Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (North)

658 West 188 Street, Manhattan

10040 · 83 apartments · 6 stories · City Council district 10

By · Updated · Data from NYC HPD

C
22open immediately hazardous violations · 27 per 100 apartments
B43Hazardous, open
A26Non-hazardous, open
!36Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company658-666 WEST REALTY, LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    34
  2. Peeling paint and plaster
    15
  3. Broken doors or locks
    13
  4. Leaks and water damage
    11
  5. No heat or hot water
    7
  6. Plumbing, sinks and toilets
    4
  7. Roaches
    4
  8. Mice or rats
    2
  9. Mold
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C114 days
from 104 closed · NYC typical: 87 days
B120 days
from 160 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding the maximum allowable of 130 f degrees at all hot water fixtures throughout in…Issued Nov 16, 2026 · Violation #19373613
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water temperature exceeding the maximum allowable of 130 f degrees at all hot water fixtures throughout in…Issued Nov 16, 2026 · Violation #19373619
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19365175
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the limit 130 degrees in the entire apartmentIssued Nov 10, 2026 · fix by Nov 16, 2026 · Violation #19356843
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19356856
  • B
    Other repairsProperly repair or replace the broken or defective ceramic floor tiles in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19356873
  • B
    Plumbing, sinks and toiletsProperly secure the loose wash basin in the bathroomIssued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19356880
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Nov 10, 2026 · fix by Dec 15, 2026 · Violation #19356911
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19370262
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2026 · fix by Dec 6, 2026 · Violation #19370261
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19357404
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19357405
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from northIssued Nov 6, 2026 · fix by Dec 11, 2026 · Violation #19357403
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 6, 2026 · fix by Nov 6, 2026 overdue · rent impairing · Violation #19357406
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Nov 6, 2026 · fix by Nov 12, 2026 overdue · Violation #19357407
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19357398
  • C
    No heat or hot water& 309 m/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartmentIssued Nov 5, 2026 · fix by Nov 11, 2026 overdue · Violation #19331782
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the foyerIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331780
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331779
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 28, 2026 · fix by Dec 2, 2026 · Violation #19331781
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st storyIssued Oct 20, 2026 · fix by Nov 3, 2026 overdue · Violation #19311183
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304526
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304524
  • B
    Leaks and water damageRepair the leaky and/or defective water supply pipe at cold water supply line at wash basin in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19304525
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower window sash, the 1st window from south at west wall in the 3rd room from east at…Issued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19304527
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19304528
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at building entrance doorIssued Oct 15, 2026 · fix by Oct 29, 2026 overdue · Violation #19296855
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 15, 2026 · fix by Oct 15, 2026 overdue · rent impairing · Violation #19296853
  • C
    Broken doors or locksProvide a heavy-duty key operated locking device at building entrance doorIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19284391
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 14, 2026 · fix by Oct 14, 2026 overdue · rent impairing · Violation #19295415
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294794
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 14, 2026 · fix by Nov 9, 2026 overdue · Violation #19294804
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at boiler roomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19295267
  • B
    Other repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294807
  • B
    Other repairsProperly repair or replace the broken or defective defective counter balance at lower window sash at first window from south at west wall in the 1st room from…Issued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294796
  • B
    Other repairsReplace the broken or defective wasteline pipe in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · rent impairing · Violation #19294797
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294798
  • B
    Other repairsProperly repair or replace the broken or defective counter balance at lower window sash at south wall at 2nd public hall from east, 3rd storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294809
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294792
  • C
    Broken doors or locksProvide ready access to buildings heating system locked door at cellar at boiler roomIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19295416
  • B
    Broken doors or locksProperly repair or replace the broken or defective heavy duty lock at door in building entrance , 1st storyIssued Oct 14, 2026 · fix by Nov 18, 2026 · Violation #19294795
  • B
    Broken doors or locksProperly repair or replace the broken or defective magnetic strip at building entrance door at public hall, 1st storyIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19284061
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218676
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket seal at upper and lower refrigerator doors in the kitchenIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218672
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Sep 17, 2026 · fix by Oct 22, 2026 overdue · Violation #19218677
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176440
  • B
    Other repairsProperly repair or replace the broken or defective spring balance at lower sash window at south in the 1st room from eastIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176439
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Sep 1, 2026 · fix by Oct 6, 2026 overdue · Violation #19176441
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at cieling and north wall in the 2nd room from northIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108726
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from northIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19108725
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037252
  • B
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037247
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective laminated counter top at sink in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037248
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037249
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective laminated counter top at sink in the kitchenIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037251
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037253
  • B
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the 1st room from northIssued Jun 29, 2026 · fix by Aug 3, 2026 overdue · Violation #19037255
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 15, 2026 · fix by Jul 11, 2026 overdue · Violation #18995639
  • B
    Other repairsProperly repair or replace the broken or defective intercom system from the building entrance to the panel at north wall, in the private hallwayIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18995638
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 5th storyIssued Oct 23, 2025 · fix by Nov 6, 2025 overdue · Violation #18316236

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

1042017
452018
372019
52020
572021
502022
182023
1072024
1782025
902026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 833 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.