Housing violations · Harlem (North)
296 West 147 Street, Manhattan
10039 · 30 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Broken doors or locks21
- Other repairs13
- Peeling paint and plaster12
- Leaks and water damage11
- Lead paint11
- Roaches9
- Mice or rats6
- No heat or hot water6
- Plumbing, sinks and toilets4
- Missing smoke or CO detector3
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 21 closed · NYC typical: 87 days
from 12 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 1, 2026 · fix by Oct 27, 2026 overdue · Violation #19255484
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 1st bathroom from northIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19255485
- BBroken doors or locksRefit the door at entrance in the 1st room from north at westIssued Jul 14, 2026 · fix by Aug 18, 2026 overdue · Violation #19045070
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 11, 2026 · fix by Jun 6, 2026 overdue · Violation #18909568
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909566
- BBroken doors or locksProperly secure the loose hinges at the door in the 5th room from eastIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909567
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18761577
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 17, 2026 · fix by Mar 17, 2026 overdue · rent impairing · Violation #18714672
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 6, 2026 · fix by Apr 1, 2026 overdue · Violation #18688505
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Mar 6, 2026 · fix by Mar 12, 2026 overdue · Violation #18688502
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18688504
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 6, 2026 · fix by Apr 10, 2026 overdue · Violation #18688503
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Feb 25, 2026 · fix by Mar 11, 2026 overdue · Violation #18665414
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from northIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18655105
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18655100
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroomIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18655102
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18655103
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from northIssued Feb 20, 2026 · fix by Mar 27, 2026 overdue · Violation #18655104
- CLead paintProvide ready access to buildings heating system door locked leading to cellar at public hall, 1st storyIssued Feb 18, 2026 · fix by Feb 24, 2026 overdue · Violation #18651354
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18634390
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18634391
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18634388
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 11, 2026 · fix by Feb 11, 2026 overdue · rent impairing · Violation #18634387
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634389
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Feb 5, 2026 · fix by Feb 11, 2026 overdue · Violation #18619299
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Feb 2, 2026 · fix by Feb 8, 2026 overdue · Violation #18612637
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jan 7, 2026 · fix by Jan 21, 2026 overdue · Violation #18553129
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Jan 7, 2026 · fix by Jan 13, 2026 overdue · Violation #18553131
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 7, 2026 · fix by Feb 11, 2026 overdue · Violation #18553128
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Jan 5, 2026 · fix by Jan 11, 2026 overdue · Violation #18546650
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall, west wall, and north wall in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18249636
- CRoachesAbate the infestation consisting of roaches at compactor closet, 2nd storyIssued Sep 25, 2025 · fix by Oct 21, 2025 overdue · Violation #18249639
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at wasteline at bathtub in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · rent impairing · Violation #18249635
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Sep 25, 2025 · fix by Oct 30, 2025 overdue · Violation #18249637
- BOther repairsProperly repair or replace the broken or defective spring balances at lower sash of 1st window from north at east wall in the 1st room from north at eastIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17756498
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Mar 17, 2025 · fix by Mar 31, 2025 overdue · Violation #17756500
- BBroken doors or locksRefit west 1 door in the 1st room from north at eastIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17756499
- BOther repairsProperly repair or replace the broken or defective spring balances at lower sash of second window from north at east wall in the 2nd room from northIssued Mar 17, 2025 · fix by Apr 21, 2025 overdue · Violation #17756497
- BBroken doors or locksRefit door in the bathroomIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17756495
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at the north wall, east wall and west wall in the bathroomIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17756494
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17756493
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall, the south wall and the ceiling in the bathroomIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17756492
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Mar 14, 2025 · fix by Apr 18, 2025 overdue · Violation #17756491
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 24, 2025 · fix by Feb 22, 2025 overdue · rent impairing · Violation #17711748
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Feb 24, 2025 · fix by Mar 2, 2025 overdue · Violation #17711749
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2024 · fix by Nov 10, 2024 overdue · Violation #17342898
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Oct 15, 2024 · fix by Nov 19, 2024 overdue · Violation #17342901
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2024 · fix by Nov 10, 2024 overdue · Violation #17342899
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from east at northIssued Oct 15, 2024 · fix by Nov 19, 2024 overdue · Violation #17342897
- CRoachesAbate the infestation consisting of roaches at compactor closet, 1st storyIssued Oct 2, 2024 · fix by Oct 28, 2024 overdue · Violation #17313419
- CRoachesAbate the infestation consisting of roaches at compactor closet, 2nd storyIssued Aug 23, 2024 · fix by Sep 18, 2024 overdue · Violation #17213478
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the 1st room from east at northIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187166
- BBroken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187168
- BBroken doors or locksReplace with new the missing closet door at south wall in the private hallwayIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187172
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2024 · fix by Sep 9, 2024 overdue · Violation #17187164
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from east at northIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187165
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 14, 2024 · fix by Sep 9, 2024 overdue · Violation #17187169
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187171
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187173
- BBroken doors or locksReplace with new the missing closet door at west wall in the 1st room from east at southIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17187174
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.