Housing violations · Bedford Park
222 Bedford Park Boulevard, Bronx
10458 · 63 apartments · 6 stories · City Council district 14
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
7 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs22
- Peeling paint and plaster14
- Lead paint7
- Plumbing, sinks and toilets5
- Leaks and water damage5
- Roaches5
- Broken doors or locks3
- Electrical problems2
- Mold2
- Mice or rats1
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 144 closed · NYC typical: 87 days
from 193 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Nov 2, 2026 · fix by Nov 8, 2026 overdue · rent impairing · Violation #19339182
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at southIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297537
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of line installed from electrical light fixture to light switch to outlet at east wall in…Issued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297539
- BLead paintReplace with new the missing handrails at entrance leading down sunken living room in the 1st room from east at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297540
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at northIssued Oct 15, 2026 · fix by Nov 19, 2026 · Violation #19297538
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Oct 15, 2026 · fix by Oct 21, 2026 overdue · rent impairing · Violation #19297536
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft. at ceiling, west and north wall and around window casing in the bathroomIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19261313
- BOther repairsProperly secure the loose loose stair rail at west wall in the 1st room from northIssued Sep 29, 2026 · fix by Nov 3, 2026 overdue · Violation #19232929
- BOther repairsProperly repair with similar material the broken or defective wood flooring in the 1st room from northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232928
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232931
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232927
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the 2nd room from northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232930
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of electrical outlet at south wall in the 1st room from northIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232926
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak ceiling in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232924
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchenIssued Sep 22, 2026 · fix by Oct 27, 2026 overdue · Violation #19232925
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 17, 2026 · fix by Oct 13, 2026 overdue · Violation #19221780
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from eastIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130614
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance at 1st and 2nd window from south at west wall in the 4th room from east at…Issued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965797
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance in the kitchenIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965799
- BOther repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965795
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective over flow face plate at bathtub in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965800
- COther repairsProvide an adequate supply of gas to the fixtures no cooking gas at range in the entire apartmentIssued Jun 1, 2026 · fix by Jun 7, 2026 overdue · rent impairing · Violation #18965803
- BOther repairsProperly repair or replace the broken or defective lower window sash spring balance at 1st window from south at west wall in the 4th room from east at southIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965796
- BOther repairsProperly repair with similar material the broken or defective chalking around water closet in the bathroomIssued Jun 1, 2026 · fix by Jul 6, 2026 overdue · Violation #18965801
- CMice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jun 1, 2026 · fix by Jun 27, 2026 overdue · rent impairing · Violation #18965794
- COther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued May 4, 2026 · fix by May 10, 2026 overdue · rent impairing · Violation #18848028
- COther repairsProvide an adequate supply of gas to the fixtures at stove in the kitchenIssued Apr 16, 2026 · fix by Apr 22, 2026 overdue · rent impairing · Violation #18798889
- COther repairsProperly repair with similar material the broken or defective bricks and mortar at all exterior wall elevator machine room at roof , 6th storyIssued Mar 10, 2026 · fix by Mar 16, 2026 overdue · Violation #18701929
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from eastIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18503558
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the 1st room from eastIssued Dec 15, 2025 · fix by Jan 19, 2026 overdue · Violation #18503557
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from eastIssued Aug 19, 2025 · fix by Sep 23, 2025 overdue · Violation #18171664
- BLeaks and water damageRepair the roof so that it will not leak at ceiling in the 3rd room from eastIssued Aug 19, 2025 · fix by Sep 23, 2025 overdue · rent impairing · Violation #18171663
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door frame in the entranceIssued Aug 11, 2025 · fix by Aug 25, 2025 overdue · Violation #18148640
- CMissing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jul 25, 2025 · fix by Aug 20, 2025 overdue · Violation #18117319
- BBroken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator lower door in the kitchenIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18117310
- CLead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape in the 4th room from northIssued Jun 18, 2025 · fix by Jun 24, 2025 overdue · Violation #18013934
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 18, 2025 · fix by Jul 14, 2025 overdue · Violation #18013933
- CLead paint& 309 m/d law abate the nuisance consisting of key operated locked on door leading to fire escape in the 4th room from northIssued Feb 20, 2025 · fix by Feb 26, 2025 overdue · Violation #17704830
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color eastwall (water stains) in the 4th room from north at eastIssued Nov 7, 2024 · fix by Dec 12, 2024 overdue · Violation #17402292
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at westIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305873
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling & north wall. in the 2nd bathroom from northIssued Sep 30, 2024 · fix by Nov 4, 2024 overdue · Violation #17305870
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective chalking around washbasin in the 1st bathroom from north at westIssued Sep 26, 2024 · fix by Oct 31, 2024 overdue · Violation #17302775
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at westIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295763
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color window frame at west wall in the 1st room from north at westIssued Sep 24, 2024 · fix by Oct 29, 2024 overdue · Violation #17295765
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from eastIssued Sep 17, 2024 · fix by Oct 22, 2024 overdue · Violation #17276918
- BMoldTrace and repair the source and abate the visible mold condition at south wall approx 6 sq ft in the bathroomIssued Aug 23, 2024 · fix by Sep 27, 2024 overdue · Violation #17225578
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jul 29, 2024 · fix by Aug 22, 2024 overdue · Violation #17150140
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 26, 2024 · fix by Aug 21, 2024 overdue · Violation #17138063
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued Jun 7, 2024 · fix by Jul 1, 2024 overdue · Violation #17032820
- BBroken doors or locksProperly repair with similar material the broken or defective marble door saddle in the bathroomIssued Jun 4, 2024 · fix by Jul 9, 2024 overdue · Violation #17019124
- BOther repairsProperly repair or replace the broken or defective window upper and lower sash counter balance at south wall in the 1st room from north at centerIssued May 14, 2024 · fix by Jun 18, 2024 overdue · Violation #16966757
- BOther repairsProperly repair or replace the broken or defective windows (2) lower sash spring balance at south wall in the 1st room from northIssued May 14, 2024 · fix by Jun 18, 2024 overdue · Violation #16966758
- BOther repairsProperly repair with similar material the broken or defective wood floor. in the foyerIssued May 14, 2024 · fix by Jun 18, 2024 overdue · Violation #16966755
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 1st room from north at centerIssued May 14, 2024 · fix by Jun 18, 2024 overdue · Violation #16966756
- CLead paint-certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested…Issued May 6, 2024 · fix by May 30, 2024 overdue · Violation #16954239
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 25, 2024 · fix by May 21, 2024 overdue · Violation #16925630
- BPlumbing, sinks and toiletsProperly repair or replace the broken or defective base cabinet with wash basin in the bathroomIssued Apr 25, 2024 · fix by May 30, 2024 overdue · Violation #16925627
- COther repairsProperly repair or replace the broken or defective counter balances at lower window sash in the kitchenIssued Apr 25, 2024 · fix by May 1, 2024 overdue · Violation #16930175
- CLead paint- correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny…Issued Apr 8, 2024 · fix by May 2, 2024 overdue · Violation #16832775
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Apr 8, 2024 · fix by May 13, 2024 overdue · Violation #16823963
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.