Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Harlem (North)

2890 Frederick Douglass Boulevard, Manhattan

10039 · 42 apartments · 6 stories · City Council district 9

By · Updated · Data from NYC HPD

C
41open immediately hazardous violations · 98 per 100 apartments
B104Hazardous, open
A37Non-hazardous, open
!148Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

25 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyHURSTON PLC. EQUITIES LLC
Landlord (head officer or owner)Craig Livingston

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    56
  2. Leaks and water damage
    31
  3. Peeling paint and plaster
    29
  4. Roaches
    13
  5. Mice or rats
    10
  6. Broken doors or locks
    10
  7. Plumbing, sinks and toilets
    10
  8. Missing smoke or CO detector
    7
  9. Mold
    7
  10. No heat or hot water
    5
  11. Electrical problems
    4

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C93 days
from 152 closed · NYC typical: 87 days
B120 days
from 306 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Peeling paint and plasterProperly repair with similar material the broken or defective defective paint and plaster at ceiling at public hall, 6th storyIssued Nov 13, 2026 · fix by Dec 18, 2026 · Violation #19376978
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Oct 29, 2026 · fix by Nov 24, 2026 · rent impairing · Violation #19333265
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer/intercom system from building entrance to the east wall in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19321835
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321833
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 25, 2026 overdue · rent impairing · Violation #19321834
  • C
    Broken doors or locksProvide ready access to buildings heating system inaccessible door at boiler roomIssued Oct 26, 2026 · fix by Nov 1, 2026 overdue · Violation #19321836
  • C
    Mice or ratsAbate the infestation consisting of mice at public hall, 2nd storyIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19303940
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19309446
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309438
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303938
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19309455
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308118
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19308117
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19303936
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 19, 2026 · fix by Nov 14, 2026 overdue · Violation #19303937
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at west wall at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309894
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic tiles at bathtub area at west, east and south walls in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309442
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at west wall at public hall, 6th storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309896
  • B
    Other repairsProperly repair or replace the broken or defective ligh fixture at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19309435
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308119
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19277336
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 7, 2026 · fix by Oct 7, 2026 overdue · rent impairing · Violation #19277335
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277729
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 7, 2026 · fix by Nov 11, 2026 overdue · Violation #19277728
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling at public hall, 6th storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270403
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19269321
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at basement at boiler roomIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19269745
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Oct 3, 2026 overdue · rent impairing · Violation #19269747
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 5, 2026 · fix by Oct 4, 2026 overdue · rent impairing · Violation #19270397
  • C
    Broken doors or locksProvide ready access to buildings heating system elevator locked at basement at boiler room, 1st storyIssued Oct 5, 2026 · fix by Oct 11, 2026 overdue · Violation #19270399
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19270400
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from building entrance to east wall in the private hallwayIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19265867
  • B
    Other repairsRemove all encumbrances consisting of household items and garbage bags at public hall stairs, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269324
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19270401
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the trash accumulation at public hall, 1st storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269743
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 5, 2026 · fix by Oct 31, 2026 overdue · Violation #19269748
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269750
  • B
    Leaks and water damageRepair the roof so that it will not leak at south wall in the foyerIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269751
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · Violation #19269753
  • B
    Leaks and water damageRepair the roof so that it will not leak at above ceiling in the 3rd room from eastIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19269754
  • B
    Other repairsRemove all encumbrances consisting of household storage at public hall, 2nd storyIssued Oct 5, 2026 · fix by Nov 9, 2026 overdue · rent impairing · Violation #19270406
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 6th storyIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · rent impairing · Violation #19265868
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at celler at boiler roomIssued Oct 2, 2026 · fix by Oct 8, 2026 overdue · Violation #19265866
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling and south wall at public hall, 6th storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19249343
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249348
  • B
    Other repairsProperly repair with similar material the broken or defective wooden floor in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249350
  • B
    Other repairsProperly repair with similar material the broken or defective fire retarding material at ceiling and south wall at public hall, 6th storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249345
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249347
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19249349
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling in the 5th room from eastIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · rent impairing · Violation #19249346
  • B
    Other repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the floors at the 1st story public hall , 1st storyIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249352
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206859
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206863
  • B
    Other repairsProperly repair or replace the broken or defective intercom system in the foyerIssued Sep 9, 2026 · fix by Oct 14, 2026 overdue · Violation #19206823
  • B
    Other repairsProperly repair or replace the broken or defective at ceiling light fixture in the 2nd bathroom from eastIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101957
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101959
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at ceiling in the 2nd bathroom from eastIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · Violation #19101956
  • B
    Leaks and water damageRepair the roof so that it will not leak above ceiling at public hall, 6th storyIssued Jul 28, 2026 · fix by Sep 1, 2026 overdue · rent impairing · Violation #19101954
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 6th storyIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · rent impairing · Violation #19104172
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jul 24, 2026 · fix by Jul 30, 2026 overdue · Violation #19092575

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

992017
722018
702019
752020
2542021
2002022
1322023
2512024
1662025
1812026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,598 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.