Housing violations · Harlem (North)
2890 Frederick Douglass Boulevard, Manhattan
10039 · 42 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
25 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs56
- Leaks and water damage31
- Peeling paint and plaster29
- Roaches13
- Mice or rats10
- Broken doors or locks10
- Plumbing, sinks and toilets10
- Missing smoke or CO detector7
- Mold7
- No heat or hot water5
- Electrical problems4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 152 closed · NYC typical: 87 days
from 306 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterProperly repair with similar material the broken or defective defective paint and plaster at ceiling at public hall, 6th storyIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19376978
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 29, 2026 · fix by Nov 24, 2026 · rent impairing · Violation #19333265
- BOther repairsProperly repair or replace the broken or defective bell buzzer/intercom system from building entrance to the east wall in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321835
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321833
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321834
- CBroken doors or locksProvide ready access to buildings heating system inaccessible door at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19321836
- CMice or ratsAbate the infestation consisting of mice at public hall, 2nd storyIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19303940
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19309446
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309438
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303938
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19309455
- BLeaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308118
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19308117
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19303936
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303937
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at west wall at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309894
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles at bathtub area at west, east and south walls in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309442
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309896
- BOther repairsProperly repair or replace the broken or defective ligh fixture at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309435
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308119
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19277336
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 7, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19277335
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277729
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277728
- BLeaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 6th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270403
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19269321
- CBroken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19269745
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Oct 3, 2026 overdue · rent impairing · Violation #19269747
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Oct 4, 2026 overdue · rent impairing · Violation #19270397
- CBroken doors or locksProvide ready access to buildings heating system elevator locked at basement at boiler room, 1st storyIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19270399
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19270400
- BOther repairsProperly repair or replace the broken or defective intercom system from building entrance to east wall in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265867
- BOther repairsRemove all encumbrances consisting of household items and garbage bags at public hall stairs, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269324
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270401
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the trash accumulation at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269743
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269748
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269750
- BLeaks and water damageRepair the roof so that it will not leak at south wall in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269751
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269753
- BLeaks and water damageRepair the roof so that it will not leak at above ceiling in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269754
- BOther repairsRemove all encumbrances consisting of household storage at public hall, 2nd storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270406
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 6th storyIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · rent impairing · Violation #19265868
- CBroken doors or locksProvide ready access to buildings heating system door locked at celler at boiler roomIssued Oct 2, 2026 · fix by Oct 8, 2026 overdue · Violation #19265866
- BLeaks and water damageRepair the roof so that it will not leak at ceiling and south wall at public hall, 6th storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19249343
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249348
- BOther repairsProperly repair with similar material the broken or defective wooden floor in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249350
- BOther repairsProperly repair with similar material the broken or defective fire retarding material at ceiling and south wall at public hall, 6th storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249345
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249347
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19249349
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 5th room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19249346
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floors at the 1st story public hall , 1st storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249352
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206859
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206863
- BOther repairsProperly repair or replace the broken or defective intercom system in the foyerIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206823
- BOther repairsProperly repair or replace the broken or defective at ceiling light fixture in the 2nd bathroom from eastIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101957
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101959
- BOther repairsProperly repair or replace the broken or defective ventilation system at ceiling in the 2nd bathroom from eastIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101956
- BLeaks and water damageRepair the roof so that it will not leak above ceiling at public hall, 6th storyIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · rent impairing · Violation #19101954
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 6th storyIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · rent impairing · Violation #19104172
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jul 24, 2026 · fix by Jul 30, 2026 overdue · Violation #19092575
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.