Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Washington Heights (North)

565 West 192 Street, Manhattan

10040 · 30 apartments · 5 stories · City Council district 10

By · Updated · Data from NYC HPD

C
3open immediately hazardous violations · 10 per 100 apartments
B13Hazardous, open
A1Non-hazardous, open
!13Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has fewer.

Who owns and manages it

Owning companyHEIGHTS ESTATES LLC
Landlord (head officer or owner)Moshe Piller

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    6
  2. Peeling paint and plaster
    4
  3. Mold
    3
  4. Plumbing, sinks and toilets
    2
  5. Leaks and water damage
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C89 days
from 39 closed · NYC typical: 87 days
B119 days
from 67 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair or replace the broken or defective upper cabinet shelves at south wall in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19278381
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet at sink in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19278380
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around the sink fixture in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19278383
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19278382
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278374
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278376
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278377
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at westIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278379
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from north at eastIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278375
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Oct 8, 2026 · fix by Nov 12, 2026 overdue · Violation #19278378
  • C
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at westIssued Sep 22, 2026 · fix by Sep 28, 2026 overdue · Violation #19232322
  • B
    Other repairsProperly repair with similar material the broken or defective hardwood floor in the 1st room from north at westIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232323
  • B
    MoldTrace and repair the source and abate the visible mold condition more then 10 sq ft of mold on the north wall, the south wall, the west wall, the east wall…Issued Jul 17, 2025 · fix by Aug 21, 2025 overdue · Violation #18085048
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq. ft. at the west wall in the 1st room from north at westIssued Mar 12, 2025 · fix by Apr 7, 2025 overdue · Violation #17750398
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq. ft. at the north wall in the 1st room from north at westIssued Mar 12, 2025 · fix by Apr 7, 2025 overdue · Violation #17750399
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling , east, and west walls in the private hallwayIssued May 26, 2015 · fix by Jun 30, 2015 overdue · Violation #10722751

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

62017
182018
42019
52020
12021
642022
462023
332024
672025
172026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 282 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.