Housing violations · Jamaica
170-06 88 Avenue, Queens
11432 · 89 apartments · 6 stories · City Council district 27
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Peeling paint and plaster59
- Missing smoke or CO detector46
- Other repairs41
- Leaks and water damage19
- Mold17
- Mice or rats15
- Roaches13
- Broken doors or locks13
- Plumbing, sinks and toilets5
- Electrical problems3
- No heat or hot water2
- Lead paint2
- Bedbugs2
- Missing window guards1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 40 closed · NYC typical: 87 days
from 20 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 11, 2026 · fix by Sep 17, 2026 overdue · Violation #19199792
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Sep 11, 2026 · fix by Oct 16, 2026 overdue · Violation #19199791
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19199790
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19199793
- CPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Sep 8, 2026 · fix by Sep 14, 2026 overdue · Violation #19199787
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchenIssued Sep 8, 2026 · fix by Oct 13, 2026 overdue · Violation #19199788
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2026 · fix by Oct 4, 2026 overdue · Violation #19199789
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150400
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150405
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150404
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from northIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150403
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150402
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150401
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150399
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150398
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tile at (east)wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150397
- BMoldTrace and repair the source and abate the visible mold condition greater than 10sq ft at ceiling and south wall in the bathroomIssued Aug 24, 2026 · fix by Sep 28, 2026 overdue · Violation #19150396
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 24, 2026 · fix by Sep 19, 2026 overdue · Violation #19150395
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling above wall cabinets in the kitchenIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19102708
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at south wall in the kitchenIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102712
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102715
- BPlumbing, sinks and toiletsProperly repair with similar material the broken or defective ceramic wall tiles at east wall at bathtub in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102716
- BOther repairsProperly secure the loose ceramic floor tiles in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102713
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroomIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102714
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102710
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from northIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102711
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Jul 29, 2026 · fix by Sep 2, 2026 overdue · Violation #19102709
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 29, 2026 · fix by Aug 24, 2026 overdue · Violation #19102717
- BMoldTrace and repair the source and abate the visible mold condition less than 10sq feet at ceiling in the bathroomIssued Jul 27, 2026 · fix by Aug 31, 2026 overdue · Violation #19105133
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 30, 2026 · fix by Jul 26, 2026 overdue · Violation #19039093
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039086
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 30, 2026 · fix by Jul 26, 2026 overdue · Violation #19039094
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at eastIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039084
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 1st room from eastIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039499
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at westIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039091
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039092
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at eastIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039085
- COther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Jun 30, 2026 · fix by Jul 6, 2026 overdue · Violation #19039089
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039087
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles. in the bathroomIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039088
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at westIssued Jun 30, 2026 · fix by Aug 4, 2026 overdue · Violation #19039090
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18741687
- BOther repairsProperly repair with similar material the broken or defective ceramic tiles at east wall in the bathroomIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18741692
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Mar 27, 2026 · fix by May 1, 2026 overdue · Violation #18741691
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 27, 2026 · fix by Apr 22, 2026 overdue · Violation #18741689
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 27, 2026 · fix by Apr 22, 2026 overdue · Violation #18741688
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Mar 27, 2026 · fix by Apr 22, 2026 overdue · Violation #18741686
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 27, 2026 · fix by Apr 22, 2026 overdue · Violation #18741685
- CNo heat or hot waterProvide hot water at all hot water fixtures in the 1st room from eastIssued Mar 10, 2026 · fix by Mar 10, 2026 overdue · rent impairing · Violation #18696934
- BLead paintProperly repair or replace the broken or defective latch assembly at fire door leading to first fire stairs from east at south wall (marked 3rd floor) at…Issued Mar 10, 2026 · fix by Apr 14, 2026 overdue · Violation #18695960
- CBroken doors or locksProvide ready access to buildings heating system door lock at cellar entrance story at boiler roomIssued Nov 26, 2025 · fix by Dec 2, 2025 overdue · Violation #18441649
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 2nd room from east at southIssued Nov 26, 2025 · fix by Dec 31, 2025 overdue · Violation #18441657
- COther repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at…Issued Nov 26, 2025 · fix by Dec 2, 2025 overdue · Violation #18441662
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Nov 26, 2025 · fix by Dec 31, 2025 overdue · Violation #18441654
- BOther repairsProperly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroomIssued Nov 26, 2025 · fix by Dec 31, 2025 overdue · Violation #18441655
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 26, 2025 · fix by Dec 22, 2025 overdue · Violation #18441651
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the bathroomIssued Nov 26, 2025 · fix by Dec 31, 2025 overdue · Violation #18441653
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Nov 26, 2025 · fix by Dec 31, 2025 overdue · Violation #18441650
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18289026
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 14, 2025 · fix by Nov 18, 2025 overdue · Violation #18289024
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.