Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

2855 8 Avenue, Manhattan

10039 · 49 apartments · 6 stories · City Council district 9

By · Updated · Data from NYC HPD

C
18open immediately hazardous violations · 37 per 100 apartments
B34Hazardous, open
A7Non-hazardous, open
!49Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyNORTHERN MAN EQUITIES
Landlord (head officer or owner)Craig Livingston

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    22
  2. Broken doors or locks
    12
  3. Roaches
    6
  4. Leaks and water damage
    5
  5. No heat or hot water
    3
  6. Missing smoke or CO detector
    3
  7. Peeling paint and plaster
    3
  8. Mold
    3
  9. Plumbing, sinks and toilets
    2
  10. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C87 days
from 79 closed · NYC typical: 87 days
B121 days
from 88 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · rent impairing · Violation #19346468
  • C
    No heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19346464
  • C
    RoachesAbate the infestation consisting of roaches at compactor closet, 1st storyIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19346463
  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346465
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at sink in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19346467
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2026 · fix by Nov 30, 2026 · Violation #19346466
  • B
    Other repairsRemove all encumbrances consisting of household items at public hall, 1st storyIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · rent impairing · Violation #19266861
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at fire door at bulkheadIssued Sep 29, 2026 · fix by Oct 13, 2026 overdue · Violation #19255845
  • C
    No heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Sep 29, 2026 · fix by Oct 5, 2026 overdue · Violation #19261185
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the entranceIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19255846
  • C
    Other repairsProperly repair or replace the broken or defective missing wire glass pane at upper sash at the first window from west at northIssued Sep 29, 2026 · fix by Oct 5, 2026 overdue · Violation #19255844
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance door at public hall, 1st storyIssued Sep 9, 2026 · fix by Sep 15, 2026 overdue · rent impairing · Violation #19155364
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19150531
  • B
    Other repairsProperly repair with similar material the broken or defective sub wood floor in the 1st room from northIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19150530
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Sep 2, 2026 · fix by Oct 7, 2026 overdue · Violation #19150525
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150527
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of water bugs in the entire apartmentIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150532
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flys gnats at compactor closet, 1st storyIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19150528
  • B
    Other repairsProperly repair with similar material the broken or defective wood counter top at south in the kitchenIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19110705
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2026 · fix by Aug 31, 2026 overdue · Violation #19110704
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · rent impairing · Violation #19110707
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base bottom at washbasin in the bathroomIssued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19110706
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable 2 motion electromagnetic locking device installed at building entrance door , 1st storyIssued Jul 20, 2026 · fix by Jul 26, 2026 overdue · rent impairing · Violation #19087567
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at 1st fire door from south at west at public hall, 1st storyIssued Jul 20, 2026 · fix by Aug 3, 2026 overdue · Violation #19087558
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at building entrance door , 1st storyIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19087569
  • B
    Other repairsOrder to repair/vacate order must remain posted until such time as the order is rescinded. a copy for posting can be found through hpdonline (www.nyc.gov/hpd).…Issued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19079719
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable two motion electromagnetic locking device installed at the building entreance door , 1st storyIssued Jul 9, 2026 · fix by Jul 15, 2026 overdue · rent impairing · Violation #19063021
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door , 1st storyIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063023
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at west and south walls in the 2nd bathroom from eastIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · Violation #19033620
  • B
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device at building entrance doorIssued Jun 25, 2026 · fix by Jul 30, 2026 overdue · rent impairing · Violation #19033642
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building entrance doorIssued Jun 22, 2026 · fix by Jun 28, 2026 overdue · rent impairing · Violation #19021204
  • B
    Broken doors or locksProvide an acceptable heavy duty lock and latch set incase of power outage at building entrance doorIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19021205
  • C
    No heat or hot waterProvide written notice to the tenants at least twenty-four hours prior to essential service interruption by posting a notice in a prominent place within the…Issued Jun 18, 2026 · fix by Jun 24, 2026 overdue · Violation #19012315
  • B
    Other repairsRefit the window at east wall in the 2nd room from north at eastIssued Feb 4, 2026 · fix by Mar 11, 2026 overdue · Violation #18615899
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable heavy duty key operated lockset at building entrance doorIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · Violation #18548508
  • B
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device at building entrance doorIssued Jan 6, 2026 · fix by Feb 10, 2026 overdue · rent impairing · Violation #18548507
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18548506
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18548505
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18548502
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic soap holder at west wall in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18548504
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 20 sq ft at all walls and ceiling in the bathroomIssued Oct 20, 2025 · fix by Nov 15, 2025 overdue · Violation #18305231
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of fire damage in the entire apartmentIssued Sep 3, 2025 · fix by Sep 9, 2025 overdue · Violation #18185889
  • B
    Other repairsProperly repair or replace the broken or defective intercom bell buzzer system from building entrance to north wall in the foyerIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17161571
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 20, 2024 · fix by Jul 16, 2024 overdue · Violation #17062040
  • B
    MoldTrace and repair the source and abate the visible mold condition approx. 5 sq.ft at west wall and 5 sq.ft at south wall in the bathroomIssued Jun 20, 2024 · fix by Jul 25, 2024 overdue · Violation #17062065
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 1st room from eastIssued Nov 17, 2023 · fix by Dec 22, 2023 overdue · Violation #16379004
  • B
    Other repairsProperly repair or replace the broken or defective intercommunication system from building entrance to west wall in the 1st room from northIssued Nov 9, 2023 · fix by Dec 14, 2023 overdue · Violation #16345754
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer from building entrance to the apartment in the entranceIssued Sep 22, 2023 · fix by Oct 27, 2023 overdue · Violation #16221919
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 16, 2022 · fix by Sep 11, 2022 overdue · Violation #15319539
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles floor in the kitchenIssued Jul 2, 2021 · fix by Aug 6, 2021 overdue · Violation #14416034
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 15, 2021 · fix by Apr 10, 2021 overdue · Violation #14072045
  • B
    MoldTrace and repair the source and abate the visible mold condition 10 square feet at walls and ceiling in first closet from north at east in the private hallwayIssued Jul 14, 2020 · fix by Aug 18, 2020 overdue · Violation #13722474

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

362017
82018
602019
672020
1482021
762022
672023
832024
462025
592026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 712 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.