Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (South)

528 West 159 Street, Manhattan

10032 · 11 apartments · 5 stories · City Council district 10

By · Updated · Data from NYC HPD

C
11open immediately hazardous violations · 100 per 100 apartments
B8Hazardous, open
A3Non-hazardous, open
!21Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company528 W 159th St Owner LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    5
  2. Peeling paint and plaster
    3
  3. Lead paint
    3
  4. Mold
    3
  5. Roaches
    2
  6. Mice or rats
    2
  7. Plumbing, sinks and toilets
    2
  8. Broken doors or locks
    1
  9. Leaks and water damage
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C100 days
from 24 closed · NYC typical: 87 days
B120 days
from 59 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19160334
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19160335
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19152110
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at wash basin in the bathroomIssued Aug 19, 2026 · fix by Aug 25, 2026 overdue · rent impairing · Violation #19151349
  • B
    Other repairsProperly repair or replace the broken or defective light fixture at ceiling in the 2nd room from northIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #19010853
  • C
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jun 15, 2026 · fix by Jun 21, 2026 overdue · Violation #19010832
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #18990765
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #18990766
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945393
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945392
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945391
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 3 sq ft at the ceiling in north closet in the 2nd room from northIssued Mar 5, 2024 · fix by Apr 9, 2024 overdue · Violation #16724945
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall approx 15 sq ft in the kitchenIssued Feb 20, 2024 · fix by Mar 26, 2024 overdue · Violation #16672904
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Feb 15, 2024 · fix by Feb 29, 2024 overdue · Violation #16672906
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak radaitor in the 1st room from northIssued Feb 15, 2024 · fix by Feb 21, 2024 overdue · Violation #16672905
  • B
    MoldTrace and repair the source and abate the visible mold condition approx- 10 sq,ft at west wall inside wood base cabinet in the kitchenIssued Jan 22, 2024 · fix by Feb 26, 2024 overdue · Violation #16608958
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jan 22, 2024 · fix by Feb 26, 2024 overdue · Violation #16608959
  • B
    Plumbing, sinks and toiletsProperly secure the loose washbasin in the bathroomIssued Nov 7, 2016 · fix by Dec 12, 2016 overdue · Violation #11490592
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchenIssued Nov 7, 2016 · fix by Dec 12, 2016 overdue · Violation #11490586

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
222018
42019
12020
192021
142022
462023
502024
222026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 222 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.