Housing violations · Hamilton Heights-Sugar Hill
445 West 153 Street, Manhattan
10031 · 53 apartments · 6 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
8 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster36
- Other repairs12
- Roaches11
- Mold8
- Leaks and water damage8
- Mice or rats6
- Broken doors or locks5
- Missing smoke or CO detector3
- No heat or hot water3
- Lead paint2
- Plumbing, sinks and toilets1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 12 closed · NYC typical: 87 days
from 22 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition approx 3 sq ft of mold at north wall in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301544
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 15, 2026 · fix by Jul 11, 2026 overdue · Violation #19006531
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18646208
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18646209
- BLeaks and water damageRepair the roof so that it will not leak above the ceiling in the 1st room from northIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · rent impairing · Violation #18646205
- BOther repairsProperly repair with similar material the broken or defective eroded and detaching window head ( at 1st window from east ) south wall in the 5th room from…Issued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18646207
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18559732
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18559734
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at south wall in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18559733
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 28, 2025 · fix by Oct 2, 2025 overdue · Violation #18189567
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 28, 2025 · fix by Sep 23, 2025 overdue · Violation #18189564
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the kitchenIssued Aug 28, 2025 · fix by Oct 2, 2025 overdue · Violation #18189565
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchenIssued Aug 28, 2025 · fix by Oct 2, 2025 overdue · Violation #18189566
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 18, 2025 · fix by Aug 18, 2025 overdue · rent impairing · Violation #18167073
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 18, 2025 · fix by Sep 13, 2025 overdue · Violation #18167075
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18158658
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from northIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18158657
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling, north and south wall in the bathroomIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18158663
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the private hallwayIssued Aug 14, 2025 · fix by Sep 18, 2025 overdue · Violation #18158662
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18158661
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 14, 2025 · fix by Sep 9, 2025 overdue · Violation #18158660
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 15, 2025 · fix by Jun 10, 2025 overdue · Violation #17896209
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north and west walls in the 5th room from eastIssued Feb 27, 2025 · fix by Apr 3, 2025 overdue · Violation #17730202
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 14, 2025 · fix by Jan 13, 2025 overdue · rent impairing · Violation #17616335
- CBroken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Jan 14, 2025 · fix by Jan 20, 2025 overdue · Violation #17616336
- BMoldTrace and repair the source and abate the visible mold condition at ceiling less than 10sq.ft in the bathroomIssued Dec 16, 2024 · fix by Jan 20, 2025 overdue · Violation #17562114
- CMice or ratsAbate the infestation consisting of rodents rats in the entire apartmentIssued Nov 4, 2024 · fix by Nov 30, 2024 overdue · rent impairing · Violation #17389977
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 4, 2024 · fix by Nov 30, 2024 overdue · Violation #17389976
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 30, 2024 · fix by Nov 25, 2024 overdue · Violation #17380142
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 30, 2024 · fix by Nov 25, 2024 overdue · Violation #17380143
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceilng in the bathroomIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17228827
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceilng in the bathroomIssued Aug 29, 2024 · fix by Oct 3, 2024 overdue · Violation #17228826
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 16, 2024 · fix by Sep 11, 2024 overdue · Violation #17198729
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Aug 16, 2024 · fix by Sep 20, 2024 overdue · Violation #17198726
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Aug 16, 2024 · fix by Sep 20, 2024 overdue · Violation #17198727
- BPlumbing, sinks and toiletsRepair the broken or defective connection at drain pipe at washbasin in the bathroomIssued Aug 16, 2024 · fix by Sep 20, 2024 overdue · Violation #17198724
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 16, 2024 · fix by Sep 11, 2024 overdue · Violation #17198728
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to fire escape. in the 7th room from northIssued Jun 4, 2024 · fix by Jun 10, 2024 overdue · Violation #17018402
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 5th room from north at eastIssued May 29, 2024 · fix by Jul 3, 2024 overdue · Violation #17003327
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued May 29, 2024 · fix by Jun 24, 2024 overdue · Violation #17003322
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Jan 17, 2024 · fix by Feb 21, 2024 overdue · Violation #16594243
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from northIssued Jan 17, 2024 · fix by Feb 21, 2024 overdue · Violation #16594246
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and east walls in the 1st room from northIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · Violation #16438842
- BLeaks and water damageRepair the roof so that it will not leak above ceiling in the 1st room from northIssued Nov 27, 2023 · fix by Jan 1, 2024 overdue · rent impairing · Violation #16438840
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 27, 2023 · fix by Nov 26, 2023 overdue · rent impairing · Violation #16438843
- BMoldTrace and repair the source and abate the visible mold condition approx 4sqft at the ceiling in the 2nd bathroom from eastIssued Aug 1, 2023 · fix by Sep 5, 2023 overdue · Violation #16138267
- BMoldTrace and repair the source and abate the visible mold condition approximately 4 sq ft at north wall in the bathroomIssued Jun 7, 2023 · fix by Jul 12, 2023 overdue · Violation #16029679
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 21, 2021 · fix by Jan 16, 2022 overdue · Violation #14740201
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 17, 2021 · fix by Dec 13, 2021 overdue · Violation #14674010
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674016
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 3rd room from northIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674015
- BMoldTrace and repair the source and abate the visible mold condition at ceiling ( approx 10 sqft) in the 3rd room from northIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674014
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyerIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674013
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674011
- BOther repairsProperly repair the broken or defective spring balance at upper window sash at south wall in the 6th room from northIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674020
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 6th room from northIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674019
- BOther repairsReplace with new the missing eschutchen plate heat riser at ceiling in the bathroomIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674017
- BOther repairsReplace with new the missing eschutchen plate heat riser at ceiling in the bathroomIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674007
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallwayIssued Nov 17, 2021 · fix by Dec 22, 2021 overdue · Violation #14674018
- BMoldTrace and repair the source and abate the visible mold condition at north wall approx. 1 sqft. in the 1st room from northIssued Apr 9, 2021 · fix by May 14, 2021 overdue · Violation #14189456
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.