Housing violations · Washington Heights (North)
515 West 187 Street, Manhattan
10033 · 43 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Missing smoke or CO detector3
- Peeling paint and plaster3
- Mold2
- Lead paint1
- Broken doors or locks1
- Other repairs1
- Roaches1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 30 closed · NYC typical: 87 days
from 35 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BLead paintProperly repair or replace the broken or defective latch set at fire door leading to west yard at public hall, 1st storyIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19062693
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at fire door to west yard at public hall, 1st storyIssued Oct 9, 2025 · fix by Oct 23, 2025 overdue · Violation #18285271
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17924759
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17924753
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17924752
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jun 2, 2025 · fix by Jul 7, 2025 overdue · Violation #17924758
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at southIssued Dec 5, 2024 · fix by Jan 9, 2025 overdue · Violation #17519991
- CMoldTrace and repair the source and abate the visible mold condition at ceiling and walls approx. 30 sq. ft. in the bathroomIssued Jun 30, 2023 · fix by Jul 26, 2023 overdue · Violation #16072684
- CRoachesAbate the infestation consisting of roachesIssued Jun 21, 2021 · fix by Jul 17, 2021 overdue · Violation #14398219
- BMoldTrace and repair the source and abate the nuisance consisting of mold 4 square feet at south wall, 4 square feet at ceiling in the bathroomIssued Mar 19, 2018 · fix by Apr 23, 2018 overdue · Violation #12292551
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.