Housing violations · Sunnyside
39-85 50 Street, Queens
11377 · 61 apartments · 6 stories · City Council district 26
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster43
- Other repairs26
- Leaks and water damage23
- Broken doors or locks15
- Missing smoke or CO detector12
- Mice or rats9
- No heat or hot water6
- Plumbing, sinks and toilets5
- Roaches5
- Mold5
- Lead paint4
- Electrical problems1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 34 closed · NYC typical: 87 days
from 45 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19321109
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellar at boiler roomIssued Oct 27, 2026 · fix by Nov 2, 2026 overdue · Violation #19321112
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19321108
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19321110
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19321111
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19321113
- CBroken doors or locksProvide ready access to buildings heating system door locked at basement at boiler roomIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19259654
- CBroken doors or locksProperly repair or replace the broken or defective mortise lock at building entrance door , 1st storyIssued Oct 1, 2026 · fix by Oct 7, 2026 overdue · Violation #19259649
- BLeaks and water damageRepair the roof so that it will not leak ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19259653
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallwayIssued Oct 1, 2026 · fix by Nov 5, 2026 overdue · Violation #19259652
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 1, 2026 · fix by Oct 1, 2026 overdue · rent impairing · Violation #19259650
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 9, 2026 · fix by Sep 9, 2026 overdue · rent impairing · Violation #19203061
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124535
- BOther repairsProperly repair with similar material the broken or defective vinyl floor tiles in the kitchenIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124573
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective flooring at sink base cabinet front in the kitchenIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124545
- BBroken doors or locksProperly repair with similar material the broken or defective wood saddle at entrance door way in the kitchenIssued Aug 6, 2026 · fix by Sep 10, 2026 overdue · Violation #19124574
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 17, 2026 · fix by Aug 10, 2026 overdue · Violation #19087667
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 17, 2026 · fix by Aug 10, 2026 overdue · Violation #19087669
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Jul 17, 2026 · fix by Aug 10, 2026 overdue · Violation #19087668
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at bulkhead at public hall, 6th storyIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · rent impairing · Violation #19063448
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063373
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3 story balcony 1st stack from north at east…Issued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063465
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at compactor closet, 6th storyIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · Violation #19063455
- BLeaks and water damageRepair the roof so that it will not leak over ceiling at compactor closet, 6th storyIssued Jul 9, 2026 · fix by Aug 13, 2026 overdue · rent impairing · Violation #19063457
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the kitchenIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056996
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroomIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056998
- BOther repairsAbate the nuisance consisting of pests. evidence of flies in the kitchenIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19062935
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling in the kitchenIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056994
- CRoachesAbate the infestation consisting of roaches in the kitchenIssued Jul 8, 2026 · fix by Aug 3, 2026 overdue · Violation #19056993
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jul 8, 2026 · fix by Aug 3, 2026 overdue · Violation #19056992
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 8, 2026 · fix by Aug 3, 2026 overdue · Violation #19056991
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and east wall in the kitchenIssued Jul 8, 2026 · fix by Aug 12, 2026 overdue · Violation #19056995
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of key operated locking device installed at door in the entrance to room with fire escape window in the 1st room…Issued Jul 2, 2026 · fix by Jul 8, 2026 overdue · Violation #19049686
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19015726
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the kitchenIssued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19015727
- BBroken doors or locksProperly repair with similar material the broken or defective fire retardant material at north and south wall near building entrance door at lobby, 1st storyIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801575
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 31, 2026 · fix by May 5, 2026 overdue · Violation #18749959
- BBroken doors or locksProperly repair or replace the broken or defective intercom system from building entrance door to the answering unit at south wall in the kitchenIssued Feb 26, 2026 · fix by Apr 2, 2026 overdue · Violation #18668149
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 22, 2026 · fix by Feb 26, 2026 overdue · Violation #18582864
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 22, 2026 · fix by Feb 26, 2026 overdue · Violation #18582863
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Jan 22, 2026 · fix by Jan 22, 2026 overdue · rent impairing · Violation #18582862
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling and north wall at public hall, 1st storyIssued Jan 22, 2026 · fix by Feb 26, 2026 overdue · Violation #18582867
- BOther repairsProperly repair with similar material the broken or defective fire retardant material at north and south walls at public hall, 1st storyIssued Jan 21, 2026 · fix by Feb 25, 2026 overdue · Violation #18581481
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18580884
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from east at southIssued Jan 20, 2026 · fix by Feb 24, 2026 overdue · Violation #18580881
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 20, 2026 · fix by Feb 15, 2026 overdue · Violation #18575672
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroomIssued Jan 15, 2026 · fix by Feb 19, 2026 overdue · Violation #18571610
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 15, 2026 · fix by Feb 10, 2026 overdue · Violation #18571611
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18526763
- BBroken doors or locksProperly repair or replace the broken or defective sash lock at fire escape window at west wall in the 2nd room from northIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18526762
- BOther repairsProperly secure the loose escutcheon plate at steam riser at ceiling in the bathroomIssued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18526761
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Dec 26, 2025 · fix by Jan 30, 2026 overdue · Violation #18526764
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 4, 2025 · fix by Aug 10, 2025 overdue · Violation #18129255
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective drain pipe of sink base in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18129258
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18129256
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Aug 4, 2025 · fix by Sep 8, 2025 overdue · Violation #18129257
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq feet at the south and west walls in the bathroomIssued Jul 15, 2025 · fix by Aug 19, 2025 overdue · Violation #18098800
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroomIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17851843
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 28, 2025 · fix by May 24, 2025 overdue · Violation #17851847
- BOther repairsProperly repair with similar material the broken or defective at ceramic floor tiles in the kitchenIssued Apr 28, 2025 · fix by Jun 2, 2025 overdue · Violation #17851845
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.