Housing violations · Harlem (North)
206 West 148 Street, Manhattan
10039 · 100 apartments · 6 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs25
- Peeling paint and plaster13
- Roaches12
- Mice or rats11
- Broken doors or locks9
- Plumbing, sinks and toilets7
- Leaks and water damage4
- Mold3
- Lead paint2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 119 closed · NYC typical: 87 days
from 151 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair or replace the broken or defective counter top at base cabinet at north wall in the kitchenIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19298982
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the 2nd room from northIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19298981
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 15, 2026 · fix by Nov 10, 2026 overdue · Violation #19298977
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298978
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298980
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19298979
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at west wall in the 2nd room from northIssued Sep 25, 2026 · fix by Oct 30, 2026 overdue · Violation #19254088
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19242996
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 24, 2026 · fix by Oct 20, 2026 overdue · Violation #19242997
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19203458
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Sep 10, 2026 · fix by Oct 15, 2026 overdue · Violation #19203455
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Sep 10, 2026 · fix by Sep 16, 2026 overdue · Violation #19203457
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 10, 2026 · fix by Oct 6, 2026 overdue · Violation #19203456
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2026 · fix by Sep 16, 2026 overdue · Violation #19153625
- CLeaks and water damageRepair the roof so that it will not leak at the ceiling in the 2nd room from northIssued Jul 17, 2026 · fix by Jul 23, 2026 overdue · rent impairing · Violation #19076011
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from northIssued Jul 17, 2026 · fix by Jul 23, 2026 overdue · Violation #19076013
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 15, 2026 · fix by Jul 9, 2026 overdue · Violation #19010220
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 15, 2026 · fix by Jul 9, 2026 overdue · Violation #19010221
- CMoldTrace and repair the source and abate the visible mold condition more than 10 sq. ft. at east wall in the kitchenIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18995921
- BOther repairsProperly repair with similar material the broken or defective wood base bottom cabinet west wall in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18958550
- BBroken doors or locksProperly repair or replace the broken or defective entrance door in the 2nd room from northIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958553
- BOther repairsProperly repair with similar material the broken or defective wood countertop at south wall in the kitchenIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958554
- BOther repairsProperly repair or replace the broken or defective latch in the entranceIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958555
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north and east walls in the kitchenIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18955351
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective counter top at sink in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772019
- BOther repairsProperly repair or replace the broken or defective wall cabinet at north in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772020
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from northIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772023
- BOther repairsProperly repair or replace the broken or defective base cabinet at north wall in the kitchenIssued Apr 9, 2026 · fix by May 14, 2026 overdue · Violation #18772021
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 9, 2026 · fix by May 5, 2026 overdue · Violation #18772022
- BOther repairsProperly repair with similar material the broken or defective laminate cabinet top in the kitchenIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18765201
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18765200
- BOther repairsProperly secure the loose water closet in the bathroomIssued Apr 6, 2026 · fix by May 11, 2026 overdue · Violation #18765199
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 6, 2026 · fix by May 2, 2026 overdue · Violation #18765203
- BBroken doors or locksProperly repair or replace the broken or defective door knob at entrance door in the 4th room from northIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18745152
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from northIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18745153
- BOther repairsProperly repair with similar material the broken or defective wooded baseboard at closet at east in the private hallwayIssued Apr 2, 2026 · fix by May 7, 2026 overdue · Violation #18745154
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 30, 2026 · fix by Apr 25, 2026 overdue · Violation #18745156
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 12, 2026 · fix by Apr 7, 2026 overdue · Violation #18699742
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective counter top at lower base cabinet at sink in the kitchenIssued Mar 11, 2026 · fix by Apr 15, 2026 overdue · Violation #18690065
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 10, 2026 · fix by Apr 5, 2026 overdue · Violation #18690062
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 10, 2026 · fix by Apr 5, 2026 overdue · Violation #18690063
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18580981
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 5, 2026 · fix by Jan 31, 2026 overdue · Violation #18546094
- BOther repairsProperly repair with similar material the broken or defective counter top at base cabinet at north in the kitchenIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18546093
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 5, 2026 · fix by Jan 31, 2026 overdue · Violation #18546095
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 9, 2025 · fix by Jan 4, 2026 overdue · Violation #18492631
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, east and west walls in the 4th room from northIssued Dec 9, 2025 · fix by Jan 13, 2026 overdue · Violation #18492634
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 1, 2025 · fix by Dec 27, 2025 overdue · Violation #18443413
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2024 · fix by Dec 8, 2024 overdue · Violation #17414455
- BBroken doors or locksReplace with new the missing upper cabinet door at east wall in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305363
- BOther repairsProperly repair with similar material the broken or defective wood counter top and back splash at base cabinet at east wall in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305364
- BOther repairsReplace with new the missing 1st drawer at base cabinet at east wall in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305365
- BOther repairsReplace with new the missing 1st drawer at base cabinet at south wall in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305368
- BPlumbing, sinks and toiletsReplace with new the missing bottom panel at sink base cabinet in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305367
- BBroken doors or locksReplace with new the missing base cabinet door at east wall in the kitchenIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305366
- BOther repairsReplace the broken or defective water closet in the bathroomIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · rent impairing · Violation #17305362
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective counter top at sink in the kitchenIssued Jun 20, 2023 · fix by Jul 25, 2023 overdue · Violation #16043138
- BOther repairsProperly repair or replace the broken or defective bell and buzzer intercom system at building front entrance to foyerIssued Jun 20, 2023 · fix by Jul 25, 2023 overdue · Violation #16043140
- BPlumbing, sinks and toiletsProperly repair the broken or defective sink's cabinet counter top in the kitchenIssued Sep 19, 2022 · fix by Oct 24, 2022 overdue · Violation #15374664
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 22, 2022 · fix by Sep 17, 2022 overdue · Violation #15323165
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.