Housing violations · Hamilton Heights-Sugar Hill
605 West 141 Street, Manhattan
10031 · 25 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs17
- Broken doors or locks14
- No heat or hot water9
- Peeling paint and plaster7
- Lead paint6
- Roaches5
- Mold5
- Missing smoke or CO detector4
- Mice or rats2
- Plumbing, sinks and toilets2
- Leaks and water damage1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 29 closed · NYC typical: 87 days
from 21 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective fire retarding material on west wall at intermediate landing area at public hall stairs, 4th storyIssued Nov 16, 2026 · Violation #19376328
- BOther repairsProperly repair or replace the broken or defective light fixture on south wall at bulkhead at public hall, 6th storyIssued Nov 16, 2026 · Violation #19376324
- CLead paint& 309 m/d law abate the nuisance consisting of metal brackets with sharp edges protruding from the stringer located above the 3rd tread from the bottom leading…Issued Nov 16, 2026 · Violation #19376315
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door and frame at fire door to roof at stair bulkheadIssued Nov 9, 2026 · fix by Nov 23, 2026 · Violation #19369713
- COther repairsReplace with new the missing marble treads 12th and 13th from bottom up at public hall stairs, 3rd storyIssued Nov 9, 2026 · fix by Nov 15, 2026 overdue · Violation #19369711
- COther repairsProperly secure the loose 5th and 6th treads from bottom up at intermediate landing at public hall stairs, 3rd storyIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19347686
- BBroken doors or locksProvide provide security in the event of power outage by means of an acceptable heavy duty latch set at building entrance doorIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19342099
- CBroken doors or locksRemove the illegal fastening unacceptable electro magnetic locking device installed at building entrance doorIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · rent impairing · Violation #19342098
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345678
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 2, 2026 · fix by Nov 1, 2026 overdue · rent impairing · Violation #19345676
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling. in the kitchenIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19345679
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19335175
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2026 · fix by Nov 25, 2026 · Violation #19335174
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and west wall. in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19335176
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306627
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19306631
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st storyIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19306632
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300789
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19306628
- CLead paintProvide ready access to buildings heating system door locked leading to basement at boiler room, 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19306626
- BOther repairsReplace with new the missing upper escutcheon plate at riser pipe south wall in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19300790
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19300788
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latchset at vestibule door at public hall, 1st storyIssued Oct 16, 2026 · fix by Oct 30, 2026 overdue · Violation #19300791
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 16, 2026 · fix by Oct 16, 2026 overdue · rent impairing · Violation #19300787
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19296367
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 13, 2026 · fix by Oct 12, 2026 overdue · rent impairing · Violation #19290940
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19293904
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 13, 2026 · fix by Oct 13, 2026 overdue · rent impairing · Violation #19292689
- CBroken doors or locksProvide ready access to buildings heating system locked boiler room door at boiler roomIssued Oct 13, 2026 · fix by Oct 19, 2026 overdue · Violation #19290941
- CBroken doors or locksProvide ready access to buildings heating system door locked outside of building at cellar at 1st boiler room from northIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19280052
- BBroken doors or locksProvide security by installing a heavy duty lock latchset at building entrance door in the event of a power on , 1st storyIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19280055
- CBroken doors or locksRemove the illegal fastening electromagnetic locking device requiring two motion operation at entrance door to building , 1st storyIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19280054
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 8, 2026 · fix by Oct 14, 2026 overdue · Violation #19279811
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 8, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19280053
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 8, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19279812
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 8, 2026 · fix by Oct 8, 2026 overdue · rent impairing · Violation #19280051
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 6, 2026 · fix by Oct 12, 2026 overdue · Violation #19259852
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 1, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19259851
- BBroken doors or locksRefit the door at entrance in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249825
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the 1st room from east at southIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249822
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19249820
- BOther repairsProperly repair with similar material the broken or defective the wood floor in the kitchenIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249824
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 28, 2026 · fix by Oct 24, 2026 overdue · Violation #19249821
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19218154
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 15, 2026 · fix by Oct 20, 2026 overdue · Violation #19218153
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 15, 2026 · fix by Sep 15, 2026 overdue · rent impairing · Violation #19218151
- CLead paintProvide ready access to buildings heating system door locked leading to basement at boiler roomIssued Sep 15, 2026 · fix by Sep 21, 2026 overdue · Violation #19218152
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 31, 2026 · fix by Aug 26, 2026 overdue · Violation #19108157
- CLead paint& 309 m/d law abate the nuisance consisting of lock at door leading to fire escape in the 4th room from east at southIssued Jun 25, 2026 · fix by Jul 1, 2026 overdue · Violation #19033988
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd bathroom from northIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18055094
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and west walls in the 1st bathroom from northIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18055092
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections consisting of a water closet, wash basin and bathtub…Issued Mar 25, 2024 · fix by Apr 29, 2024 overdue · Violation #16756453
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape window in the 4th room from eastIssued Mar 18, 2024 · fix by Mar 24, 2024 overdue · Violation #16756253
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 17, 2023 · fix by Feb 12, 2023 overdue · Violation #15662921
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 12, 2021 · fix by Nov 7, 2021 overdue · Violation #14612095
- CMoldTrace and repair the source and abate the visible mold condition at all walls and ceiling in the bathroomIssued Mar 11, 2021 · fix by Apr 6, 2021 overdue · Violation #14068864
- CMoldTrace and repair the source and abate the visible mold condition at east wall (8 sq.ft.), west wall (2 sq.ft.), north wall (7 sq.ft.), south wall (15 sq.ft.)…Issued May 23, 2019 · fix by Jun 13, 2019 overdue · Violation #13079569
- BPlumbing, sinks and toiletsDiscontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at water closet washbasin and bathtub in the bathroomIssued Sep 13, 2018 · fix by Oct 18, 2018 overdue · Violation #12576492
- BMoldTrace and repair the source and abate the nuisance consisting of mold at south and west wall in the 1st room from northIssued Sep 13, 2018 · fix by Oct 18, 2018 overdue · Violation #12576141
- BMoldTrace and repair the source and abate the nuisance consisting of mold at south wall in the 1st room from north at westIssued Sep 6, 2018 · fix by Oct 11, 2018 overdue · Violation #12564319
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.