Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2670 Bainbridge Avenue, Bronx

10458 · 69 apartments · 6 stories · City Council district 15

By · Updated · Data from NYC HPD

C
101open immediately hazardous violations · 146 per 100 apartments
B143Hazardous, open
A46Non-hazardous, open
!266Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

18 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company2670 ASSOCIATES LLC
Landlord (head officer or owner)Leze Gazivoda

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    68
  2. Broken doors or locks
    55
  3. Peeling paint and plaster
    32
  4. Mold
    25
  5. Leaks and water damage
    24
  6. Mice or rats
    20
  7. Plumbing, sinks and toilets
    15
  8. Roaches
    15
  9. Missing smoke or CO detector
    10
  10. Lead paint
    9
  11. Electrical problems
    9
  12. No heat or hot water
    6
  13. Missing window guards
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C80 days
from 162 closed · NYC typical: 87 days
B99 days
from 150 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective hinges at door leading from vestibule to public hall at public hallIssued Nov 2, 2026 · fix by Nov 16, 2026 · Violation #19339833
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 2, 2026 · fix by Oct 30, 2026 overdue · rent impairing · Violation #19339831
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · Violation #19339832
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 23, 2026 · fix by Oct 23, 2026 overdue · rent impairing · Violation #19319042
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch set at vestibule door at basement storyIssued Oct 23, 2026 · fix by Nov 6, 2026 overdue · Violation #19319039
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 23, 2026 · fix by Nov 18, 2026 · Violation #19319038
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set at vestibule door at basement storyIssued Oct 23, 2026 · fix by Nov 27, 2026 · Violation #19319040
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 19, 2026 · fix by Nov 2, 2026 overdue · Violation #19300939
  • B
    Plumbing, sinks and toiletsReplace the broken or defective at wash basin in the 2nd bathroom from eastIssued Oct 19, 2026 · fix by Nov 23, 2026 · rent impairing · Violation #19300936
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective bottom wood at base cabinet at sink in the kitchenIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19300938
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 9, 2026 · fix by Nov 4, 2026 overdue · Violation #19283876
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 9, 2026 · fix by Oct 15, 2026 overdue · Violation #19283868
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283871
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 9, 2026 · fix by Oct 9, 2026 overdue · rent impairing · Violation #19283867
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling and west wall in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283870
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 9, 2026 · fix by Nov 4, 2026 overdue · Violation #19283874
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283869
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283872
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249803
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the foyerIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249804
  • B
    Electrical problemsReplace with new the missing electrical outlet cover plate at south wall in the bathroomIssued Sep 28, 2026 · fix by Nov 2, 2026 overdue · Violation #19249805
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system…Issued Sep 28, 2026 · fix by Oct 4, 2026 overdue · Violation #19249807
  • B
    Other repairsFire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate at east wall in the 2nd room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233378
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233382
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233381
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection wasteline at sink in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233377
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233379
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 2nd room from eastIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19233380
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212628
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch and assemblies at vestibule door at public hallIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212631
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at vestibule door at public hallIssued Sep 14, 2026 · fix by Sep 28, 2026 overdue · Violation #19212630
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212629
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch at building entrance door at basementIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19220737
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at building entrance door at basementIssued Sep 14, 2026 · fix by Sep 28, 2026 overdue · Violation #19220736
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Sep 14, 2026 · fix by Sep 13, 2026 overdue · rent impairing · Violation #19212623
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling and west wall in the kitchenIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212626
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212627
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of expose wires light fixture at ceiling ( stair a) at public hall stairs, 3rd storyIssued Sep 14, 2026 · fix by Oct 19, 2026 overdue · Violation #19212632
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 4th story balcony at 1st fire escape…Issued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191228
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of lockable slidebolt installed at apartment door in the entranceIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19191230
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of a key operated lock installed at door leading to fire escape window in the 1st room from east at southIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19191231
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19191226
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19191227
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Aug 31, 2026 · fix by Sep 24, 2026 overdue · Violation #19180348
  • B
    Other repairsProperly repair or replace the broken or defective spring balances at lower sash of north window in the kitchenIssued Aug 28, 2026 · fix by Oct 2, 2026 overdue · Violation #19161320
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 2nd private hallway from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161317
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 25, 2026 · fix by Sep 20, 2026 overdue · Violation #19161326
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161325
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 1st private hallway from eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19161319
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 25, 2026 · fix by Sep 20, 2026 overdue · Violation #19161314
  • C
    Broken doors or locksRemove the illegal fastening push/panic bar installed at door to roof preventing re-entery from roff to building , 6th storyIssued Aug 20, 2026 · fix by Aug 26, 2026 overdue · rent impairing · Violation #19130316
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at apartment door in the entranceIssued Aug 13, 2026 · fix by Aug 27, 2026 overdue · Violation #19129740
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19129736
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective broken lower shelf at sink base cabinet in the kitchenIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19129734
  • B
    Other repairsMake safe by properly repairing the structural defect vertical crack at building south exterior wall from 1st story to 5th storyIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · rent impairing · Violation #19130317
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around wash basin in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19129739
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective missing ceramic tiles around bathtub in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19129737
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Aug 12, 2026 · fix by Aug 18, 2026 overdue · Violation #19129729
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Aug 12, 2026 · fix by Aug 26, 2026 overdue · Violation #19129733
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchenIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · Violation #19129741

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

352017
1392018
882019
212020
222021
242022
852023
1352024
1012025
2932026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 2,024 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.