Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Woodside

39-25 65 Street, Queens

11377 · 48 apartments · 6 stories · City Council district 26

By · Updated · Data from NYC HPD

C
10open immediately hazardous violations · 21 per 100 apartments
B16Hazardous, open
A14Non-hazardous, open
!39Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

2 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning company39-25 65TH STREET, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    10
  2. Other repairs
    8
  3. Mold
    8
  4. Broken doors or locks
    5
  5. Leaks and water damage
    3
  6. Roaches
    2
  7. Missing window guards
    2
  8. Plumbing, sinks and toilets
    1
  9. Lead paint
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C96 days
from 38 closed · NYC typical: 84 days
B244 days
from 42 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east wall at public hall, 1st storyIssued Aug 19, 2026 · fix by Sep 23, 2026 overdue · Violation #19146947
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19141544
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 14, 2026 · fix by Sep 9, 2026 overdue · Violation #19141530
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 6, 2026 · fix by Sep 1, 2026 overdue · Violation #19124878
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet, 4th storyIssued Jun 18, 2026 · fix by Jul 2, 2026 overdue · Violation #19018505
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling at closet in the 1st room from eastIssued Jun 18, 2026 · fix by Jul 23, 2026 overdue · rent impairing · Violation #19018429
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at compactor closet, 5th storyIssued Jun 18, 2026 · fix by Jul 2, 2026 overdue · Violation #19018494
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at leading to south section at public hall, 3rd storyIssued Mar 16, 2026 · fix by Mar 30, 2026 overdue · Violation #18707504
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 17, 2025 · fix by Dec 13, 2025 overdue · Violation #18371342
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling at vestibule at public hall, 1st storyIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355100
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at stair bulkhead at section north at public hall, 6th storyIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355094
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at east and south walls at stair bulkhead at section south at public…Issued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18355089
  • B
    Other repairsProperly repair with similar material the broken or defective fire retatdant material at east wall, window reveal at public hall stairs, 1st story, section…Issued Oct 27, 2025 · fix by Dec 1, 2025 overdue · Violation #18324522
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling inside closet in the 1st room from northIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · Violation #18247838
  • B
    Leaks and water damageRepair the roof so that it will not leak over the ceilling inside closet in the 1st room from northIssued Sep 24, 2025 · fix by Oct 29, 2025 overdue · rent impairing · Violation #18247837
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at ceiling west north and east walls in the bathroomIssued May 5, 2025 · fix by Jun 9, 2025 overdue · Violation #17863059
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 square feet all walls and ceiling in the bathroomIssued Mar 6, 2025 · fix by Apr 1, 2025 overdue · Violation #17739329
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10sq ft at ceiling and all walls in the bathroomIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17610984
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq. ft. at ceiling, north, east, south, and west walls in the bathroomIssued Dec 23, 2024 · fix by Jan 27, 2025 overdue · Violation #17567902
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 7, 2024 · fix by Nov 2, 2024 overdue · Violation #17326851
  • B
    Other repairsProperly repair or replace the broken or defective latch set in the entranceIssued Oct 7, 2024 · fix by Nov 11, 2024 overdue · Violation #17326852
  • C
    MoldTrace and repair the source and abate the visible mold condition approx 10sqft at ceiling , 10 sqft at north wall,5 sqft at west wall in the bathroomIssued Jul 8, 2024 · fix by Aug 3, 2024 overdue · Violation #17105884
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 5 sq ft at south wall and ceiling in the bathroomIssued Feb 12, 2024 · fix by Mar 18, 2024 overdue · Violation #16669719
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective fire door hinges at public hall, 5th storyIssued Jan 19, 2024 · fix by Feb 2, 2024 overdue · Violation #16604488
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 1 sq. ft. at west wall in the bathroomIssued Jun 1, 2021 · fix by Jul 6, 2021 overdue · Violation #14364002
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall in the 3rd room from north at westIssued May 12, 2021 · fix by Jun 16, 2021 overdue · Violation #14333051

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

202021
42023
262024
562025
442026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 334 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.