Housing violations · Harlem (North)
133 West 144 Street, Manhattan
10030 · 20 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster13
- Other repairs9
- Broken doors or locks9
- Leaks and water damage7
- Mold4
- Mice or rats3
- Lead paint2
- Electrical problems2
- Plumbing, sinks and toilets2
- Roaches2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 11 closed · NYC typical: 87 days
NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 13, 2026 · fix by Nov 8, 2026 overdue · Violation #19293141
- COther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder extended down at building rear at fire escapeIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · rent impairing · Violation #19163279
- CLead paintProperly repair or replace the broken or defective latch and assembly at door (leading to vestibule from street) , 1st storyIssued Jul 13, 2026 · fix by Jul 19, 2026 overdue · Violation #19070001
- CLead paintReplace or repair the self-closing doors that is missing or defective latch at door (leading to vestibule from street) , 1st storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19069999
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at ceiling in the 2nd room from north at eastIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19069512
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at east wall in the private hallwayIssued Mar 25, 2026 · fix by Apr 29, 2026 overdue · Violation #18740558
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Mar 11, 2026 · fix by Apr 6, 2026 overdue · rent impairing · Violation #18698540
- COther repairsProperly repair or replace the broken or defective heat riser pipe elbow over the ceiling in the 2nd room from north at eastIssued Mar 11, 2026 · fix by Mar 17, 2026 overdue · Violation #18698538
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance doorIssued Mar 11, 2026 · fix by Mar 25, 2026 overdue · Violation #18698543
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at eastIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18698539
- BBroken doors or locksProperly repair or replace the broken or defective latch set at hopper chute door at public hall, 2nd storyIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18698542
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance doorIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18698544
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 2nd room from north at eastIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18698537
- COther repairsProperly repair or replace the broken or defective hydronic baseboard radiator at south wall in the 3rd room from east at southIssued Mar 9, 2026 · fix by Mar 15, 2026 overdue · Violation #18682445
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east at southIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18682438
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 3rd room from east at southIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18682442
- BElectrical problemsProperly repair or replace the broken or defective electrical light fixture at the ceiling in the 3rd room from east at southIssued Mar 9, 2026 · fix by Apr 13, 2026 overdue · Violation #18682440
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 square feet at the ceiling in the 3rd room from east at southIssued Mar 9, 2026 · fix by Apr 4, 2026 overdue · Violation #18682444
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at northIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18682435
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from east at northIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18682426
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 4, 2026 · fix by Mar 30, 2026 overdue · Violation #18682427
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from east at southIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18682428
- COther repairsProperly repair or replace the broken or defective hydronic baseboard radiator at north wall in the 3rd room from east at northIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18682436
- CLeaks and water damageRepair the leaky and/or defective water supply pipe at the ceiling and north wall in the 3rd room from east at northIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · rent impairing · Violation #18682437
- COther repairsProperly repair or replace the broken or defective shutoff valve to hydronic baseboard radiator at the west wall in the bathroomIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18682446
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the kitchenIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682447
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682448
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682449
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 square feet at the ceiling in the 3rd room from east at northIssued Mar 4, 2026 · fix by Mar 30, 2026 overdue · Violation #18682429
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the private hallwayIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682430
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallwayIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682431
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east at northIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682432
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 3rd room from east at northIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682433
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Mar 4, 2026 · fix by Mar 10, 2026 overdue · Violation #18682451
- BElectrical problemsProperly repair or replace the broken or defective electrical outlets at north wall and west wall in the 3rd room from east at northIssued Mar 4, 2026 · fix by Apr 8, 2026 overdue · Violation #18682434
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance doorIssued Feb 11, 2026 · fix by Feb 25, 2026 overdue · Violation #18633545
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall, 1st storyIssued Nov 25, 2025 · fix by Dec 9, 2025 overdue · Violation #18394350
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and east wall in the private hallwayIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18394344
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and west wall in the 1st room from northIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · rent impairing · Violation #18394348
- CPlumbing, sinks and toiletsReplace with new the missing bathtub in the bathroomIssued Apr 23, 2025 · fix by Apr 29, 2025 overdue · Violation #17844266
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 23, 2025 · fix by May 28, 2025 overdue · Violation #17844267
- CPlumbing, sinks and toiletsReplace with new the missing washbasin in the bathroomIssued Apr 23, 2025 · fix by Apr 29, 2025 overdue · Violation #17844268
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall and the north wall in the 4th room from northIssued Mar 25, 2025 · fix by Apr 29, 2025 overdue · Violation #17772999
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east wall and the south wall in the foyerIssued Mar 25, 2025 · fix by Apr 29, 2025 overdue · Violation #17772998
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 7, 2025 · fix by Feb 2, 2025 overdue · Violation #17601174
- CBroken doors or locksProvide ready access to buildings heating system boiler room door locked at cellarIssued Jan 6, 2025 · fix by Jan 12, 2025 overdue · Violation #17592892
- BBroken doors or locksProperly repair or replace the broken or defective latch set at building entrance door , 1st storyIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17573799
- CBroken doors or locksProvide ready access to buildings heating system door to boiler room locked at cellarIssued Dec 23, 2024 · fix by Dec 29, 2024 overdue · Violation #17573796
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 23, 2024 · fix by Jan 18, 2025 overdue · Violation #17573797
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.