Housing violations · Bedford Park
250 Bedford Park Boulevard, Bronx
10458 · 50 apartments · 6 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster11
- Leaks and water damage6
- Other repairs6
- Broken doors or locks3
- Plumbing, sinks and toilets3
- Roaches3
- No heat or hot water2
- Mold2
- Missing smoke or CO detector2
- Mice or rats1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 18 closed · NYC typical: 87 days
from 69 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19287341
- BLeaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19287340
- BOther repairsRemove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage accumulation observed at basement and rear yard at basementIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19298171
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 16, 2026 · fix by Nov 20, 2026 · Violation #19287344
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 14, 2026 · fix by Oct 10, 2026 overdue · rent impairing · Violation #19285458
- CNo heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 14, 2026 · fix by Oct 10, 2026 overdue · rent impairing · Violation #19285460
- CBroken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Oct 14, 2026 · fix by Oct 20, 2026 overdue · Violation #19285459
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the private hallwayIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287345
- BPlumbing, sinks and toiletsReplace with new the missing ceramic tiles at east wall at bathtub in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287187
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19287188
- COther repairsProperly repair or replace the broken or defective spring balance at lower sash 1st window from north at east wall in the bathroomIssued Aug 13, 2026 · fix by Aug 19, 2026 overdue · Violation #19130961
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain finish at bathtub in the bathroomIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130962
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19130958
- BOther repairsProperly repair with similar material the broken or defective marble saddle at floor in the entranceIssued Aug 13, 2026 · fix by Sep 17, 2026 overdue · Violation #19130956
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 13, 2026 · fix by Sep 8, 2026 overdue · Violation #19130957
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from northIssued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19079797
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from northIssued Jul 15, 2026 · fix by Aug 19, 2026 overdue · Violation #19079798
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyerIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18998760
- BBroken doors or locksProperly repair or replace the broken or defective hinges at cabinet door at sink in the kitchenIssued Jun 15, 2026 · fix by Jul 20, 2026 overdue · Violation #18998761
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 2, 2026 · fix by Mar 28, 2026 overdue · Violation #18676572
- CMoldTrace and repair the source and abate the visible mold condition greater than 30 sq.ft. at ceiling and walls in the bathroomIssued Jun 2, 2025 · fix by Jun 28, 2025 overdue · Violation #17926697
- BMissing smoke or CO detectorRepair or replace the smoke detector defective in the entire apartmentIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17139501
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak above the ceiling in the bathroomIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17139495
- BMissing smoke or CO detectorRepair or replace the carbon monoxide detecting device(s). defective in the entire apartmentIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17139500
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at all walls in the bathroomIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17139497
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroomIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17139498
- BPlumbing, sinks and toiletsReplace the broken or defective the bathtub or reglaze the bathtub in the bathroomIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · rent impairing · Violation #17139499
- BOther repairsProperly repair or replace the broken or defective the ceiling light fixture in the kitchenIssued Jul 25, 2024 · fix by Aug 29, 2024 overdue · Violation #17139504
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at westIssued Jul 25, 2024 · fix by Jul 31, 2024 overdue · Violation #17139503
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 25, 2024 · fix by Aug 20, 2024 overdue · Violation #17139502
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroomIssued Jul 25, 2024 · fix by Jul 31, 2024 overdue · Violation #17139496
- CMoldTrace and repair the source and abate the visible mold condition approximately 20 sq ft at ceiling, north and east walls in the 1st bathroom from northIssued Mar 15, 2024 · fix by Apr 10, 2024 overdue · Violation #16755069
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.