Housing violations · Harlem (North)
283 West 147 Street, Manhattan
10039 · 23 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs9
- Mold6
- Plumbing, sinks and toilets5
- Roaches3
- Peeling paint and plaster3
- Broken doors or locks3
- Missing smoke or CO detector2
- Electrical problems1
- Leaks and water damage1
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 78 closed · NYC typical: 87 days
from 130 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19208855
- BPlumbing, sinks and toiletsProperly secure the loose metal counter top at sink in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208852
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208854
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19208853
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south, north, west, east walls and ceilung in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19149122
- BMoldTrace and repair the source and abate the visible mold condition at ceiling, south, north and east walls in the bathroomIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19149123
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · Violation #19149124
- BOther repairsRemove all encumbrances consisting of household items and trash at public hall, 6th storyIssued Aug 20, 2026 · fix by Sep 24, 2026 overdue · rent impairing · Violation #19149125
- BBroken doors or locksProperly repair with similar material the broken or defective door at south wall in the bathroomIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19060069
- BOther repairsAbate the nuisance consisting of pests. evidence of flyes in the entire apartmentIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19060066
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures to all wall outlets and ceiling light fixtures in the entire apartmentIssued Jul 10, 2026 · fix by Jul 16, 2026 overdue · Violation #19060064
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenetteIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · rent impairing · Violation #19070741
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 10, 2026 · fix by Aug 5, 2026 overdue · Violation #19060068
- BPlumbing, sinks and toiletsProperly secure the loose washbasin at north wall in the bathroomIssued Jul 10, 2026 · fix by Aug 14, 2026 overdue · Violation #19060065
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and north wall in the bathroomIssued Jun 3, 2026 · fix by Jul 8, 2026 overdue · Violation #18972873
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at centerIssued Jun 3, 2026 · fix by Jul 8, 2026 overdue · Violation #18972872
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Apr 10, 2026 · fix by May 15, 2026 overdue · Violation #18773920
- CMoldTrace and repair the source and abate the visible mold condition more than 30 sq ft at north and west walls in the 1st room from north at westIssued Jan 22, 2026 · fix by Feb 17, 2026 overdue · Violation #18569698
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Sep 25, 2025 · fix by Oct 19, 2025 overdue · Violation #18258916
- BBroken doors or locksProperly repair or replace the broken or defective doors at base cabinet at east wall in the kitchenIssued Jul 7, 2025 · fix by Aug 11, 2025 overdue · Violation #18079960
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective silicone caulk at tiles around bathtub in the bathroomIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17251886
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulkingaround bathtub in the bathroomIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · Violation #17164756
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles at public hall, 6th storyIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · Violation #17164805
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Aug 2, 2024 · fix by Sep 6, 2024 overdue · Violation #17164772
- BMoldTrace and repair the source and abate the visible mold condition approximately 8 sq ft at ceiling , 6 sq ft at south wall in the bathroomIssued Sep 14, 2023 · fix by Oct 19, 2023 overdue · Violation #16220889
- BMoldTrace and repair the source and abate the visible mold condition at ceiling approx 6 sq ft in the bathroomIssued Feb 14, 2023 · fix by Mar 21, 2023 overdue · Violation #15727601
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 16, 2021 · fix by May 12, 2021 overdue · Violation #14200987
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls in the bathroomIssued Oct 19, 2020 · fix by Nov 23, 2020 overdue · Violation #13858282
- COther repairsProvide an adequate supply of gas to the fixtures to the range in the kitchenIssued Aug 24, 2020 · fix by Aug 30, 2020 overdue · rent impairing · Violation #13734962
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.