Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Sunnyside

47-07 39 Street, Queens

11104 · 56 apartments · 5 stories · City Council district 26

By · Updated · Data from NYC HPD

C
38open immediately hazardous violations · 68 per 100 apartments
B63Hazardous, open
A26Non-hazardous, open
!115Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

13 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company47-07 39TH STREET, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    39
  2. Peeling paint and plaster
    25
  3. Broken doors or locks
    23
  4. Plumbing, sinks and toilets
    14
  5. Mice or rats
    7
  6. Mold
    7
  7. Roaches
    5
  8. Leaks and water damage
    4
  9. Electrical problems
    2
  10. Lead paint
    1
  11. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C104 days
from 73 closed · NYC typical: 87 days
B148 days
from 151 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in clogged drain at bathtub in the bathroomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19337527
  • C
    Other repairsProperly repair with similar material the broken or defective 2nd marble tread from bottom to up at public hall stairs, 1st story, section ''a''Issued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337526
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket at freezer and refrigerator doors in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337522
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color hole behind the range at north wall in the kitchenIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337517
  • B
    Other repairsProperly repair with similar material the broken or defective loose and missing grout at ceramic tile's joint in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337513
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and walls in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337512
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337511
  • C
    Other repairsProperly repair or replace the broken or defective sub floor in the private hallwayIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337510
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the 1st room from northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337507
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroomIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337504
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective wash basin cabinet in the bathroomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337500
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from eastIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337484
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19337471
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337470
  • C
    Other repairsProperly repair or replace the broken or defective dip and sloping sub floor in the bathroomIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · Violation #19337469
  • C
    Lead paintRemove the illegal fastening key operated lock on door leading to room with fire escape. in the 2nd room from northIssued Oct 29, 2026 · fix by Nov 4, 2026 overdue · rent impairing · Violation #19337462
  • B
    Broken doors or locksReplace with new the missing closet door in the 2nd room from northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337461
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from northIssued Oct 29, 2026 · fix by Dec 3, 2026 · Violation #19337460
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 29, 2026 · fix by Nov 24, 2026 · Violation #19337459
  • C
    Leaks and water damageProperly repair or replace the broken or defective boiler leaking water at boiler roomIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · Violation #19323424
  • C
    Other repairsProperly repair with similar material the broken or defective 2nd marble tread from bottom at public hall stairs, 1st story, section ''a''Issued Oct 23, 2026 · fix by Oct 29, 2026 overdue · Violation #19323902
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and ceiling in the kitchenIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · Violation #19323874
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the kitchenIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · Violation #19323876
  • C
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink in the kitchenIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · rent impairing · Violation #19323871
  • C
    Plumbing, sinks and toiletsProvide adequate supply of cold water for the fixtures at sink in the kitchenIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · rent impairing · Violation #19323872
  • B
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling in the private hallwayIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19323891
  • C
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the private hallwayIssued Oct 23, 2026 · fix by Oct 29, 2026 overdue · Violation #19323894
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 27, 2026 · fix by Aug 22, 2026 overdue · Violation #19093816
  • B
    Other repairsProperly repair with similar material the broken or defective floor ceramic tiles in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19093815
  • C
    MoldTrace and repair the source and abate the visible mold condition greater the 10 sq ft at ceiling, south and east wall in the bathroomIssued Jul 16, 2026 · fix by Aug 11, 2026 overdue · Violation #19081893
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2026 · fix by Aug 9, 2026 overdue · Violation #19073730
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor around radiator in the 2nd room from east at northIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #19003206
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor around radiator in the 1st room from east at southIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #19003203
  • B
    MoldTrace and repair the source and abate the visible mold condition less then 10sq feet at the ceiling in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18940452
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Apr 27, 2026 · fix by Jun 1, 2026 overdue · Violation #18820939
  • B
    Other repairsProperly repair with similar material the broken or defective marble saddle in the entranceIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18791873
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base at sink in the kitchenIssued Apr 14, 2026 · fix by May 19, 2026 overdue · Violation #18791875
  • B
    Broken doors or locksProvide securirty in an event of a power outtage by means of a heavy duty lock and latch at building entrance door. at section b , 1st storyIssued Feb 13, 2026 · fix by Mar 20, 2026 overdue · Violation #18644344
  • C
    Broken doors or locksRemove the illegal fastening consisting on an unacceptable electromagnetic lock at building entrance door. at section b , 1st storyIssued Feb 13, 2026 · fix by Feb 19, 2026 overdue · rent impairing · Violation #18644317
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq.feet at ceiling and west wall in the bathroomIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18643294
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 11, 2026 · fix by Mar 9, 2026 overdue · Violation #18633466
  • B
    Broken doors or locksProvide security in an event of a power outtage by means of a heavy duty lock and latch set at building entrance door. section a , 1st storyIssued Feb 11, 2026 · fix by Mar 18, 2026 overdue · Violation #18633463
  • C
    Broken doors or locksProvide security in the event of power outage by means of a heavy-duty lock and latch set at door at building entrance , 1st story, section ''b''Issued Feb 9, 2026 · fix by Feb 15, 2026 overdue · Violation #18604620
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Feb 9, 2026 · fix by Mar 7, 2026 overdue · rent impairing · Violation #18604611
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at west wall in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18611954
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line under sink in the kitchenIssued Jan 16, 2026 · fix by Feb 20, 2026 overdue · Violation #18571319
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Jan 16, 2026 · fix by Feb 20, 2026 overdue · Violation #18577914
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub-floor (sloping) in the private hallwayIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18563930
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line under wash basin in the bathroomIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · rent impairing · Violation #18563926
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jan 15, 2026 · fix by Feb 10, 2026 overdue · rent impairing · Violation #18563858
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building front entrance door , 1st story, section ''c''Issued Jan 15, 2026 · fix by Jan 21, 2026 overdue · rent impairing · Violation #18563869
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at westIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570625
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north at eastIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570624
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub-floor (sloping) in the 1st room from north at westIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570947
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the private hallwayIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570917
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570921
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from north at westIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570946
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the north wall by range in the kitchenIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18570912
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at west wall in the bathroomIssued Jan 9, 2026 · fix by Feb 13, 2026 overdue · Violation #18564324
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18290906

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

452017
202018
242019
82021
402022
52023
742024
842025
2352026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 686 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.