Housing violations · Harlem (North)
247 West 145 Street, Manhattan
10039 · 41 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs20
- Peeling paint and plaster9
- Leaks and water damage5
- Broken doors or locks5
- Mold2
- Roaches2
- Missing smoke or CO detector2
- Mice or rats2
- Lead paint2
- No heat or hot water1
- Electrical problems1
- Plumbing, sinks and toilets1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 78 closed · NYC typical: 87 days
from 67 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective spring balance at lower sash, at 2nd window from west at north wall in the 1st room from north at westIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19284099
- BNo heat or hot waterProvide adequate supply of hot water for the fixtures at bath tub in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · rent impairing · Violation #19284097
- BLeaks and water damageRepair the leaky and/or defective faucets at bath tub in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19284096
- COther repairsProperly repair or replace the broken or defective spring balance at upper sash at 2nd window from west at north wall in the 1st room from north at westIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19284098
- CBroken doors or locksProperly repair or replace the broken or defective missing latching plate at door frame in the entranceIssued Sep 17, 2026 · fix by Sep 23, 2026 overdue · Violation #19226576
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sqft at ceiling and east wall in the 3rd room from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19226579
- BOther repairsProperly repair with similar material the broken or defective eroded and separating wood floor in the 3rd room from northIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19226581
- BBroken doors or locksProperly repair or replace the broken or defective latch set at recycling room door , 4th storyIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19226587
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 1st room from northIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #18990988
- BOther repairsProperly repair or replace the broken or defective light switch at south wall in the 3rd room from northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18990990
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 15, 2026 · fix by Jul 11, 2026 overdue · Violation #18990992
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallwayIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18990991
- BElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at light fixture at ceiling in the 3rd room from northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18990989
- BOther repairsProperly repair or replace the broken or defective intercom system from vestibule to west wall in the foyerIssued Jun 10, 2026 · fix by Jul 15, 2026 overdue · Violation #18990993
- BOther repairsProperly repair or replace the broken or defective bell and buzzar intercom system from the building entrance to the panel at west wall in the private hallwayIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818648
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818650
- BOther repairsProperly repair or replace the broken or defective bell and buzzar intercom system from the building entrance to the panel at south wall in the private hallwayIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818643
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and east wall in the private hallwayIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818644
- BOther repairsProperly repair or replace the broken or defective bell and buzzar intercom system from the building entrance to the panel at east wall in the private hallwayIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818645
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the bathtub in the bathroomIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818647
- BOther repairsProperly repair or replace the broken or defective upper and lower refrigerator gaskets in the kitchenIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818646
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18818649
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to apartment wall panel at north in the foyerIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18761737
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at south wall in the kitchenIssued Apr 7, 2026 · fix by May 12, 2026 overdue · Violation #18761740
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18262537
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2025 · fix by Oct 28, 2025 overdue · Violation #18262538
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 17, 2025 · fix by Jul 13, 2025 overdue · Violation #18043042
- BOther repairsProperly repair or replace the broken or defective baseboard heater cover at south wall in the private hallwayIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17917962
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket seal at refrigerator and freezer doors in the kitchenIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17917961
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued May 28, 2025 · fix by Jul 2, 2025 overdue · Violation #17917960
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft at ceiling in the bathroomIssued Jan 22, 2025 · fix by Feb 17, 2025 overdue · Violation #17646723
- BOther repairsReplace with new the missing metal base board cover at north wall in the 1st bedroom from north at westIssued Jan 9, 2025 · fix by Feb 13, 2025 overdue · Violation #17612658
- BOther repairsReplace with new the missing metal base board cover at west wall in the 2nd bedroom from north at westIssued Jan 9, 2025 · fix by Feb 13, 2025 overdue · Violation #17612645
- BOther repairsProvide covers to heaters at base board in the 2nd bedroom from north at westIssued Jan 9, 2025 · fix by Feb 13, 2025 overdue · Violation #17603277
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 2nd room from northIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · Violation #17394136
- BOther repairsProperly repair or replace the broken or defective mechanical ventilation system at ceiling in the kitchenIssued Nov 4, 2024 · fix by Dec 9, 2024 overdue · Violation #17394092
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Nov 4, 2024 · fix by Nov 10, 2024 overdue · Violation #17394142
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Sep 30, 2024 · fix by Oct 26, 2024 overdue · Violation #17308446
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at eastIssued Sep 27, 2024 · fix by Nov 1, 2024 overdue · Violation #17304663
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refridgerator door in the kitchenIssued Sep 27, 2024 · fix by Nov 1, 2024 overdue · Violation #17304662
- BLeaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Sep 27, 2024 · fix by Nov 1, 2024 overdue · Violation #17304659
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 3, 2024 · fix by Oct 8, 2024 overdue · Violation #17237728
- BLeaks and water damageRepair the roof so that it will not leak over ceiling in the 4th room from northIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · rent impairing · Violation #17196057
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued Aug 14, 2024 · fix by Sep 18, 2024 overdue · Violation #17196061
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east, south and west wall in the kitchenIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16959211
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from northIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16959212
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north and west wall in the 2nd room from northIssued May 10, 2024 · fix by Jun 14, 2024 overdue · Violation #16959213
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north at eastIssued May 7, 2024 · fix by May 13, 2024 overdue · Violation #16960275
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.