Housing violations · Harlem (North)
281 West 150 Street, Manhattan
10039 · 16 apartments · 5 stories · City Council district 9
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs5
- Peeling paint and plaster4
- Mice or rats4
- Leaks and water damage4
- Broken doors or locks2
- Missing smoke or CO detector2
- Roaches1
- Mold1
- Plumbing, sinks and toilets1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 3 closed · NYC typical: 87 days
from 3 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective eroded metal riser 1-2-3-4-5-6-7-8-9-10-11-12-13-14-15 from bottom at public hall stairs, 1st…Issued Apr 23, 2026 · fix by May 28, 2026 overdue · Violation #18808133
- BBroken doors or locksProperly repair with similar material the broken or defective door in the bathroomIssued Dec 18, 2024 · fix by Jan 22, 2025 overdue · Violation #17560773
- BOther repairsProperly repair or replace the broken or defective 2nd window from east at south lower spring balance . in the 3rd room from north at westIssued Dec 18, 2024 · fix by Jan 22, 2025 overdue · Violation #17560774
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 18, 2024 · fix by Jan 13, 2025 overdue · Violation #17560770
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 18, 2024 · fix by Jan 13, 2025 overdue · Violation #17560769
- BBroken doors or locksProperly repair with similar material the broken or defective door in the 3rd room from north at westIssued Dec 18, 2024 · fix by Jan 22, 2025 overdue · Violation #17560768
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Dec 18, 2024 · fix by Jan 22, 2025 overdue · Violation #17560772
- BLeaks and water damageRepair the leaky and/or defective faucets faucet at sink in the kitchenIssued Jun 21, 2024 · fix by Jul 26, 2024 overdue · Violation #17063499
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Jun 6, 2024 · fix by Jul 11, 2024 overdue · Violation #17021367
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 6, 2024 · fix by Jul 2, 2024 overdue · Violation #17021366
- BMoldTrace and repair the source and abate the visible mold condition approximately 3 sqft on ceiling in the 1st bathroom from eastIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16853942
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 19, 2024 · fix by Apr 14, 2024 overdue · Violation #16753264
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). *defective*Issued Dec 12, 2023 · fix by Jan 16, 2024 overdue · Violation #16186068
- BMissing smoke or CO detectorRepair or replace the smoke detector *defective*Issued Dec 12, 2023 · fix by Jan 16, 2024 overdue · Violation #16186069
- BPlumbing, sinks and toiletsRemove all obstructions and repair all defects in the wasteline under washbasin in the 1st bathroom from eastIssued Dec 12, 2023 · fix by Jan 16, 2024 overdue · rent impairing · Violation #16186066
- BOther repairsProperly repair with similar material the broken or defective aluminum saddle in the kitchenIssued Feb 15, 2023 · fix by Mar 22, 2023 overdue · Violation #15721885
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north & south walls in the 1st bathroom from northIssued Feb 15, 2023 · fix by Mar 22, 2023 overdue · Violation #15721886
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling & south wall in the 2nd bathroom from northIssued Feb 15, 2023 · fix by Mar 22, 2023 overdue · Violation #15721887
- BElectrical problemsReplace with new the missing outlet cover at east wall in the 3rd room from north at eastIssued Feb 15, 2023 · fix by Mar 22, 2023 overdue · Violation #15721888
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 24, 2021 · fix by Sep 19, 2021 overdue · Violation #14512021
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.