Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Elmhurst

41-44 76 Street, Queens

11373 · 51 apartments · 6 stories · City Council district 25

By · Updated · Data from NYC HPD

C
54open immediately hazardous violations · 106 per 100 apartments
B139Hazardous, open
A35Non-hazardous, open
!228Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

19 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company41-44 76ST. REALTY LLC

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    42
  2. Broken doors or locks
    33
  3. Other repairs
    31
  4. Missing smoke or CO detector
    28
  5. Plumbing, sinks and toilets
    19
  6. Leaks and water damage
    19
  7. Roaches
    17
  8. Mold
    14
  9. Mice or rats
    11
  10. Lead paint
    8
  11. Bedbugs
    3
  12. Missing window guards
    2
  13. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C84 days
from 33 closed · NYC typical: 87 days
BNot enough data
NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqaure feet at south wall in the 1st room from eastIssued Oct 6, 2026 · fix by Nov 10, 2026 overdue · Violation #19281690
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19089221
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19089215
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19089222
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 3, 2026 · fix by Aug 29, 2026 overdue · Violation #19089223
  • B
    Other repairsProperly repair or replace the broken or defective wall mount cabinet in the kitchenIssued Aug 3, 2026 · fix by Sep 7, 2026 overdue · Violation #19089217
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from east at southIssued Jul 20, 2026 · fix by Aug 24, 2026 overdue · Violation #19089263
  • C
    Mice or ratsAbate the infestation consisting of mice in the 1st room from east at southIssued Jul 20, 2026 · fix by Aug 15, 2026 overdue · Violation #19089248
  • C
    RoachesAbate the infestation consisting of roaches at public hall, 1st storyIssued Jun 8, 2026 · fix by Jul 4, 2026 overdue · Violation #18984568
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from eastIssued Jun 8, 2026 · fix by Jul 13, 2026 overdue · Violation #18984566
  • C
    Lead paintRemove the illegal fastening consisting of unacceptable electromagnetic locking device installed at vestibule door leading to public hall, cellar entrance storyIssued May 18, 2026 · fix by May 24, 2026 overdue · rent impairing · Violation #18936098
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18936084
  • B
    Other repairsProperly repair with similar material the broken or defective grout at ceramic wall tiles at south, east and north wall in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936088
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936089
  • B
    MoldProperly repair with similar material the broken or defective wood base moldings at south wall in the 2nd room from northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936092
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the 2nd room from northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936093
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 2nd room from northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936094
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18936095
  • B
    Other repairsProperly secure the loose ceramic wall tiles at south wall in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936087
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at ceiling in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936085
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936086
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at south and west wall in the 3rd room from northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936090
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south and west wall in the 3rd room from northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936091
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 18, 2026 · fix by Jun 13, 2026 overdue · Violation #18936096
  • B
    Other repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 6th story balcony at 2nd stack…Issued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936097
  • B
    Lead paintProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door leading to public hall,…Issued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936099
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square at west wall under window in the 2nd room from north at westIssued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18938349
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852827
  • B
    Broken doors or locksReplace with new the missing door at sink base cabinet in the kitchenIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852819
  • B
    Broken doors or locksReplace with new the missing door at wall cabinet at south wall in the kitchenIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852818
  • B
    Other repairsAbate the nuisance consisting of pests. evidence of flies in the entire apartmentIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852826
  • B
    Plumbing, sinks and toiletsReplace the broken or defective washbasin in the bathroomIssued May 6, 2026 · fix by Jun 10, 2026 overdue · rent impairing · Violation #18852825
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852824
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the bathroomIssued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852822
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 6, 2026 · fix by Jun 1, 2026 overdue · Violation #18852820
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued May 6, 2026 · fix by Jun 10, 2026 overdue · Violation #18852828
  • B
    Broken doors or locksProvide security in the event of power outage by means of an acceptable mechanical heavy-duty lock and latch set at vestibule door to building basement story…Issued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18848834
  • C
    Broken doors or locksRemove the illegal fastening electromagnetic locking device installed at vestibule door to building basement story at public hallIssued May 4, 2026 · fix by May 10, 2026 overdue · rent impairing · Violation #18848833
  • B
    Broken doors or locksProperly repair or replace the broken or defective fire stair door at basementIssued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18789230
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq feet at ceiling in the bathroomIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18746809
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10sq feet at north wall in the 1st room from northIssued Mar 26, 2026 · fix by Apr 30, 2026 overdue · Violation #18746808
  • C
    Broken doors or locksRemove the illegal fastening consisting of unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st storyIssued Feb 17, 2026 · fix by Feb 23, 2026 overdue · rent impairing · Violation #18646859
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st storyIssued Feb 17, 2026 · fix by Mar 24, 2026 overdue · Violation #18646860
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 square feet at all walls in the bathroomIssued Jan 22, 2026 · fix by Feb 26, 2026 overdue · Violation #18592088
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 14, 2026 · fix by Feb 9, 2026 overdue · Violation #18568042
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective washbasin base cabinet water damage in the bathroomIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18568045
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at washbasin in the bathroomIssued Jan 14, 2026 · fix by Feb 18, 2026 overdue · Violation #18568044
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564971
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line at wash basin in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564970
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at wash basin in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564969
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564968
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564967
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564982
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564981
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564980
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 12, 2026 · fix by Feb 7, 2026 overdue · Violation #18564978
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood wall cabinet at sink in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564977
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at sink in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564976
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection at waste line at sink in the kitchenIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564975
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wood base cabinet at wash basin in the bathroomIssued Jan 12, 2026 · fix by Feb 16, 2026 overdue · Violation #18564974

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22018
82019
32021
352022
222023
252024
862025
1022026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 340 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.