Housing violations · Washington Heights (South)
438 West 164 Street, Manhattan
10032 · 22 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
57 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster195
- Other repairs184
- Leaks and water damage83
- Broken doors or locks69
- Missing smoke or CO detector41
- Electrical problems39
- Lead paint26
- Plumbing, sinks and toilets26
- Mice or rats25
- Mold23
- No heat or hot water14
- Roaches11
- Missing window guards4
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 59 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BBroken doors or locksProperly repair or replace the broken or defective intercom system at building door entrance at public hall, 1st storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19301312
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265622
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265624
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265625
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 2, 2026 · fix by Oct 28, 2026 overdue · Violation #19265621
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 2, 2026 · fix by Oct 26, 2026 overdue · Violation #19273796
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 2, 2026 · fix by Oct 26, 2026 overdue · Violation #19273797
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 2, 2026 · fix by Oct 26, 2026 overdue · Violation #19273794
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265616
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 2, 2026 · fix by Nov 6, 2026 overdue · Violation #19265623
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 14, 2026 · fix by Sep 11, 2026 overdue · rent impairing · Violation #19213947
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19213948
- CBroken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Sep 14, 2026 · fix by Sep 20, 2026 overdue · Violation #19213951
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the north and west wall in the 1st room from north at eastIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18507172
- BPlumbing, sinks and toiletsRepair the broken or defective plastered surfaces and paint in a uniform color at north wall under sink in the kitchenIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18328995
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 27, 2025 · fix by Nov 22, 2025 overdue · Violation #18328994
- BOther repairsProperly secure the loose handrail at public hall stairs, 1st storyIssued Oct 20, 2025 · fix by Nov 24, 2025 overdue · Violation #18315018
- CBroken doors or locksProperly repair or replace the broken or defective glass at building entrance door at public hall, 1st storyIssued Apr 28, 2025 · fix by May 4, 2025 overdue · Violation #17858605
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at boiler at boiler roomIssued Apr 28, 2025 · fix by May 4, 2025 overdue · Violation #17858601
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Feb 13, 2025 · fix by Feb 13, 2025 overdue · rent impairing · Violation #17698917
- CElectrical problemsProvide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for…Issued Feb 13, 2025 · fix by Feb 13, 2025 overdue · Violation #17698916
- COther repairsProperly repair or replace the broken or defective boiler at boiler roomIssued Feb 13, 2025 · fix by Feb 19, 2025 overdue · Violation #17698922
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at westIssued Jan 14, 2025 · fix by Feb 18, 2025 overdue · Violation #17619147
- BBroken doors or locksProperly repair with similar material the broken or defective glass at entrance door cracked posing cut hazard at front areaway, 1st storyIssued Jan 14, 2025 · fix by Feb 18, 2025 overdue · Violation #17619156
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at westIssued Jan 14, 2025 · fix by Feb 18, 2025 overdue · Violation #17619145
- COther repairsProperly repair with similar material the broken or defective ceramic wall tiles at all walls in the bathroomIssued Dec 13, 2024 · fix by Dec 19, 2024 overdue · Violation #17554986
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Dec 13, 2024 · fix by Dec 19, 2024 overdue · Violation #17554988
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at the north and south walls. in the bathroomIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17520525
- BMoldTrace and repair the source and abate the visible mold condition at the south wall in the 4th room from north at westIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17520508
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 29, 2024 · fix by Dec 25, 2024 overdue · Violation #17486355
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 29, 2024 · fix by Dec 25, 2024 overdue · Violation #17486357
- CBroken doors or locksProvide ready access to buildings heating system door locked at public hallIssued Nov 29, 2024 · fix by Dec 5, 2024 overdue · Violation #17486330
- BMoldTrace and repair the source and abate the visible mold condition approx 12 sq feet at ceiling, east and south wall in the 4th room from north at westIssued Oct 31, 2024 · fix by Dec 5, 2024 overdue · Violation #17386060
- BOther repairsReplace with new the missing escutcheon at the top of the heat riser in the bathroomIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · Violation #17217813
- BOther repairsProperly repair with similar material the broken or defective wood floor at the entrance to the bathroom in the foyerIssued Aug 22, 2024 · fix by Sep 26, 2024 overdue · Violation #17217826
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Aug 22, 2024 · fix by Aug 21, 2024 overdue · rent impairing · Violation #17217795
- CBroken doors or locksProvide ready access to buildings heating system locked door at basementIssued Aug 22, 2024 · fix by Aug 28, 2024 overdue · Violation #17217832
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 20, 2024 · fix by Sep 15, 2024 overdue · Violation #17207258
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from northIssued Aug 20, 2024 · fix by Aug 26, 2024 overdue · Violation #17207255
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Aug 20, 2024 · fix by Sep 24, 2024 overdue · Violation #17207257
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak in the north wall in the 1st room from north at westIssued Aug 20, 2024 · fix by Sep 24, 2024 overdue · Violation #17207256
- COther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Aug 19, 2024 · fix by Aug 25, 2024 overdue · Violation #17203932
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 4th room from north at westIssued Aug 19, 2024 · fix by Aug 25, 2024 overdue · Violation #17203923
- BMoldTrace and repair the source and abate the visible mold condition approx 15 sq feet at east and south wall in the 4th room from north at westIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17203922
- BBroken doors or locksProperly secure the loose wood saddle at door in the bathroomIssued Aug 19, 2024 · fix by Sep 23, 2024 overdue · Violation #17203935
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at north and south wall in the bathroomIssued Aug 19, 2024 · fix by Aug 25, 2024 overdue · Violation #17203929
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from northIssued Jun 26, 2024 · fix by Jul 2, 2024 overdue · Violation #17056519
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq feet at ceiling in the 5th room from northIssued Jun 26, 2024 · fix by Jul 31, 2024 overdue · Violation #17056506
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the 5th room from northIssued Jun 26, 2024 · fix by Jul 31, 2024 overdue · rent impairing · Violation #17056508
- CMoldTrace and repair the source and abate the visible mold condition at ceiling in the 4th room from north at westIssued Jun 21, 2024 · fix by Jul 17, 2024 overdue · Violation #17070770
- CBroken doors or locksRemove the illegal double cylinder key operated locking device at door in the entranceIssued Jun 7, 2024 · fix by Jun 13, 2024 overdue · Violation #17033318
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 1, 2024 · fix by May 27, 2024 overdue · Violation #16945582
- CBroken doors or locksProvide ready access to buildings heating system door locked at basementIssued Apr 30, 2024 · fix by May 6, 2024 overdue · Violation #16944996
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at eastIssued Mar 8, 2024 · fix by Mar 14, 2024 overdue · Violation #16732361
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at all walls in the bathroomIssued Mar 8, 2024 · fix by Mar 14, 2024 overdue · Violation #16732373
- BMoldTrace and repair the source and abate the visible mold condition at ceiling in the 5th room from eastIssued Jan 4, 2024 · fix by Feb 8, 2024 overdue · Violation #16573315
- CLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 6, 2023 · fix by Sep 12, 2023 overdue · Violation #16209497
- BOther repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the 5th room from eastIssued Sep 6, 2023 · fix by Oct 11, 2023 overdue · Violation #16209495
- CLeaks and water damageRepair the roof so that it will not leak at ceiling in the 5th room from eastIssued Sep 6, 2023 · fix by Sep 12, 2023 overdue · rent impairing · Violation #16209490
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from northIssued Aug 31, 2023 · fix by Oct 5, 2023 overdue · Violation #16201828
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.