Housing violations · Parkchester
1530 Archer Road, Bronx
10462 · 67 apartments · 8 stories · City Council district 18
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Lead paint7
- Peeling paint and plaster6
- Other repairs5
- Leaks and water damage4
- Roaches3
- Broken doors or locks1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 9 closed · NYC typical: 87 days
from 6 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from eastIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958339
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued May 28, 2026 · fix by Jul 2, 2026 overdue · Violation #18958340
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall at building vestibuleIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18704501
- BOther repairsProperly repair with similar material the broken or defective fire retardent material at ceiling and east wall at building vestibuleIssued Mar 12, 2026 · fix by Apr 16, 2026 overdue · Violation #18704502
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall and at ceiling in the 1st room from northIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441492
- COther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18441490
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at north wall and at ceiling in the bathroomIssued Nov 28, 2025 · fix by Jan 2, 2026 overdue · Violation #18441489
- COther repairsProperly repair with similar material the broken or defective wood floor in the 2nd private hallway from northIssued Nov 28, 2025 · fix by Dec 4, 2025 overdue · Violation #18441491
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective spring hinges at the door in the entranceIssued Dec 18, 2024 · fix by Jan 1, 2025 overdue · Violation #17552523
- COther repairsProperly repair with similar material the broken or defective lifting and separating wood floor slats creating a trip hazard in the private hallwayIssued Dec 18, 2024 · fix by Dec 24, 2024 overdue · Violation #17552521
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 20, 2024 · fix by Jun 24, 2024 overdue · Violation #17063176
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Jun 20, 2024 · fix by Jun 24, 2024 overdue · Violation #17063175
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued May 2, 2024 · fix by May 26, 2024 overdue · Violation #16946003
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945360
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945361
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945362
- CLead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued May 1, 2024 · fix by May 25, 2024 overdue · Violation #16945359
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 29, 2024 · fix by May 25, 2024 overdue · Violation #16933528
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 28, 2022 · fix by Jul 24, 2022 overdue · Violation #15234481
- CRoachesAbate the infestation consisting of roachesIssued Dec 22, 2020 · fix by Jan 17, 2021 overdue · Violation #13953499
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.