Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Astoria (North)-Ditmars-Steinway

21-05 33 Street, Queens

11105 · 39 apartments · 5 stories · City Council district 22

By · Updated · Data from NYC HPD

C
46open immediately hazardous violations · 118 per 100 apartments
B70Hazardous, open
A19Non-hazardous, open
!135Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

12 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyACROPOLIS GARDENS REALTY CORP.
Landlord (head officer or owner)Harry Hirsch
Managed byHHRMC, LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    43
  2. Lead paint
    25
  3. Other repairs
    22
  4. Mold
    16
  5. Leaks and water damage
    7
  6. Mice or rats
    6
  7. Electrical problems
    6
  8. Roaches
    4
  9. Broken doors or locks
    4
  10. Plumbing, sinks and toilets
    3

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C65 days
from 22 closed · NYC typical: 87 days
B48 days
from 30 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 19, 2026 · fix by Jun 14, 2026 overdue · Violation #18940167
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from northIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18940166
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 2nd room from northIssued May 19, 2026 · fix by Jun 23, 2026 overdue · Violation #18940172
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 2nd room from northIssued May 19, 2026 · fix by May 25, 2026 overdue · Violation #18940170
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 19, 2026 · fix by Jun 14, 2026 overdue · Violation #18940168
  • B
    Other repairsProperly repair with similar material the broken or defective cracked concrete flashing at parapet wall at east exterior wallIssued Jun 27, 2025 · fix by Aug 1, 2025 overdue · Violation #18045848
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at ceiling in the bathroomIssued Mar 19, 2025 · fix by Apr 23, 2025 overdue · Violation #17776305
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wash basin in the bathroomIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17759799
  • B
    Other repairsProperly repair with similar material the broken or defective wood base cabinet in the bathroomIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17759801
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 3rd room from east at northIssued Dec 30, 2024 · fix by Jan 5, 2025 overdue · Violation #17584949
  • C
    Mice or ratsAbate the infestation consisting of rodents rats at basementIssued Dec 30, 2024 · fix by Jan 25, 2025 overdue · rent impairing · Violation #17584964
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall at closet in the 3rd room from east at northIssued Dec 30, 2024 · fix by Jan 5, 2025 overdue · Violation #17584954
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color north wall in the 3rd room from east at northIssued Dec 30, 2024 · fix by Jan 5, 2025 overdue · Violation #17584951
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 30, 2024 · fix by Jan 25, 2025 overdue · Violation #17584960
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 30, 2024 · fix by Jan 25, 2025 overdue · Violation #17584961
  • C
    Mice or ratsAbate the infestation consisting of rodents rats at south court yardIssued Dec 30, 2024 · fix by Jan 25, 2025 overdue · rent impairing · Violation #17584966
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall at closet in the 3rd room from east at northIssued Dec 30, 2024 · fix by Feb 3, 2025 overdue · Violation #17584955
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at public hallIssued Dec 10, 2024 · fix by Dec 16, 2024 overdue · Violation #17541699
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Dec 10, 2024 · fix by Dec 16, 2024 overdue · Violation #17541700
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 19, 2024 · fix by Dec 15, 2024 overdue · Violation #17426647
  • C
    MoldTrace and repair the source and abate the visible mold condition at south wall in the 4th room from eastIssued Sep 16, 2024 · fix by Oct 12, 2024 overdue · Violation #17278362
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 25, 2024 · fix by Aug 20, 2024 overdue · Violation #17142250
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the bathroomIssued Jul 25, 2024 · fix by Jul 31, 2024 overdue · Violation #17142258
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling and west wall in the bathroomIssued Jul 25, 2024 · fix by Jul 31, 2024 overdue · Violation #17142265
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the 2nd room from north at westIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17105004
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from north at eastIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17104993
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 8, 2024 · fix by Aug 3, 2024 overdue · Violation #17104999
  • C
    MoldTrace and repair the source and abate the visible mold condition in room north 1 east at east wall in the 2nd room from north at eastIssued Jul 8, 2024 · fix by Aug 3, 2024 overdue · Violation #17105878
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 4th room from north at eastIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17104995
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 8, 2024 · fix by Aug 3, 2024 overdue · Violation #17105000
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from north at westIssued Jul 8, 2024 · fix by Aug 12, 2024 overdue · Violation #17105005
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls at closet in the 1st room from eastIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16993097
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16993121
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from east at southIssued May 21, 2024 · fix by Jun 25, 2024 overdue · Violation #16993120
  • B
    MoldTrace and repair the source and abate the visible mold condition at south wall in the 4th room from north at eastIssued Nov 28, 2023 · fix by Jan 2, 2024 overdue · Violation #16469585
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electrical outlet at east wall in the 1st room from east at northIssued Nov 15, 2023 · fix by Nov 21, 2023 overdue · Violation #16376066
  • C
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at east wall in the 1st room from east at northIssued Nov 14, 2023 · fix by Nov 20, 2023 overdue · Violation #16376068
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at northIssued Nov 14, 2023 · fix by Dec 19, 2023 overdue · Violation #16376069
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 22, 2023 · fix by Oct 27, 2023 overdue · Violation #16240752
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective due to inoperable hinges at door in the entranceIssued Sep 22, 2023 · fix by Oct 6, 2023 overdue · Violation #16240751
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240760
  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at door in the entranceIssued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240748
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240744
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240745
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240746
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240747
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240749
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240753
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240754
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240755
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240756
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240758
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Sep 20, 2023 · fix by Oct 25, 2023 overdue · Violation #16240759
  • C
    Other repairsProperly repair with similar material the broken or defective eroded brick and mortar joints , 5th storyIssued Sep 5, 2023 · fix by Sep 11, 2023 overdue · Violation #16194266
  • C
    Other repairsProperly repair with similar material the broken or defective eroded brick and mortar joints , 5th storyIssued Sep 5, 2023 · fix by Sep 11, 2023 overdue · Violation #16194269
  • C
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel at bathtub in the bathroomIssued Sep 5, 2023 · fix by Sep 11, 2023 overdue · Violation #16194214
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 1, 2023 · fix by Sep 7, 2023 overdue · Violation #16202789
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchenIssued Aug 22, 2023 · fix by Sep 26, 2023 overdue · Violation #16185244
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south ,east and west wall in the 3rd room from northIssued Aug 22, 2023 · fix by Sep 26, 2023 overdue · Violation #16185248
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Aug 17, 2023 · fix by Aug 21, 2023 overdue · Violation #16170800

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

42017
22018
492019
232020
1192021
1532022
872023
522024
62025
52026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 632 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.