Housing violations · Harlem (North)
127 West 141 Street, Manhattan
10030 · 49 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster36
- Other repairs21
- Lead paint19
- Leaks and water damage18
- Roaches18
- Mice or rats15
- Plumbing, sinks and toilets11
- Broken doors or locks8
- Mold7
- Missing smoke or CO detector5
- Electrical problems2
- No heat or hot water2
- Missing window guards2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 94 closed · NYC typical: 87 days
from 107 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door at public hall, 1st storyIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351701
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st storyIssued Nov 4, 2026 · fix by Nov 18, 2026 · Violation #19351702
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective wood base cabinet at wash basin south wall in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311532
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311530
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311529
- BElectrical problemsProperly repair or replace the broken or defective electrical fixtures paneal at norh wall in the kitchenIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311531
- BOther repairsProperly repair or replace the broken or defective wood floor in the 6th room from northIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311528
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective grout around bathtub south wall in the bathroomIssued Oct 20, 2026 · fix by Nov 24, 2026 · Violation #19311533
- BOther repairsProperly repair with similar material the broken or defective fire retatdant material at ceiling and south wall at public hall, 3rd storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19290344
- COther repairsProperly secure the loose marble tread 1th from bottom up at west at public hall stairs, 5th storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19290340
- CBroken doors or locksProperly repair or replace the broken or defective locking device at building front entrance door at vestibule at public hall, 1st storyIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19290314
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling in east bulkheadIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19290316
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169912
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from northIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19169913
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19109313
- BOther repairsProperly repair or replace the broken or defective bell/buzzer intercom system from building front to panel at north wall in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19109319
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 30, 2025 · fix by Jan 25, 2026 overdue · Violation #18534717
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 4th room from eastIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534715
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 30, 2025 · fix by Jan 25, 2026 overdue · Violation #18534719
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from eastIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534716
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Dec 30, 2025 · fix by Feb 3, 2026 overdue · Violation #18534718
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Dec 24, 2025 · fix by Jan 28, 2026 overdue · Violation #18535774
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at south, west, north walls and ceiling in the bathroomIssued Dec 10, 2025 · fix by Jan 14, 2026 overdue · Violation #18500984
- BOther repairsProperly repair with similar material the broken or defective wood shelf at base cabinet at east wall in the kitchenIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18475176
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from eastIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18475178
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18475177
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18475175
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18475174
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355517
- BOther repairsReplace with new the missing escutcheon plate at top of the 1st steam riser from north at east in the 1st room from northIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296300
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296298
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2025 · fix by Nov 9, 2025 overdue · Violation #18296296
- BOther repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18296295
- BMoldTrace and repair the source and abate the visible mold condition less than 2sq feet at west wall in the bathroomIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18292850
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18284910
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18284903
- BOther repairsProperly repair with similar material the broken or defective eroded mortar joint at bricks at exterior wall at building frontIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185094
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 4th room from eastIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18185078
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from eastIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · rent impairing · Violation #18185077
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 29, 2025 · fix by Aug 22, 2025 overdue · Violation #18126501
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 29, 2025 · fix by Aug 22, 2025 overdue · Violation #18126498
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 29, 2025 · fix by Aug 22, 2025 overdue · Violation #18126496
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 29, 2025 · fix by Aug 22, 2025 overdue · Violation #18126499
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 6th storyIssued Jun 11, 2025 · fix by Jul 16, 2025 overdue · Violation #17999502
- BMoldTrace and repair the source and abate the visible mold condition more then 10 sq ft of mold on south wall, west wall and ceiling in the bathroomIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901319
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2025 · fix by Jun 14, 2025 overdue · Violation #17901320
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish at bathtub in the bathroomIssued May 19, 2025 · fix by Jun 23, 2025 overdue · Violation #17901318
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 14, 2025 · fix by May 10, 2025 overdue · Violation #17820977
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall. in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820981
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820980
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchenIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820979
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Apr 14, 2025 · fix by May 19, 2025 overdue · Violation #17820978
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling, east and south walls in the bathroomIssued Apr 8, 2025 · fix by May 13, 2025 overdue · Violation #17817825
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 3rd room from eastIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · Violation #17782187
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 3rd room from eastIssued Mar 26, 2025 · fix by Apr 30, 2025 overdue · rent impairing · Violation #17782188
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 19, 2025 · fix by Mar 18, 2025 overdue · rent impairing · Violation #17765332
- BPlumbing, sinks and toiletsRepair the broken or defective connection waste drain pipe at sink in the kitchenIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17701913
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 18, 2025 · fix by Mar 16, 2025 overdue · Violation #17701914
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink in the kitchenIssued Feb 11, 2025 · fix by Mar 18, 2025 overdue · Violation #17685904
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from eastIssued Feb 11, 2025 · fix by Mar 18, 2025 overdue · Violation #17685902
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.