Housing violations · Washington Heights (South)
609 West 173 Street, Manhattan
10032 · 36 apartments · 5 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster14
- Other repairs12
- Lead paint9
- Mold5
- Broken doors or locks4
- Roaches2
- Electrical problems1
- Leaks and water damage1
- Plumbing, sinks and toilets1
- Missing smoke or CO detector1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 11 closed · NYC typical: 87 days
from 5 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BMoldTrace and repair the source and abate the visible mold condition greater than 1o square feet at the south wall, the window frame and the ceiling in the…Issued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19210197
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Sep 17, 2026 · fix by Oct 11, 2026 overdue · Violation #19227449
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall and west wall in the bathroomIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19210205
- BOther repairsRefit lower sash at fire escape window in the 1st room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146776
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at westIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146775
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19095322
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19095324
- BLead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19095325
- CLead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jul 17, 2026 · fix by Jul 21, 2026 overdue · Violation #19087744
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jul 17, 2026 · fix by Jul 21, 2026 overdue · Violation #19087745
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east and west walls in the bathroomIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18743923
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq. ft. at the east wall in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18473873
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18178790
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east and west walls in the bathroomIssued Aug 21, 2025 · fix by Sep 25, 2025 overdue · Violation #18168252
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Jul 30, 2025 · fix by Aug 23, 2025 overdue · Violation #18127479
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 30, 2025 · fix by Aug 23, 2025 overdue · Violation #18127478
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jul 30, 2025 · fix by Aug 23, 2025 overdue · Violation #18127476
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at west wall in the bathroomIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17693731
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Feb 18, 2025 · fix by Mar 25, 2025 overdue · Violation #17693734
- BMoldTrace and repair the source and abate the visible mold condition (approximately 9 sq ft) at the east and the south wall in the bathroomIssued Oct 22, 2024 · fix by Nov 26, 2024 overdue · Violation #17369591
- BMoldTrace and repair the source and abate the visible mold condition at east wall approximately 5 sq. ft; and south wall approximately 4 sq. ft. in the bathroomIssued Sep 25, 2024 · fix by Oct 30, 2024 overdue · Violation #17307400
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). addtional one needed within 15 feet of sleeping unit in the entire apartmentIssued Sep 19, 2024 · fix by Oct 24, 2024 overdue · Violation #17286655
- BBroken doors or locksProperly repair or replace the broken or defective base cabinet doors at sink in the kitchenIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17160975
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroomIssued Aug 5, 2024 · fix by Sep 9, 2024 overdue · Violation #17160976
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 5, 2024 · fix by Aug 31, 2024 overdue · Violation #17160974
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2024 · fix by Aug 31, 2024 overdue · Violation #17160973
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and the ceiling in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17059769
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 24, 2024 · fix by Jul 20, 2024 overdue · Violation #17059773
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east and west walls in the bathroomIssued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17059772
- BBroken doors or locksArrange and make self-closing the doors ,, in the entranceIssued Apr 5, 2018 · fix by May 10, 2018 overdue · Violation #12319687
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.