Housing violations · Washington Heights (North)
558 West 193 Street, Manhattan
10040 · 31 apartments · 6 stories · City Council district 10
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs18
- Lead paint10
- Peeling paint and plaster7
- Roaches7
- Leaks and water damage6
- Mold4
- Electrical problems2
- Broken doors or locks1
- Plumbing, sinks and toilets1
- Mice or rats1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 95 closed · NYC typical: 87 days
from 144 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 28, 2026 · fix by Nov 21, 2026 · Violation #19337635
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Oct 28, 2026 · fix by Nov 21, 2026 · Violation #19337636
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles by radiator in the 1st room from east at southIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316663
- BOther repairsProperly repair with similar material the broken or defective wood subfloor by radiator in the 1st room from east at southIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316661
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and east walls in the 1st room from east at southIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316658
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and east walls in the 1st room from east at southIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316657
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316655
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316652
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of bedframe blocking window to fire escape in the 4th room from northIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19316645
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the 4th room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316644
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 4th room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316643
- BOther repairsProperly repair or replace the broken or defective radiator control knob in the 4th room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316642
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316659
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316632
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316631
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at room with oil tank at cellarIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316621
- BOther repairsM/d law discontinue the storage of combustible material construction material at boiler room at cellarIssued Oct 21, 2026 · fix by Nov 25, 2026 · rent impairing · Violation #19316623
- BLeaks and water damageRepair the leaky and/or defective faucets showerhead in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316635
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective sink base cabinet in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316633
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316665
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 2nd room from eastIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316638
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at boiler room at cellarIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316617
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316654
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east at northIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316637
- BLeaks and water damageRepair the roof so that it will not leak at ceiling, north, west and east walls in the 1st room from east at northIssued Oct 21, 2026 · fix by Nov 25, 2026 · rent impairing · Violation #19316636
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316634
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling at public hall, 1st storyIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316616
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and west walls ceiling in the kitchenIssued Oct 21, 2026 · fix by Nov 25, 2026 · Violation #19316650
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sqaure feet at south wall in the bathroomIssued Jan 27, 2026 · fix by Mar 3, 2026 overdue · Violation #18604166
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed bx cable at ceiling and south wall in the kitchenIssued Dec 24, 2025 · fix by Jan 28, 2026 overdue · Violation #18529300
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling and south wall in the bathroomIssued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18330437
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 20, 2025 · fix by Jul 14, 2025 overdue · Violation #18045446
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 18, 2025 · fix by Jul 12, 2025 overdue · Violation #18044213
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 18, 2025 · fix by Jul 12, 2025 overdue · Violation #18044214
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 18, 2025 · fix by Jul 12, 2025 overdue · Violation #18044215
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 18, 2025 · fix by Jul 12, 2025 overdue · Violation #18044217
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jun 18, 2025 · fix by Jul 12, 2025 overdue · Violation #18044216
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 17, 2025 · fix by Jul 13, 2025 overdue · Violation #18014574
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 9, 2025 · fix by Jul 5, 2025 overdue · Violation #17943946
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 6, 2025 · fix by Jul 2, 2025 overdue · Violation #17943557
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866228
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued May 1, 2025 · fix by Jun 5, 2025 overdue · Violation #17866226
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Apr 11, 2025 · fix by May 16, 2025 overdue · Violation #17825171
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17799839
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Mar 31, 2025 · fix by May 5, 2025 overdue · Violation #17799836
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17799840
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2025 · fix by Apr 26, 2025 overdue · Violation #17799823
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 19, 2025 · fix by Apr 12, 2025 overdue · Violation #17775609
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Mar 19, 2025 · fix by Apr 12, 2025 overdue · Violation #17775610
- BOther repairsProperly repair with similar material the broken or defective wood floor uneven in the 2nd room from northIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17758865
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from north at eastIssued Mar 12, 2025 · fix by Apr 16, 2025 overdue · Violation #17759387
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 20, 2023 · fix by Jan 15, 2024 overdue · Violation #16528648
- CMoldTrace and repair the source and abate the visible mold condition at ceiling 10 sq. ft., east wall 8 sq. ft , north wall 12 sq. ft in the bathroomIssued Oct 16, 2023 · fix by Nov 11, 2023 overdue · Violation #16306868
- BMoldTrace and repair the source and abate the visible mold condition approx 6 sq.ft at ceiling, approx 8 sq.ft at north wall in the kitchenIssued Jun 13, 2022 · fix by Jul 18, 2022 overdue · Violation #15209370
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 27, 2020 · fix by Sep 22, 2020 overdue · Violation #13735618
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.