Housing violations · Washington Heights (South)
560 West 174 Street, Manhattan
10033 · 42 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs30
- Broken doors or locks14
- Peeling paint and plaster13
- Plumbing, sinks and toilets11
- Roaches10
- Mold7
- Mice or rats6
- Electrical problems5
- Leaks and water damage4
- Lead paint3
- No heat or hot water2
- Missing smoke or CO detector2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 50 closed · NYC typical: 87 days
from 119 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective wood bottom of base cabinet at south wall in the kitchenIssued Nov 9, 2026 · fix by Dec 14, 2026 · Violation #19357964
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19357956
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 9, 2026 · fix by Dec 5, 2026 · Violation #19357961
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at second window from west at north in the 2nd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19220312
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19210418
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling ,north and west walls in the private hallwayIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210421
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and east walls in the 3rd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210420
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at 1st window from west at north in the 2nd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210424
- BOther repairsRefit lower window sash at the first window from north at east in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210423
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 14, 2026 · fix by Oct 10, 2026 overdue · Violation #19210419
- BOther repairsProperly repair or replace the broken or defective counter balance at lower window sash at fire escape window in the 3rd room from northIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19210426
- BPlumbing, sinks and toiletsRepair the broken or defective connection at the waste-pipe under the sink in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190373
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east at southIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190371
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19190372
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking at bathtub in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19170305
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 2nd room from north at eastIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19170307
- BElectrical problemsProperly repair or replace the broken or defective electrical light switch at north wall in the bathroomIssued Aug 31, 2026 · fix by Oct 5, 2026 overdue · Violation #19170306
- COther repairsProperly repair or replace the broken or defective counter balance at lower sash at fire escape window in the 3rd room from northIssued Aug 31, 2026 · fix by Sep 6, 2026 overdue · Violation #19170303
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146940
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 19, 2026 · fix by Sep 14, 2026 overdue · Violation #19146941
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the bathroomIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146942
- BBroken doors or locksProperly repair with similar material the broken or defective wood door at entrance in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752553
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective rotted wood base cabinet at sink in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752550
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at the ceiling in the bathroomIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752554
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and all walls in the kitchenIssued Apr 3, 2026 · fix by May 8, 2026 overdue · Violation #18752552
- BOther repairsRefit lower sash at 1st window from north at east in the kitchenIssued Mar 30, 2026 · fix by May 4, 2026 overdue · Violation #18754128
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqft at north wall in the 1st room from east at northIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18739486
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Mar 13, 2026 · fix by Mar 13, 2026 overdue · rent impairing · Violation #18706349
- BLead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 1st room from east at southIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703444
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east and south walls in the 1st room from east at northIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703440
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at south wall in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703442
- BOther repairsRefit window lower sash in the 1st room from east at northIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703439
- BElectrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the 1st room from east at northIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703441
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703437
- BOther repairsProperly secure the loose escutcheon plate at heat riser at ceiling in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703438
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles floor in the kitchenIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703432
- BBroken doors or locksProperly repair or replace the broken or defective door frame jamb and casiing in the entranceIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703435
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at wash basin in the bathroomIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18703436
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Feb 17, 2026 · fix by Feb 23, 2026 overdue · Violation #18642312
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tilies in the kitchenIssued Dec 22, 2025 · fix by Jan 26, 2026 overdue · Violation #18516597
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 22, 2025 · fix by Jan 17, 2026 overdue · Violation #18516593
- BMoldTrace and repair the source and abate the visible mold condition less than ten square feet at north wall in the bathroomIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18493788
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective lower cabinet at wash/basin in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18392086
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 24, 2025 · fix by Dec 20, 2025 overdue · Violation #18392091
- BOther repairsProperly secure the loose upper escutcheon plate at east riser pipe in the bathroomIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18392088
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 24, 2025 · fix by Dec 20, 2025 overdue · Violation #18392090
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 14, 2025 · fix by Nov 14, 2025 overdue · rent impairing · Violation #18365321
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 8, 2025 · fix by Nov 3, 2025 overdue · Violation #18280864
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyerIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181430
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2025 · fix by Sep 20, 2025 overdue · Violation #18181429
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 25, 2025 · fix by Sep 20, 2025 overdue · Violation #18181428
- BBroken doors or locksProperly repair or replace the broken or defective doors at upper wall cabinet at south wall in the kitchenIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181433
- BBroken doors or locksProperly repair or replace the broken or defective broken doors at sink base cabinet in the kitchenIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181432
- BOther repairsProperly repair or replace the broken or defective spring balance at upper sash at window at east wall in the kitchenIssued Aug 25, 2025 · fix by Sep 29, 2025 overdue · Violation #18181431
- BOther repairsProperly repair or replace the broken or defective counter balance at upper window sash at east wall in the kitchenIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18150124
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the entranceIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18123847
- BBroken doors or locksProperly repair or replace the broken or defective upper cabinet doors at south wall in the kitchenIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18123846
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 8, 2025 · fix by Sep 3, 2025 overdue · Violation #18150091
- BOther repairsProperly repair or replace the broken or defective escutcheon plate at top of heat riser in the bathroomIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18123853
- BOther repairsRefit upper window sash at east wall in the kitchenIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18123850
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.