Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Norwood

3525 Bainbridge Avenue, Bronx

10467 · 40 apartments · 6 stories · City Council district 11

By · Updated · Data from NYC HPD

C
24open immediately hazardous violations · 60 per 100 apartments
B21Hazardous, open
A6Non-hazardous, open
!30Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning companyBAINBRIDGE GATE II LLC
Landlord (head officer or owner)Adi Joseph

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Mold
    17
  2. Peeling paint and plaster
    8
  3. Lead paint
    8
  4. Broken doors or locks
    6
  5. Roaches
    6
  6. Other repairs
    4
  7. Plumbing, sinks and toilets
    1
  8. Missing window guards
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C90 days
from 39 closed · NYC typical: 87 days
B107 days
from 99 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Other repairsRemove all encumbrances consisting of construction materials and households items at public hall, 4th storyIssued Nov 2, 2026 · fix by Dec 7, 2026 · rent impairing · Violation #19334202
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337994
  • B
    Other repairsReplace with new the missing eschueton plate at ceiling at heat raiser in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337996
  • B
    Lead paintProperly repair or replace the broken or defective latch set and its assemblies at building entrance door leading from street to vestibule at public hall, 1st…Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338003
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster at ceiling in closet in the private hallwayIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337993
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallwayIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337995
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective latch at door in the entranceIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19337999
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyerIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337998
  • B
    Broken doors or locksProperly repair or replace the broken or defective latch set and its assemblies at door in the entranceIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19338000
  • C
    Lead paintReplace or repair the self-closing doors that is missing or defective latch at building entrance door leading from street to vestibule at public hall, 1st storyIssued Oct 30, 2026 · fix by Nov 13, 2026 overdue · Violation #19338002
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337997
  • C
    Lead paintRemove the illegal fastening key operated lock installed at door leading to north yard at public hall, 1st storyIssued Oct 30, 2026 · fix by Nov 5, 2026 overdue · rent impairing · Violation #19338001
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Oct 27, 2026 · fix by Nov 20, 2026 · Violation #19336474
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall in the 1st room from northIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19328804
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroomIssued Oct 27, 2026 · fix by Dec 1, 2026 · Violation #19328807
  • C
    MoldTrace and repair the source and abate the visible mold condition greater than 30 sq ft at south wall, west wall, 1st window frame from south at west wall,…Issued Oct 27, 2026 · fix by Nov 22, 2026 · Violation #19328802
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Oct 27, 2026 · fix by Nov 20, 2026 · Violation #19336477
  • C
    Lead paint- correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or…Issued Oct 27, 2026 · fix by Nov 20, 2026 · Violation #19336475
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at all walls and ceiling in the bathroomIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19142699
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 10 sq ft at north wall in the 1st room from north at westIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19142700
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18767600
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 27, 2024 · fix by Jan 10, 2025 overdue · Violation #17578559
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 7, 2024 · fix by Oct 21, 2024 overdue · Violation #17327756
  • C
    MoldTrace and repair the source and abate the visible mold condition approximately 30 sq ft at 1st closet from east at south wall, walls and 10 sq ft at ceiling…Issued Jun 6, 2024 · fix by Jul 2, 2024 overdue · Violation #17023310
  • B
    MoldTrace and repair the source and abate the visible mold condition approximately 7 sq. ft. at ceiling in the 1st closet from east at south in the foyerIssued Apr 24, 2024 · fix by May 29, 2024 overdue · Violation #16929974
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of household items and furniture obstructing egress through fire escape window in the 1st room from northIssued Apr 3, 2024 · fix by Apr 9, 2024 overdue · Violation #16791622
  • C
    MoldTrace and repair the source and abate the visible mold condition approximately 30 sq. ft. at all walls and ceiling inside closet, 1st from east at south wall…Issued Apr 3, 2024 · fix by Apr 29, 2024 overdue · Violation #16791617
  • C
    MoldTrace and repair the source and abate the visible mold condition at east wall approximately 30 sq ft. at south wall approximately 30 sq ft. at west wall…Issued Mar 18, 2024 · fix by Apr 13, 2024 overdue · Violation #16755295
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Aug 16, 2023 · fix by Aug 22, 2023 overdue · Violation #12844185
  • B
    MoldTrace and repair the source and abate the visible mold condition approx 8 sq ft east wall, approx 6 sq ft the ceiling in the bathroomIssued Jul 14, 2022 · fix by Aug 18, 2022 overdue · Violation #15262538
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2022 · fix by Aug 9, 2022 overdue · Violation #15262568
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling 6 sq.ft. , east wall 2 sq.ft. and south wall 4 sq.ft. in the south -1 closet in…Issued Jul 7, 2022 · fix by Aug 2, 2022 overdue · Violation #15253925
  • B
    MoldTrace and repair the source and abate the visible mold condition on closet ceiling approx. 6 sq ft. and closet south wall approx. 4 sq ft. in the foyerIssued Jul 6, 2022 · fix by Aug 10, 2022 overdue · Violation #15252149
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 26, 2021 · fix by Sep 21, 2021 overdue · Violation #14517451
  • B
    MoldTrace and repair the source and abate the visible mold condition on window stool approx 2 sq ft in the 1st room from northIssued Jun 23, 2020 · fix by Jul 28, 2020 overdue · Violation #13704105
  • B
    MoldTrace and repair the source and abate the visible mold condition at west wall approx. 3 sqft. in the bathroomIssued Jun 12, 2020 · fix by Jul 17, 2020 overdue · Violation #13694850
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 18, 2020 · fix by Mar 10, 2020 overdue · Violation #13603277
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 20, 2019 · fix by Mar 13, 2019 overdue · Violation #12916983
  • B
    RoachesAbate the nuisance consisting of roachesIssued Jan 9, 2019 · fix by Feb 13, 2019 overdue · Violation #12844181
  • C
    Lead paint- correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices…Issued Jan 9, 2019 · fix by Feb 6, 2019 overdue · Violation #12844313
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold the south wall ( 18 sq ft ) in the 2nd room from north at eastIssued Jan 7, 2019 · fix by Feb 11, 2019 overdue · Violation #12839971
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at the south wall (approx 10 sq ft) in the 1st room from eastIssued Oct 10, 2018 · fix by Nov 14, 2018 overdue · Violation #12633772
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold 15 sq ft at east wall in the bathroomIssued Jun 20, 2018 · fix by Jul 25, 2018 overdue · Violation #12437340
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold at east wall ( approx. 20 sq.ft. ) in the bathroomIssued Oct 29, 2013 · fix by Dec 3, 2013 overdue · Violation #10016381
  • C
    Lead paint- correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny…Issued Apr 20, 2006 · fix by May 16, 2006 overdue · Violation #6113365

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

292017
702018
462019
512020
312021
422022
232023
1262024
122025
522026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 552 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.