Housing violations · Washington Heights (South)
532 West 159 Street, Manhattan
10032 · 20 apartments · 5 stories · City Council district 7
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs28
- Peeling paint and plaster26
- Leaks and water damage12
- Broken doors or locks12
- Mold8
- Mice or rats7
- No heat or hot water6
- Plumbing, sinks and toilets5
- Electrical problems5
- Roaches4
- Missing smoke or CO detector3
- Lead paint1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 21 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CLeaks and water damageRepair the broken or defective connection waste line leaking under sink in the kitchenIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19349866
- BOther repairsProperly repair or replace the broken or defective intercom in the entire apartmentIssued Nov 2, 2026 · fix by Dec 7, 2026 · Violation #19349830
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19349844
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19349846
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19349856
- BOther repairsProperly repair or replace the broken or defective base cabinet at east wall in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19177086
- BPlumbing, sinks and toiletsRepair the broken or defective connection drain pipe at sink in the kitchenIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19177087
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19177090
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2026 · fix by Sep 26, 2026 overdue · Violation #19177085
- BPlumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19177088
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19177089
- BLeaks and water damageRepair the leaky and/or defective faucets at the bathtub in the bathroomIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18982614
- COther repairsProperly repair or replace the broken or defective roof covering throughout the entire roofIssued Jun 4, 2026 · fix by Jun 10, 2026 overdue · Violation #18982622
- COther repairsProperly repair or replace the broken or defective 1st tread from bottom up at the intermediate landing at public hall stairs, 4th storyIssued Jun 4, 2026 · fix by Jun 10, 2026 overdue · Violation #18982628
- BOther repairsProperly repair or replace the broken or defective intercom system in the entranceIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18982603
- BLeaks and water damageRepair the roof so that it will not leak at the ceiling in the private hallwayIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · rent impairing · Violation #18982605
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallwayIssued Jun 4, 2026 · fix by Jul 9, 2026 overdue · Violation #18982606
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Mar 16, 2026 · fix by Mar 14, 2026 overdue · Violation #18716507
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 16, 2026 · fix by Mar 14, 2026 overdue · rent impairing · Violation #18716509
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler room at basementIssued Mar 11, 2026 · fix by Mar 17, 2026 overdue · Violation #18702005
- CElectrical problemsProvide a safe and adequate supply of electric service to the fixtures at ceiling at public hall, 2nd storyIssued Mar 11, 2026 · fix by Mar 17, 2026 overdue · Violation #18702018
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 11, 2026 · fix by Mar 10, 2026 overdue · rent impairing · Violation #18702003
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Mar 9, 2026 · fix by Mar 7, 2026 overdue · rent impairing · Violation #18695326
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Mar 9, 2026 · fix by Mar 15, 2026 overdue · Violation #18695332
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 9, 2026 · fix by Mar 7, 2026 overdue · rent impairing · Violation #18695329
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at the building entrance door , 1st storyIssued Jan 21, 2026 · fix by Jan 27, 2026 overdue · Violation #18585298
- BPeeling paint and plasterProperly repair with similar material the broken or defective plaster with fire rated material at the ceiling and east and west walls. at public hall, 1st storyIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585300
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st storyIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585299
- BOther repairsProperly repair or replace the broken or defective mailboxes at public hall, 1st storyIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18585302
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Jan 20, 2026 · fix by Jan 20, 2026 overdue · rent impairing · Violation #18585294
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Jan 20, 2026 · fix by Jan 26, 2026 overdue · Violation #18585295
- CNo heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Dec 16, 2025 · fix by Dec 16, 2025 overdue · rent impairing · Violation #18514351
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Dec 16, 2025 · fix by Dec 22, 2025 overdue · Violation #18514352
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 24, 2025 · fix by Nov 19, 2025 overdue · Violation #18329128
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 24, 2025 · fix by Nov 19, 2025 overdue · Violation #18329127
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the bathroomIssued Jun 3, 2024 · fix by Jul 8, 2024 overdue · Violation #17017373
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jun 3, 2024 · fix by Jun 17, 2024 overdue · Violation #17017374
- BBroken doors or locks& 309 m/d law abate the nuisance consisting of bed blocking fire escape window in the 1st room from eastIssued Apr 10, 2024 · fix by May 15, 2024 overdue · Violation #16840618
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the entranceIssued Jan 5, 2024 · fix by Feb 9, 2024 overdue · Violation #16567802
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 13, 2023 · fix by Dec 18, 2023 overdue · Violation #16377017
- BOther repairsProvide escutcheon plate heat riser at ceiling in the bathroomIssued Aug 22, 2023 · fix by Sep 26, 2023 overdue · Violation #16178420
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 22, 2023 · fix by Sep 17, 2023 overdue · Violation #16178432
- CMoldTrace and repair the source and abate the visible mold condition approx 30 sq feet at ceiling and all walls in the bathroomIssued Aug 22, 2023 · fix by Sep 17, 2023 overdue · Violation #16178394
- CMoldTrace and repair the source and abate the visible mold condition at south wall 20sq feet inside closet in the 1st room from north at westIssued Jul 24, 2023 · fix by Aug 19, 2023 overdue · Violation #16121332
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15985487
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall closet all interior walls in the 1st room from northIssued May 16, 2023 · fix by May 22, 2023 overdue · Violation #15985484
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued May 16, 2023 · fix by Jun 20, 2023 overdue · Violation #15985480
- COther repairsProperly repair or replace the broken or defective counter balance at lower window sash in the kitchenIssued May 16, 2023 · fix by May 22, 2023 overdue · Violation #15985473
- BElectrical problemsProperly repair the broken or defective electrical outlet at east wall in the bathroomIssued Oct 11, 2022 · fix by Nov 15, 2022 overdue · Violation #15418013
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Oct 11, 2022 · fix by Nov 15, 2022 overdue · Violation #15418041
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroomIssued Oct 11, 2022 · fix by Nov 15, 2022 overdue · Violation #15418039
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 11, 2022 · fix by Nov 15, 2022 overdue · Violation #15418040
- BOther repairsProperly repair the broken or defective bell-buzzer system at west wall in the private hallwayIssued Oct 11, 2022 · fix by Nov 15, 2022 overdue · Violation #15418014
- BOther repairsProperly repair with similar material the broken or defective wood cabinets at east wall in the kitchenIssued Jul 20, 2022 · fix by Aug 24, 2022 overdue · Violation #15275849
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jul 20, 2022 · fix by Aug 24, 2022 overdue · Violation #15275847
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 20, 2022 · fix by Aug 15, 2022 overdue · Violation #15275848
- BLeaks and water damageRepair the leaky and/or defective faucets wash basin in the bathroomIssued Jul 20, 2022 · fix by Aug 24, 2022 overdue · Violation #15275850
- CMice or ratsAbate the infestation consisting of miceIssued Jul 20, 2022 · fix by Aug 15, 2022 overdue · Violation #15275846
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th room from northIssued Mar 24, 2022 · fix by Apr 28, 2022 overdue · Violation #15070876
- BMoldTrace and repair the source and abate the visible mold condition at ceiling and all walls approx. 10 sq.ft in the bathroomIssued Mar 24, 2022 · fix by Apr 28, 2022 overdue · Violation #15070886
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.