Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Elmhurst

42-26 81 Street, Queens

11373 · 96 apartments · 6 stories · City Council district 25

By · Updated · Data from NYC HPD

C
20open immediately hazardous violations · 21 per 100 apartments
B43Hazardous, open
A10Non-hazardous, open
!73Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.

9 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company42-26 81ST STREET OWNERS CORP.
Landlord (head officer or owner)James Demetriou

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    13
  2. Broken doors or locks
    12
  3. Missing smoke or CO detector
    10
  4. Peeling paint and plaster
    10
  5. Plumbing, sinks and toilets
    5
  6. Roaches
    5
  7. Leaks and water damage
    4
  8. Mice or rats
    3
  9. Lead paint
    3
  10. Mold
    3
  11. Electrical problems
    2
  12. Missing window guards
    2
  13. Bedbugs
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C41 days
from 17 closed · NYC typical: 87 days
B98 days
from 6 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    BedbugsAbate the infestation consisting of bedbugs in the entire apartmentIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18140942
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelin glaze at bathtub in the bathroomIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18140945
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 7, 2025 · fix by Sep 2, 2025 overdue · Violation #18140943
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line at sink in the kitchenIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · Violation #18140948
  • B
    Plumbing, sinks and toiletsReplace the broken or defective wash basin in the bathroomIssued Aug 7, 2025 · fix by Sep 11, 2025 overdue · rent impairing · Violation #18140944
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel glaze of the bathtub in the bathroomIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17602523
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 8, 2025 · fix by Feb 3, 2025 overdue · Violation #17602524
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17602526
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17602527
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock installed at door that leading to fire escape window in the 2nd room from eastIssued Jan 8, 2025 · fix by Jan 14, 2025 overdue · Violation #17602529
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector missing in the entire apartmentIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17602525
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 8, 2025 · fix by Feb 3, 2025 overdue · Violation #17602522
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchenIssued Jan 8, 2025 · fix by Feb 12, 2025 overdue · Violation #17602521
  • B
    Electrical problemsReplace with new the missing electrical outlets safety covers/ caps on north wall at basementIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17256278
  • B
    Broken doors or locksProperly repair with similar material the broken or defective marble saddle at fire stair exit door on east wall at basementIssued Sep 9, 2024 · fix by Oct 14, 2024 overdue · Violation #17256272
  • C
    Broken doors or locksRemove device preventing door from being self-closing consisting of wooden door jamb at laundry room, 1st storyIssued Sep 6, 2024 · fix by Sep 20, 2024 overdue · Violation #17245265
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st storyIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16710140
  • B
    Leaks and water damageRepair the roof so that it will not leak over ceiling in the 2nd room from northIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · rent impairing · Violation #16710137
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Mar 1, 2024 · fix by Apr 5, 2024 overdue · Violation #16710138
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st storyIssued Mar 1, 2024 · fix by Mar 7, 2024 overdue · rent impairing · Violation #16710139
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling approx 2 sq ft. in the 2nd room from northIssued Oct 6, 2023 · fix by Nov 10, 2023 overdue · Violation #16296657
  • B
    Broken doors or locksProvide security in the event of power outage by means of an acceptable mechanical heavy duty lock and latch at the building entrance door at lobbyIssued Jul 3, 2023 · fix by Aug 7, 2023 overdue · Violation #16070427
  • C
    Broken doors or locksReplace with new the missing fire rated door at north west section of building at basement level storage closet at public hallIssued Jun 29, 2023 · fix by Jul 5, 2023 overdue · Violation #16063110
  • B
    Electrical problemsProperly repair and abate unsafe electric wiring condition consisting of exsposed wires hanging out of ceiling at west section of building at public hallIssued Jun 29, 2023 · fix by Aug 3, 2023 overdue · Violation #16063169
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective boiler room door at west section of building at basement level. at public hallIssued Jun 29, 2023 · fix by Jul 13, 2023 overdue · Violation #16063128
  • B
    Other repairsProperly repair or replace the broken or defective ventilation system at north wall in the bathroomIssued Jun 8, 2023 · fix by Jul 13, 2023 overdue · Violation #16023120
  • C
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at bldg. front north 1 at fire escapeIssued Mar 9, 2023 · fix by Mar 15, 2023 overdue · rent impairing · Violation #15770246
  • C
    Other repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at bldg. front north 2 at fire escapeIssued Mar 9, 2023 · fix by Mar 15, 2023 overdue · rent impairing · Violation #15770249
