Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Belmont

2414 Belmont Avenue, Bronx

10458 · 31 apartments · 5 stories · City Council district 15

By · Updated · Data from NYC HPD

C
58open immediately hazardous violations · 187 per 100 apartments
B68Hazardous, open
A10Non-hazardous, open
!136Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

5 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Who owns and manages it

Owning company2414 BELMONT LLC
Landlord (head officer or owner)Deda Gjonaj

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    32
  2. Lead paint
    24
  3. Broken doors or locks
    17
  4. Mold
    15
  5. Peeling paint and plaster
    12
  6. Leaks and water damage
    10
  7. Roaches
    8
  8. Plumbing, sinks and toilets
    7
  9. Mice or rats
    4
  10. Electrical problems
    3
  11. Missing window guards
    2
  12. Missing smoke or CO detector
    2
  13. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C147 days
from 104 closed · NYC typical: 87 days
B115 days
from 138 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sqft at south wall, and at north wall in the bathroomIssued Apr 20, 2026 · fix by May 25, 2026 overdue · Violation #18806140
  • C
    Electrical problemsProperly repair or replace the broken or defective electrical switch at sout wall in the foyerIssued Dec 22, 2025 · fix by Dec 28, 2025 overdue · Violation #18528420
  • C
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Dec 22, 2025 · fix by Dec 28, 2025 overdue · Violation #18528430
  • B
    Broken doors or locksProperly secure the loose entrance door in the bathroomIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18513640
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18513633
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 19, 2025 · fix by Jan 14, 2026 overdue · Violation #18513637
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Dec 19, 2025 · fix by Jan 14, 2026 overdue · Violation #18513638
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 19, 2025 · fix by Jan 14, 2026 overdue · Violation #18513635
  • B
    Other repairsProperly repair or replace the broken or defective glass pane at lower sash at fire escape window in the 3rd room from eastIssued Dec 19, 2025 · fix by Jan 23, 2026 overdue · Violation #18513634
  • B
    Broken doors or locksProperly repair or replace the broken or defective lock set doo entrance at public hall, 1st storyIssued Dec 18, 2025 · fix by Jan 22, 2026 overdue · Violation #18515310
  • B
    Other repairsReplace with new the missing escutheon plate at heat riser in the 2nd room from northIssued Dec 16, 2025 · fix by Jan 20, 2026 overdue · Violation #18508172
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Dec 12, 2025 · fix by Jan 16, 2026 overdue · Violation #18501596
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the entranceIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501617
  • C
    Broken doors or locksProperly repair or replace the broken or defective lock at fire escape window in the 2nd room from northIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501605
  • C
    Electrical problemsProvide a safe and adequate supply of electric service to the fixtures electric switch in the private hallwayIssued Dec 12, 2025 · fix by Dec 18, 2025 overdue · Violation #18501610
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at the sink in the kitchenIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18493548
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective wooden cabinet base at the wash basin in the bathroomIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18493549
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the foyerIssued Dec 8, 2025 · fix by Jan 12, 2026 overdue · Violation #18493547
  • C
    Other repairsProperly repair with similar material the broken or defective glass at lower window sash at west wall in the 3rd room from northIssued Dec 1, 2025 · fix by Dec 7, 2025 overdue · Violation #18468327
  • B
    Broken doors or locksRefit door in the bathroomIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468339
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the entranceIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468293
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain glazing at bathtub in the bathroomIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468297
  • B
    Other repairsProperly repair or replace the broken or defective base cabinet with counter top at south wall in the kitchenIssued Dec 1, 2025 · fix by Jan 5, 2026 overdue · Violation #18468345
  • B
    Broken doors or locksRefit door in the entranceIssued Nov 20, 2025 · fix by Dec 25, 2025 overdue · Violation #18414489
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchenIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18358843
  • B
    Other repairsRepair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroomIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · rent impairing · Violation #18358845
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at sink in the kitchenIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18358841
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective counter top at sink in the kitchenIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18358842
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tiles in the private hallwayIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · Violation #18358844
  • B
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Nov 10, 2025 · fix by Dec 15, 2025 overdue · rent impairing · Violation #18358853
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Nov 5, 2025 · fix by Dec 1, 2025 overdue · Violation #18346174
  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18346177
  • C
    Other repairsReplace with new the missing knob at steam radiator in the 3rd room from northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346167
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallwayIssued Nov 5, 2025 · fix by Dec 10, 2025 overdue · Violation #18346155
  • C
    Other repairsProperly repair with similar material the broken or defective vinyl tiles at floor in the private hallwayIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346154
  • C
    Other repairsProperly repair or replace the broken or defective glass at lower window sash at west wall in the 3rd room from northIssued Nov 5, 2025 · fix by Nov 11, 2025 overdue · Violation #18346172
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18273864
  • B
    Other repairsProperly repair or replace the broken or defective glass pane at lower sash at fire escape window in the 3rd room from northIssued Oct 6, 2025 · fix by Nov 10, 2025 overdue · Violation #18273861
  • B
    Other repairsProperly repair or replace the broken or defective spring balances of lower sash at the window in the 3rd room from northIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18263105
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the foyerIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18263102
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from northIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18263107
  • B
    Other repairsProperly repair or replace the broken or defective window pane at lower sash in the 3rd room from northIssued Oct 2, 2025 · fix by Nov 6, 2025 overdue · Violation #18263106
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the kitchenIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805505
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiled floor in the bathroomIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805504
  • B
    Other repairsProperly repair or replace the broken or defective inner glass pane at lower window sash at east wall in the 1st room from northIssued Apr 7, 2025 · fix by May 12, 2025 overdue · Violation #17805507
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective reglaze porcelain enamel finish at bathtub in the bathroomIssued Mar 4, 2025 · fix by Apr 8, 2025 overdue · Violation #17726032
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq ft mold at north wall and west wall in the 4th room from eastIssued Mar 4, 2025 · fix by Mar 30, 2025 overdue · Violation #17726039
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 3, 2025 · fix by Mar 29, 2025 overdue · Violation #17726034
  • B
    Leaks and water damageRepair the leaky and/or defective faucets at bathtub in the bathroomIssued Mar 3, 2025 · fix by Apr 7, 2025 overdue · Violation #17726033
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 3, 2025 · fix by Mar 29, 2025 overdue · Violation #17726035
  • B
    Broken doors or locksReplace with new the missing door in the 1st room from northIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17619667
  • C
    Plumbing, sinks and toiletsRemove all obstructions and repair all defects in waste line at bathtub in the bathroomIssued Jan 13, 2025 · fix by Jan 19, 2025 overdue · rent impairing · Violation #17619662
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 13, 2025 · fix by Feb 8, 2025 overdue · Violation #17619673
  • B
    Broken doors or locksReplace with new the missing door in the 4th room from northIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17619670
  • B
    Broken doors or locksReplace with new the missing door in the 3rd room from north at westIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17619669
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tiles in the kitchenIssued Jan 13, 2025 · fix by Feb 17, 2025 overdue · Violation #17619665
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 4th room from eastIssued Oct 4, 2024 · fix by Nov 8, 2024 overdue · Violation #17330326
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 4, 2024 · fix by Oct 30, 2024 overdue · Violation #17323029
  • C
    Leaks and water damageProperly repair the source and abate the evidence of a water leak over ceiling in the bathroomIssued Oct 4, 2024 · fix by Oct 10, 2024 overdue · Violation #17323021
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 4, 2024 · fix by Oct 30, 2024 overdue · Violation #17323028

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

902017
742018
1302019
1562020
2012021
1312022
1892023
1212024
1052025
22026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 1,481 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.