Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Astoria (Central)

32-52 33 Street, Queens

11106 · 60 apartments · 6 stories · City Council district 22

By · Updated · Data from NYC HPD

C
4open immediately hazardous violations · 7 per 100 apartments
B11Hazardous, open
A2Non-hazardous, open
!17Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Who owns and manages it

Owning company32-52 33RD STREET, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    5
  2. Other repairs
    3
  3. Mold
    2
  4. Electrical problems
    2
  5. No heat or hot water
    2
  6. Lead paint
    1
  7. Leaks and water damage
    1
  8. Broken doors or locks
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C97 days
from 44 closed · NYC typical: 87 days
B507 days
from 62 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition more than 10 sqft. but less than 30 sqft. observed at ceiling in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19145034
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wires east wall in the foyerIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19006926
  • B
    Lead paintProperly repair or replace the broken or defective latch assembly 1st from north at east leading to east yard at public hall, 1st story, section at eastIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19006929
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19006921
  • B
    Electrical problemsProperly secure the loose electrical light fixture ceiling in the bathroomIssued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19006927
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724751
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Mar 20, 2026 · fix by Apr 24, 2026 overdue · Violation #18724756
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinge in the entranceIssued Jan 24, 2025 · fix by Feb 7, 2025 overdue · Violation #17644324
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures. in the entire apartmentIssued Jan 24, 2025 · fix by Jan 30, 2025 overdue · Violation #17644322
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 4 sq ft at ceiling in the 1st room from eastIssued Nov 6, 2024 · fix by Dec 11, 2024 overdue · Violation #17406635
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Jul 9, 2024 · fix by Aug 13, 2024 overdue · Violation #17103135
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from eastIssued Jul 9, 2024 · fix by Aug 13, 2024 overdue · Violation #17103137
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of scalding hotwater consisting of 180 degrees exceeding the maximum allowable temperature of 130 degrees at all…Issued Feb 20, 2024 · fix by Feb 26, 2024 overdue · Violation #16680694
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of scalding hot water. exceeding the maximum temperture of 130 degrees in the kitchenIssued Nov 20, 2023 · fix by Nov 26, 2023 overdue · Violation #16394289
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Apr 17, 2023 · fix by May 22, 2023 overdue · Violation #15922647

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

82019
42022
302023
582024
162025
402026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 179 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.