Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Astoria (North)-Ditmars-Steinway

21-24 31 Street, Queens

11105 · 116 apartments · 6 stories · City Council district 22

By · Updated · Data from NYC HPD

C
34open immediately hazardous violations · 29 per 100 apartments
B43Hazardous, open
A12Non-hazardous, open
!89Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning companyONEOTA ASSOCIATES LLC
Landlord (head officer or owner)Ronald Swartz

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Lead paint
    24
  2. Peeling paint and plaster
    18
  3. Broken doors or locks
    14
  4. Leaks and water damage
    11
  5. Other repairs
    9
  6. Missing smoke or CO detector
    6
  7. Mice or rats
    4
  8. Roaches
    1
  9. Mold
    1
  10. Plumbing, sinks and toilets
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C79 days
from 28 closed · NYC typical: 87 days
B93 days
from 23 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Lead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jan 5, 2026 · fix by Jan 29, 2026 overdue · Violation #18550870
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 5, 2026 · fix by Jan 29, 2026 overdue · Violation #18550867
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 5, 2026 · fix by Jan 29, 2026 overdue · Violation #18550868
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 5, 2026 · fix by Jan 29, 2026 overdue · Violation #18550869
  • C
    Lead paintProperly repair with similar material the broken or defective marble tread 2nd from bottom at vestibule area leading to public hall 1st story , section ''d''Issued Feb 10, 2025 · fix by Feb 16, 2025 overdue · Violation #17679649
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 29, 2024 · fix by Feb 24, 2024 overdue · Violation #16628531
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 29, 2024 · fix by Feb 24, 2024 overdue · Violation #16628530
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes at center court north wall at fire escape, 4th storyIssued Aug 17, 2023 · fix by Sep 21, 2023 overdue · Violation #16159260
  • C
    Other repairsProvide ready access to buildings heating system from 1st floor to cellar at boiler roomIssued Mar 13, 2023 · fix by Mar 19, 2023 overdue · Violation #15767017
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2021 · fix by Dec 5, 2021 overdue · Violation #14662093
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2021 · fix by Dec 5, 2021 overdue · Violation #14662092
  • C
    Broken doors or locksArrange and make self-closing the doors entranceIssued Mar 31, 2021 · fix by Apr 26, 2021 overdue · Violation #14096842
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door to boiler room at cellarIssued Dec 21, 2020 · fix by Dec 27, 2020 overdue · Violation #13952328
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at east wall, public hall stairs to roof , 6th storyIssued Nov 4, 2019 · fix by Dec 9, 2019 overdue · Violation #13408146
  • B
    Other repairsProvide an adequate supply of gas to the fixtures rangeIssued Oct 25, 2017 · fix by Nov 29, 2017 overdue · rent impairing · Violation #12033149
  • B
    Other repairsProvide an adequate supply of gas to the fixtures gas-range in the kitchenIssued Sep 7, 2017 · fix by Oct 12, 2017 overdue · rent impairing · Violation #11960885
  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective fire retardant plaster at north wall at public hall, 1st storyIssued Aug 17, 2017 · fix by Sep 21, 2017 overdue · Violation #11932031
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from northIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · rent impairing · Violation #11900257
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 2nd room from northIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · Violation #11900253
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the bathroomIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · Violation #11900220
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceailing in the 1st room from northIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · rent impairing · Violation #11900264
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 1st room from northIssued Jul 28, 2017 · fix by Sep 1, 2017 overdue · Violation #11900265
  • B
    Mice or ratsAbate the nuisance consisting of mice in the entire apartmentIssued Jul 26, 2017 · fix by Aug 30, 2017 overdue · Violation #11894104
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 26, 2017 · fix by Aug 23, 2017 overdue · Violation #11894581
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 26, 2017 · fix by Aug 23, 2017 overdue · Violation #11894582
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from eastIssued Jul 17, 2017 · fix by Aug 21, 2017 overdue · Violation #11878037
  • B
    Leaks and water damageRepair the roof so that it will not leak at the ceiling in the 1st room from eastIssued Jul 17, 2017 · fix by Aug 21, 2017 overdue · rent impairing · Violation #11878040
  • B
    Other repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued May 17, 2017 · fix by Jun 21, 2017 overdue · rent impairing · Violation #11784289
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallwayIssued Jan 19, 2017 · fix by Feb 23, 2017 overdue · Violation #11612277
