Housing violations · Allerton
2911 Barnes Avenue, Bronx
10467 · 97 apartments · 6 stories · City Council district 13
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
1 open violation is marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster12
- Other repairs11
- Leaks and water damage9
- Roaches8
- Lead paint4
- Broken doors or locks4
- Mold3
- Plumbing, sinks and toilets3
- Mice or rats2
- No heat or hot water1
- Electrical problems1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 656 closed · NYC typical: 87 days
from 783 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the east and north walls in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19337548
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19337550
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the 1st room from eastIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19337551
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19337549
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Nov 4, 2026 · fix by Oct 27, 2026 overdue · rent impairing · Violation #19337539
- BOther repairsProperly repair with similar material the broken or defective grout at east and north walls in the bathroomIssued Nov 4, 2026 · fix by Dec 9, 2026 · Violation #19337547
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2026 · fix by Nov 28, 2026 · Violation #19338630
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337559
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling at room east center 1Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337560
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak the ceiling and east wall at room east center 1Issued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337563
- BLeaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337537
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337558
- BLead paintProperly repair or replace the broken or defective spring balance at upper window sash (leading to fire escape) in the kitchenIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337553
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from east at northIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337556
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at northIssued Oct 30, 2026 · fix by Dec 4, 2026 · Violation #19337554
- BPlumbing, sinks and toiletsRepair the broken or defective connection wasteline under washbasin in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319976
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19319977
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2026 · fix by Nov 21, 2026 · Violation #19319978
- BOther repairsProperly repair with similar material the broken or defective hard wood floor. ( near steam radiator) in the 1st room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319980
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319981
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at southIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319982
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and all walls in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319984
- BElectrical problemsProperly repair or replace the broken or defective electric light ( flickering),fixture at ceilimg in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319985
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319987
- BOther repairsProperly repair with similar material the broken or defective wood floor in south - 2 closet in the foyerIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319986
- BOther repairsProvide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal…Issued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19319975
- BOther repairsB) correct failure to install an internet capable temperature reporting device in one living room in apartmentIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19308574
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19273254
- CBroken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Oct 7, 2026 · fix by Oct 13, 2026 overdue · Violation #19276672
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jun 23, 2026 · fix by Jul 19, 2026 overdue · Violation #19010992
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 4th room from east at southIssued Jun 12, 2026 · fix by Jul 17, 2026 overdue · Violation #19004058
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #19004063
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #19004049
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 12, 2026 · fix by Jul 8, 2026 overdue · Violation #19004073
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Nov 5, 2025 · fix by Nov 29, 2025 overdue · Violation #18352184
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 4th room from east at northIssued Oct 31, 2025 · fix by Dec 5, 2025 overdue · Violation #18338106
- CMoldTrace and repair the source and abate the visible mold condition west wall 6sq ft and north wall 6sq ft in the bathroomIssued Sep 18, 2024 · fix by Oct 14, 2024 overdue · Violation #17286082
- BOther repairsProperly repair with similar material the broken or defective wood floor at radiator in the kitchenIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16777633
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from east at southIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16777631
- BOther repairsProperly repair or replace the broken or defective glass at lower window sash in the 3rd room from east at southIssued Apr 1, 2024 · fix by May 6, 2024 overdue · Violation #16777630
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 13, 2024 · fix by Apr 8, 2024 overdue · Violation #16733880
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 14, 2024 · fix by Mar 11, 2024 overdue · Violation #16666626
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 2, 2023 · fix by Nov 28, 2023 overdue · Violation #16349577
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 2nd room from northIssued Nov 2, 2023 · fix by Dec 7, 2023 overdue · Violation #16349570
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Sep 5, 2023 · fix by Sep 29, 2023 overdue · Violation #16209872
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed…Issued Aug 30, 2023 · fix by Sep 23, 2023 overdue · Violation #16196119
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective entrance door toIssued May 22, 2023 · fix by Jun 5, 2023 overdue · Violation #15988928
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Apr 11, 2007 · fix by May 7, 2007 overdue · Violation #6690531
- BRoachesAbate the nuisance consisting of vermin roaches in the entire apartmentIssued Jun 21, 2000 · fix by Jul 31, 2000 overdue · Violation #3518955
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from northIssued Jun 21, 2000 · fix by Jul 31, 2000 overdue · Violation #3518879
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.