sill…Issued Sep 2, 2025 · fix by Oct 7, 2025 overdue · Violation #18196659
- CLead paintReplace or repair the self-closing doors that is missing or defective fire rated door at east wall leading to basement not self closing (defective hinges) at…Issued Jun 21, 2024 · fix by Jul 5, 2024 overdue · Violation #17065268
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 9, 2023 · fix by Jun 4, 2023 overdue · Violation #15970027
- BOther repairsProperly repair with similar material the broken or defective concrete tiled floor at vestibule at public hall, 1st storyIssued Sep 17, 2021 · fix by Oct 22, 2021 overdue · Violation #14556102
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 10, 2021 · fix by Oct 6, 2021 overdue · Violation #14541423
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 9, 2021 · fix by Sep 4, 2021 overdue · Violation #14474081
- BMoldTrace and repair the source and abate the visible mold condition 2 sq ft at west wall and 1 sq ft at south wall in the bathroomIssued Jun 17, 2020 · fix by Jul 22, 2020 overdue · Violation #13698812
- CMoldTrace and repair the source and abate the visible mold condition at west wall in the kitchenIssued Feb 18, 2020 · fix by Mar 10, 2020 overdue · Violation #13605730
- CLead paintRemove or cover in a manner approved by the department the peeling lead paint heat riser of 2 from east room 1 sty northIssued Apr 25, 1989 · fix by May 15, 1989 overdue · Violation #3126277
- CLead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint east wall of southwest room 1 sty northIssued Apr 25, 1989 · fix by May 15, 1989 overdue · Violation #3126278
- CLead paintSection 27-2013 adm code remove or cover in a manner approved by the department the peeling lead paint east & south wall of northeast room 1 sty northIssued Apr 25, 1989 · fix by May 15, 1989 overdue · Violation #3126275
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.