Housing violations · Harlem (North)
104 West 144 Street, Manhattan
10030 · 15 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs7
- Peeling paint and plaster7
- Missing smoke or CO detector2
- Mice or rats2
- Electrical problems1
- Plumbing, sinks and toilets1
- Mold1
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 57 closed · NYC typical: 87 days
from 51 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302460
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19302459
- BOther repairsProperly repair with similar material the broken or defective metal saddle at entrance in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19195736
- BElectrical problemsProperly repair or replace the broken or defective electrical fixture at ceiling in the kitchenIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18926222
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued May 19, 2026 · fix by May 25, 2026 overdue · Violation #18926221
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued May 19, 2026 · fix by Jun 14, 2026 overdue · rent impairing · Violation #18926220
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in at sink in the bathroomIssued May 19, 2026 · fix by Jun 23, 2026 overdue · rent impairing · Violation #18926219
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 19, 2026 · fix by Jun 14, 2026 overdue · Violation #18926218
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at floor by south wall (white mold) in the 3rd room from northIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18536737
- COther repairsProperly repair with similar material the broken or defective metal saddle in the kitchenIssued Sep 18, 2025 · fix by Sep 24, 2025 overdue · Violation #18188060
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tile in the 1st room from north at eastIssued Sep 11, 2025 · fix by Oct 16, 2025 overdue · Violation #18188062
- BOther repairsProperly repair with similar material the broken or defective wood floor tiles in the 4th room from northIssued Sep 11, 2025 · fix by Oct 16, 2025 overdue · Violation #18188063
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 27, 2025 · fix by Oct 1, 2025 overdue · Violation #18188065
- BOther repairsProperly repair with similar material the broken or defective rotted wood floor in the 3rd room from north at eastIssued Jul 3, 2024 · fix by Aug 7, 2024 overdue · Violation #17096878
- BOther repairsProperly repair with similar material the broken or defective laminated wood floor tiles in the 1st room from north at eastIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16684702
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Feb 20, 2024 · fix by Mar 5, 2024 overdue · Violation #16684738
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16684699
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.