Housing violations · Washington Heights (South)
555 West 170 Street, Manhattan
10032 · 44 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs10
- Roaches9
- Lead paint9
- Mold4
- Peeling paint and plaster3
- Broken doors or locks3
- Missing smoke or CO detector2
- Mice or rats2
- Leaks and water damage1
- Plumbing, sinks and toilets1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 110 closed · NYC typical: 87 days
from 124 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BBroken doors or locksProperly secure the loose door frame casing in the 1st room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212302
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19212301
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19010340
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19010339
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19010336
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 16, 2026 · fix by Jul 21, 2026 overdue · Violation #19010337
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 12, 2026 · fix by Jun 16, 2026 overdue · Violation #19004501
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 12, 2026 · fix by Jun 16, 2026 overdue · Violation #19004500
- BBroken doors or locksRefit closet door at south in the 1st room from eastIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18825350
- CMoldTrace and repair the source and abate the visible mold condition greater than 10 sq feet at ceiling, east wall and west wall in the bathroomIssued Oct 6, 2025 · fix by Nov 1, 2025 overdue · Violation #18283637
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2025 · fix by Sep 20, 2025 overdue · Violation #18178311
- BOther repairsProperly repair the broken or defective paving at rear yardIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134648
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at north wall in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134914
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and east wall in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134915
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 4, 2025 · fix by Aug 30, 2025 overdue · Violation #18134889
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the 4th room from north at eastIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134909
- BOther repairsProperly repair or replace the broken or defective pull cord at light fixture at ceiling in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134918
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134916
- BOther repairsFire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the 4th room from north at westIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134903
- BOther repairsProperly repair or replace the broken or defective window frame at east wall in the 4th room from north at eastIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134911
- COther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 4, 2025 · fix by Aug 10, 2025 overdue · Violation #18134912
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134900
- BBroken doors or locksProperly repair or replace the broken or defective door in the entrance in the 1st room from northIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134904
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134899
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134891
- BOther repairsProperly repair with similar material the broken or defective marble saddle in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134913
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 4, 2025 · fix by Aug 30, 2025 overdue · Violation #18134890
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from northIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134905
- BOther repairsProperly secure the loose light fixture at ceiling in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134917
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 4th room from north at eastIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134906
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 4th room from north at eastIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18134907
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 21, 2025 · fix by Aug 16, 2025 overdue · Violation #18108071
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jul 16, 2025 · fix by Aug 9, 2025 overdue · Violation #18098832
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 12, 2025 · fix by Jun 7, 2025 overdue · Violation #17880371
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq ft west wall in the bathroomIssued Feb 14, 2025 · fix by Mar 21, 2025 overdue · Violation #17700486
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling in the kitchenIssued Jan 14, 2025 · fix by Feb 18, 2025 overdue · Violation #17625920
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Oct 18, 2024 · fix by Nov 11, 2024 overdue · Violation #17361068
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 21, 2024 · fix by Sep 16, 2024 overdue · Violation #17211833
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2024 · fix by Sep 16, 2024 overdue · Violation #17211832
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 21, 2024 · fix by Sep 16, 2024 overdue · Violation #17211550
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 22, 2024 · fix by Aug 15, 2024 overdue · Violation #17134694
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 22, 2024 · fix by Aug 17, 2024 overdue · Violation #17127739
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 15, 2024 · fix by Jun 10, 2024 overdue · Violation #16976763
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.