Housing violations · Allerton
733 Arnow Avenue, Bronx
10467 · 51 apartments · 6 stories · City Council district 12
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster15
- Roaches13
- Other repairs10
- Lead paint10
- Mold9
- Broken doors or locks8
- Mice or rats8
- Leaks and water damage2
- Plumbing, sinks and toilets2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 144 closed · NYC typical: 87 days
from 191 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BOther repairsProvide an adequate supply of gas to the fixtures at the range in the kitchenIssued Oct 2, 2026 · fix by Nov 6, 2026 overdue · rent impairing · Violation #19265106
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218696
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 16, 2026 · fix by Oct 12, 2026 overdue · Violation #19218697
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218695
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Aug 21, 2026 · fix by Aug 27, 2026 overdue · rent impairing · Violation #19136779
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19144643
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19144639
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19144642
- BOther repairsProperly repair or replace the broken or defective lower sash pane of 2nd window from east at south in the 4th room from north at eastIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19136776
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Aug 17, 2026 · fix by Sep 21, 2026 overdue · Violation #19136775
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19136774
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19136773
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19144645
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Aug 17, 2026 · fix by Sep 10, 2026 overdue · Violation #19144640
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued May 11, 2026 · fix by Jun 15, 2026 overdue · Violation #18909330
- COther repairsReplace with new the missing lower window sash at the 2nd window from west at north wall in the 1st room from northIssued Jan 8, 2026 · fix by Jan 14, 2026 overdue · Violation #18553746
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 8, 2026 · fix by Feb 3, 2026 overdue · Violation #18553749
- CBroken doors or locksProperly repair or replace the broken or defective latch set and it's assembly at door in the entranceIssued Nov 3, 2025 · fix by Nov 9, 2025 overdue · Violation #18340154
- COther repairsProperly repair or replace the broken or defective cracked (inner pane) top sash at fire escape window in the 4th room from northIssued Nov 3, 2025 · fix by Nov 9, 2025 overdue · Violation #18340151
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 10, 2025 · fix by Mar 8, 2025 overdue · Violation #17681043
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 2, 2025 · fix by Jan 28, 2025 overdue · Violation #17589145
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 26, 2024 · fix by Jan 21, 2025 overdue · Violation #17576084
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 26, 2024 · fix by Jan 21, 2025 overdue · Violation #17576085
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 5, 2024 · fix by Aug 31, 2024 overdue · Violation #17166627
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at south wall in the kitchenIssued Jul 29, 2024 · fix by Sep 2, 2024 overdue · Violation #17150526
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Jul 29, 2024 · fix by Aug 4, 2024 overdue · Violation #17150525
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 1, 2024 · fix by May 27, 2024 overdue · Violation #16936058
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2024 · fix by May 11, 2024 overdue · Violation #16852167
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 26, 2024 · fix by Mar 23, 2024 overdue · Violation #16697739
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 23, 2024 · fix by Mar 20, 2024 overdue · Violation #16690491
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 23, 2024 · fix by Mar 20, 2024 overdue · Violation #16690490
- CLead paint& 309 m/d law abate the nuisance consisting of a key operated lock at door leading to fire escape window in the 4th room from eastIssued Feb 23, 2024 · fix by Feb 29, 2024 overdue · Violation #16690499
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 15, 2024 · fix by Mar 12, 2024 overdue · Violation #16669959
- CLead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jan 29, 2024 · fix by Feb 2, 2024 overdue · Violation #16630582
- CLead paintCorrect failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to…Issued Jan 29, 2024 · fix by Feb 2, 2024 overdue · Violation #16630581
- CMoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at ceiling, 8 sq ft at south wall, 8 sq ft at north wall, 4 sq ft at west wall…Issued Nov 2, 2023 · fix by Nov 28, 2023 overdue · Violation #16356042
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 5, 2023 · fix by Jul 31, 2023 overdue · Violation #16074883
- CMoldTrace and repair the source and abate the visible mold condition 31 sq. ft at ceiling in the bathroomIssued Apr 28, 2023 · fix by May 24, 2023 overdue · Violation #15945741
- BOther repairs& 309 m/d law abate the nuisance consisting of gas operated dryer (req# 311-13498289) in the kitchenIssued Feb 17, 2023 · fix by Mar 24, 2023 overdue · Violation #15729944
- BMoldTrace and repair the source and abate the visible mold condition approx 8 sq ft at wall. approx 4 sq. ft at east wall. approx 8 ft at window casing. in the…Issued May 19, 2022 · fix by Jun 23, 2022 overdue · Violation #15157320
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 20, 2021 · fix by Oct 16, 2021 overdue · Violation #14565443
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Jun 1, 2021 · fix by Jun 25, 2021 overdue · Violation #14364021
- BMoldTrace and repair the source and abate the visible mold condition approx. 20 sq.ft. at the north wall, 1st window frame from west at north wall, west wall,…Issued May 7, 2021 · fix by Jun 11, 2021 overdue · Violation #14320253
- BMoldTrace and repair the source and abate the visible mold condition approximately 10 sq ft at north window well in the bathroomIssued Aug 31, 2020 · fix by Oct 5, 2020 overdue · Violation #13793309
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 31, 2020 · fix by Sep 26, 2020 overdue · Violation #13792762
- CMoldTrace and repair the source and abate the visible mold condition approximately 30 square feet at ceiling in the bathroomIssued Aug 31, 2020 · fix by Sep 26, 2020 overdue · Violation #13792766
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 31, 2020 · fix by Sep 26, 2020 overdue · Violation #13792761
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 1, 2019 · fix by Jul 22, 2019 overdue · Violation #13148863
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 1, 2019 · fix by Jul 22, 2019 overdue · Violation #13148860
- CLead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued May 31, 2016 · fix by Jun 28, 2016 overdue · Violation #11253540
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Aug 12, 2013 · fix by Sep 9, 2013 overdue · Violation #9938525
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.