Housing violations · Hamilton Heights-Sugar Hill
508 West 151 Street, Manhattan
10031 · 14 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs24
- Peeling paint and plaster17
- Roaches4
- Plumbing, sinks and toilets3
- Broken doors or locks2
- Mice or rats1
- No heat or hot water1
- Leaks and water damage1
- Mold1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 38 closed · NYC typical: 87 days
from 59 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- COther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Nov 4, 2026 · fix by Nov 10, 2026 overdue · Violation #19351338
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351336
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bathroom from northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351339
- BOther repairsProperly repair or replace the broken or defective uncapped radiator shut off valve at north wall in the 1st room from northIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19351337
- BOther repairsProperly repair or replace the broken or defective steam riser pipe at floor in the 1st room from northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19325831
- BBroken doors or locksReplace with new the missing bathroom door in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325827
- BOther repairsProperly repair with similar material the broken or defective floor in the private hallwayIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325829
- BPlumbing, sinks and toiletsRepair the flushing apparatus and maintain same so as to flush effectively the water closet toilet in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · rent impairing · Violation #19325830
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19325828
- COther repairsRemove all obstructions from water closet in the 2nd bathroom from northIssued Jul 9, 2026 · fix by Jul 15, 2026 overdue · rent impairing · Violation #19054291
- COther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jul 9, 2026 · fix by Jul 15, 2026 overdue · Violation #19054287
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19054296
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 9, 2026 · fix by Aug 4, 2026 overdue · rent impairing · Violation #19054297
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 6th room from northIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19054289
- BOther repairsProperly repair with similar material the broken or defective base cabinet at north in the 2nd bathroom from northIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19054295
- BOther repairsProperly repair with similar material the broken or defective grout at tiles at west wall in the 2nd bathroom from northIssued Jul 7, 2026 · fix by Aug 11, 2026 overdue · Violation #19054290
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18980025
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st bathroom from north at westIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18980026
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st bathroom from north at eastIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18980027
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 5th room from northIssued Mar 23, 2026 · fix by Apr 27, 2026 overdue · Violation #18738380
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 23, 2026 · fix by Apr 18, 2026 overdue · Violation #18738376
- CNo heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeds maximum allowable temperature of 130 degrees in the entire apartmentIssued Feb 11, 2026 · fix by Feb 17, 2026 overdue · Violation #18634124
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entranceIssued Feb 11, 2026 · fix by Feb 25, 2026 overdue · Violation #18634125
- BOther repairsProperly repair with similar material the broken or defective hard wood floor in the private hallwayIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440732
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from northIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18440730
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 5th storyIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18439934
- BOther repairsProperly repair with similar material the broken or defective fire retardant materials at bulkhead east wall at public hall, 5th storyIssued Nov 25, 2025 · fix by Dec 30, 2025 overdue · Violation #18439936
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 4th room from north at eastIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18278770
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18278764
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective wood sink base cabinet countertop in the kitchenIssued Oct 9, 2025 · fix by Nov 13, 2025 overdue · Violation #18278762
- COther repairsProperly repair with similar material the broken or defective hardwood floor in the 4th room from north at eastIssued Oct 9, 2025 · fix by Oct 15, 2025 overdue · Violation #18278772
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the private hallwayIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278775
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the foyerIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278776
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the bathroomIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278769
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the north wall, east wall, and west wall in the bathroomIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278768
- BOther repairsProperly repair or replace the broken or defective light fixture at west wall in the bathroomIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278767
- COther repairsProperly repair or replace the broken or defective spring balance at lower window sash in the bathroomIssued Oct 8, 2025 · fix by Oct 14, 2025 overdue · Violation #18278765
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2025 · fix by Nov 3, 2025 overdue · Violation #18278763
- COther repairsProperly repair with similar material the broken or defective hardwood floor in the entire apartmentIssued Oct 8, 2025 · fix by Oct 14, 2025 overdue · Violation #18278760
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the 4th room from north at westIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278781
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278779
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at the ceiling, west wall, and north wall in the bathroomIssued Oct 8, 2025 · fix by Nov 12, 2025 overdue · Violation #18278766
- BOther repairsReplace with new the broken or defective rotted wood base cabinet and countertop in the kitchenIssued Mar 24, 2023 · fix by Apr 28, 2023 overdue · Violation #15819070
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 23, 2022 · fix by Jan 18, 2023 overdue · Violation #15625619
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.