Housing violations · Hamilton Heights-Sugar Hill
607 West 139 Street, Manhattan
10031 · 21 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Leaks and water damage6
- Other repairs6
- Peeling paint and plaster4
- Plumbing, sinks and toilets4
- Broken doors or locks3
- No heat or hot water3
- Mold3
- Mice or rats1
- Roaches1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 56 closed · NYC typical: 87 days
from 75 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19289622
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall in the 4th room from north at westIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19289623
- CBroken doors or locksProperly repair or replace the broken or defective lock and assembly at building entrance door , 1st storyIssued Jul 17, 2026 · fix by Jul 23, 2026 overdue · Violation #19081103
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective silicone caulk at tiles around bathtub in the bathroomIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037662
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037665
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 11, 2026 · fix by Jul 16, 2026 overdue · Violation #18991944
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 18, 2026 · fix by Mar 16, 2026 overdue · Violation #18641686
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 18, 2026 · fix by Mar 16, 2026 overdue · Violation #18641685
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 7, 2026 · fix by Feb 11, 2026 overdue · Violation #18553307
- BOther repairsProperly repair or replace the broken or defective intercom bell buzzer system from building entrance to north wall in kitchen in the kitchenIssued Jan 7, 2026 · fix by Feb 11, 2026 overdue · Violation #18553308
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Dec 1, 2025 · fix by Dec 7, 2025 overdue · Violation #18471132
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Dec 1, 2025 · fix by Nov 30, 2025 overdue · rent impairing · Violation #18471131
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 1, 2025 · fix by Nov 30, 2025 overdue · rent impairing · Violation #18471133
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 1, 2025 · fix by Nov 30, 2025 overdue · rent impairing · Violation #18471130
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at all walls and ceiling in the bathroomIssued Nov 5, 2025 · fix by Dec 1, 2025 overdue · Violation #18343208
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18343202
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18343206
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18343205
- BOther repairsProperly repair or replace the broken or defective wood base cabinet at south wall in the kitchenIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18343212
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18084024
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 3rd room from east at northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18084020
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 3rd room from east at northIssued Jul 14, 2025 · fix by Aug 18, 2025 overdue · Violation #18084019
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east at northIssued Jun 16, 2025 · fix by Jun 22, 2025 overdue · Violation #18024787
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Apr 18, 2024 · fix by May 23, 2024 overdue · Violation #16900348
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Mar 18, 2024 · fix by Apr 22, 2024 overdue · Violation #16746919
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the foyerIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16662951
- BMoldTrace and repair the source and abate the visible mold condition approx 15 sq. ft at ceiling in the kitchenIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16662949
- BMoldTrace and repair the source and abate the visible mold condition at west wall approx. 1 sq. ft in the bathroomIssued Oct 11, 2023 · fix by Nov 15, 2023 overdue · Violation #16304291
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the 1st room from east at southIssued Jun 13, 2023 · fix by Jul 18, 2023 overdue · Violation #16033382
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Feb 14, 2012 · fix by Mar 11, 2012 overdue · Violation #9326256
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.