  • C
    Other repairs& 309 m/d law abate the nuisance consisting of wooden low height gate at east bulkhead to roofIssued Oct 26, 2021 · fix by Nov 1, 2021 overdue · Violation #14640040
  • C
    Broken doors or locksArrange and make self-closing the doors bulkhead door to roof at west bulkheadIssued Oct 26, 2021 · fix by Nov 21, 2021 overdue · Violation #14640041
  • B
    Broken doors or locksProvide security in the event of a power outage by means of an acceptable heavy duty lock and latch set at vestibule door to basement story public hallIssued Oct 26, 2021 · fix by Nov 30, 2021 overdue · Violation #14640046
  • C
    Broken doors or locksRemove the illegal fastening consisting of an unacceptable electromagnetic locking device at vestibule door to basement story public hallIssued Oct 26, 2021 · fix by Nov 1, 2021 overdue · rent impairing · Violation #14640045
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling, east, west and north walls at west bulkhead to roofIssued Oct 26, 2021 · fix by Nov 30, 2021 overdue · Violation #14640042
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 26, 2021 · fix by Nov 21, 2021 overdue · Violation #14640027
  • B
    Other repairsProperly repair the broken or defective counter balance of upper sash of window at east wall in the 3rd room from north at eastIssued Oct 26, 2021 · fix by Nov 30, 2021 overdue · Violation #14640032
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at south wall at basementIssued Oct 26, 2021 · fix by Nov 30, 2021 overdue · Violation #14640035
  • B
    Other repairsProperly repair with similar material the broken or defective fire retardant material at ceiling, east and north walls at east bulkhead to roofIssued Oct 26, 2021 · fix by Nov 30, 2021 overdue · Violation #14640038
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Oct 15, 2021 · fix by Nov 19, 2021 overdue · Violation #14614549
  • B
    Leaks and water damageRepair the roof so that it will not leak at ceiling in the 2nd room from northIssued Oct 15, 2021 · fix by Nov 19, 2021 overdue · rent impairing · Violation #14614548
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 15, 2021 · fix by Nov 10, 2021 overdue · Violation #14614550
  • C
    MoldTrace and repair the source and abate the visible mold condition at ceiling and all walls (32 square feet) in the bathroomIssued Jul 30, 2019 · fix by Aug 20, 2019 overdue · Violation #13195810
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at the east wall in the 1st room from north at eastIssued Jun 19, 2018 · fix by Jul 24, 2018 overdue · Violation #12437321
  • B
    MoldTrace and repair the source and abate the nuisance consisting of mold and mildew at the west wall, approx. 4 sq.ft. in the bathroomIssued Jun 19, 2018 · fix by Jul 24, 2018 overdue · Violation #12437341
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at the west wall in the bathroomIssued Jun 19, 2018 · fix by Jul 24, 2018 overdue · Violation #12437342
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). missing in the entire apartmentIssued Jun 19, 2018 · fix by Jul 24, 2018 overdue · Violation #12437346
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jun 19, 2018 · fix by Jul 24, 2018 overdue · Violation #12437350
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defectiveIssued Nov 9, 2017 · fix by Dec 14, 2017 overdue · Violation #12058726
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroomIssued Nov 9, 2017 · fix by Dec 14, 2017 overdue · Violation #12058714
  • B
    Mice or ratsAbate the nuisance consisting of miceIssued Nov 9, 2017 · fix by Dec 14, 2017 overdue · Violation #12058718
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defectiveIssued Nov 9, 2017 · fix by Dec 14, 2017 overdue · Violation #12058720
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north at eastIssued Nov 9, 2017 · fix by Dec 14, 2017 overdue · Violation #12058755
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Nov 9, 2017 · fix by Dec 14, 2017 overdue · Violation #12058769
  • B
    Missing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Aug 9, 2017 · fix by Sep 13, 2017 overdue · Violation #11917375
  • B
    Missing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Aug 9, 2017 · fix by Sep 13, 2017 overdue · Violation #11917373
  • B
    Broken doors or locksRemove the illegal fastening a key operated door knob lock obsturcting egress to the fire escape in the 3rd room from north at eastIssued Aug 9, 2017 · fix by Sep 13, 2017 overdue · rent impairing · Violation #11917366
  • C
    Lead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set…Issued Jul 20, 2016 · fix by Aug 17, 2016 overdue · Violation #11317260
  • C
    Lead paintSection 27-2056.6 adm code - correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set…Issued Jul 20, 2016 · fix by Aug 17, 2016 overdue · Violation #11317259
  • B
    Plumbing, sinks and toiletsSection 27-2026 adm code replace the broken or defective washbasin in the bathroomIssued Jul 17, 2014 · fix by Aug 21, 2014 overdue · rent impairing · Violation #10310475
  • C
    Missing window guardsSection 27-2043.1 hmc install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health…Issued Dec 16, 2011 · fix by Jan 6, 2012 overdue · Violation #9247561
  • C
    Missing window guardsSection 27-2043.1 hmc install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health…Issued Dec 16, 2011 · fix by Jan 6, 2012 overdue · Violation #9247560

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

172017
62018
72019
22020
282021
12022
252023
162024
162025
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 168 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.