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all wall and ceiling in the bathroomIssued Jan 19, 2017 · fix by Feb 23, 2017 overdue · Violation #11612273
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 19, 2017 · fix by Feb 23, 2017 overdue · Violation #11612251
  • B
    Other repairsSection 27-2010, 2011, 2012 adm code remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at center court , 1st storyIssued Jul 25, 2016 · fix by Aug 29, 2016 overdue · Violation #11324284
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchenIssued Jul 5, 2013 · fix by Aug 9, 2013 overdue · Violation #9891062
  • C
    Lead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set…Issued Mar 25, 2013 · fix by Apr 20, 2013 overdue · Violation #9780458
  • C
    Lead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set…Issued Mar 18, 2013 · fix by Apr 13, 2013 overdue · Violation #9771399
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartmentIssued Sep 21, 2011 · fix by Oct 26, 2011 overdue · Violation #9117119
  • B
    Leaks and water damageSection 27-2005 adm code repair the roof so that it will not leak over entireIssued Sep 21, 2011 · fix by Oct 26, 2011 overdue · rent impairing · Violation #9117118
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold walls and ceiling in the 4th room from northIssued Sep 21, 2011 · fix by Oct 26, 2011 overdue · Violation #9117122
  • B
    Leaks and water damageSection 27-2005 adm code & 309 m/d law abate the nuisance consisting of concealed water leak east wall in the 1st room from northIssued Sep 21, 2011 · fix by Oct 26, 2011 overdue · Violation #9117124
  • B
    Missing smoke or CO detectorSection 27-2045 adm code repair or replace the smoke detector missing in the entire apartmentIssued Apr 11, 2011 · fix by May 16, 2011 overdue · Violation #8895642
  • B
    Missing smoke or CO detectorProvide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartmentIssued Apr 11, 2011 · fix by May 16, 2011 overdue · Violation #8895643
  • B
    Other repairsSection 27-2005 adm code properly repair the broken or defective counter balance at lower window sash. bldg. d in the 1st room from northIssued Apr 11, 2011 · fix by May 16, 2011 overdue · Violation #8895639
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls bldg. d. in the entire apartmentIssued Apr 11, 2011 · fix by May 16, 2011 overdue · Violation #8895640
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective fire retarding ceiling at stairs bulkhead to roof at public hall, 6th…Issued Aug 28, 2009 · fix by Oct 2, 2009 overdue · Violation #8031321
  • B
    Leaks and water damageSection 27-2005 adm code repair the roof so that it will not leak over ceiling at stairs bulkhead to roof at public hall, 6th storyIssued Aug 28, 2009 · fix by Oct 2, 2009 overdue · rent impairing · Violation #8031322
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 4th room from northIssued Aug 13, 2009 · fix by Sep 17, 2009 overdue · Violation #8005223
  • C
    Lead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated…Issued Aug 13, 2009 · fix by Sep 8, 2009 overdue · Violation #8009243
  • C
    Lead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set…Issued Aug 13, 2009 · fix by Sep 8, 2009 overdue · Violation #8009242
  • B
    Peeling paint and plasterSection 27-2005 adm code repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the foyerIssued Aug 13, 2009 · fix by Sep 17, 2009 overdue · Violation #8007960
  • B
    Leaks and water damageSection 27-2005 adm code repair the roof so that it will not leak at ceiling at stair bulkhead at public hall, 6th storyIssued Aug 13, 2009 · fix by Sep 17, 2009 overdue · rent impairing · Violation #8005229
  • B
    Other repairsSection 27-2005 adm code properly repair with similar material the broken or defective fire retarded ceiling and walls at stair bulkhead at public hall, 6th…Issued Aug 13, 2009 · fix by Sep 17, 2009 overdue · Violation #8005227
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2008 · fix by Oct 11, 2008 overdue · Violation #7470493
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2008 · fix by Oct 11, 2008 overdue · Violation #7470495
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2008 · fix by Oct 11, 2008 overdue · Violation #7470494
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 15, 2008 · fix by Oct 11, 2008 overdue · Violation #7470491
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 29, 2008 · fix by Aug 24, 2008 overdue · Violation #7396646
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 29, 2008 · fix by Aug 24, 2008 overdue · Violation #7396644
  • C
    Broken doors or locksD26-10.01 adm code & 309 m/d law abate the nuisance consisting of double cylinder key operated lock at entrance 5 styIssued Jun 19, 2008 · fix by Jun 25, 2008 overdue · Violation #140377
  • B
    Broken doors or locksD26-10.01, 10.05 adm code arrange and make self-closing the doors entrance to 2 styIssued Jun 19, 2008 · fix by Jul 24, 2008 overdue · Violation #140373
  • B
    Missing smoke or CO detectorD26-20.08 adm code repair or replace the smoke detector missing 5 styIssued Jun 19, 2008 · fix by Jul 24, 2008 overdue · Violation #140375

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

612017
32018
32019
22020
72021
162023
322024
12025
162026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 224 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.