Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Jackson Heights

34-18 91 Street, Queens

11372 · 54 apartments · 6 stories · City Council district 25

By · Updated · Data from NYC HPD

C
49open immediately hazardous violations · 91 per 100 apartments
B108Hazardous, open
A16Non-hazardous, open
!173Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

16 open violations are marked "rent impairing" by HPD, meaning HPD considers the condition serious enough to affect whether rent is owed. It does not lower rent by itself; tenants raise it in Housing Court, usually with legal help.

Open in Google Maps ↗

Who owns and manages it

Owning companyLA MESA VERDE APARTMENTS, LLC
Landlord (head officer or owner)Gary Wollan

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    26
  2. Peeling paint and plaster
    26
  3. Mold
    22
  4. Broken doors or locks
    21
  5. Leaks and water damage
    15
  6. No heat or hot water
    14
  7. Missing smoke or CO detector
    14
  8. Lead paint
    10
  9. Electrical problems
    9
  10. Plumbing, sinks and toilets
    9
  11. Roaches
    6
  12. Mice or rats
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C100 days
from 92 closed · NYC typical: 84 days
B140 days
from 147 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Oct 26, 2026 · fix by Oct 24, 2026 overdue · rent impairing · Violation #19320854
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at cellarIssued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19311567
  • C
    Other repairsPost notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at…Issued Oct 21, 2026 · fix by Oct 27, 2026 overdue · Violation #19316894
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 16, 2026 · fix by Oct 21, 2026 overdue · Violation #19218136
  • C
    Broken doors or locksProvide ready access to buildings heating system boiler room door at cellar at boiler roomIssued Sep 16, 2026 · fix by Sep 22, 2026 overdue · Violation #19218138
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical wall outlet at south wall in the kitchenIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19156124
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at cieling in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19156121
  • C
    Broken doors or locksProvide ready access to buildings heating system locked at cellar at boiler roomIssued Aug 25, 2026 · fix by Aug 31, 2026 overdue · Violation #19156119
  • B
    Leaks and water damageRepair the leaky and/or defective water supply pipe at base cabinet in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · rent impairing · Violation #19156117
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at cieling in the bathroomIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19156120
  • B
    Electrical problemsProperly repair or replace the broken or defective repair electrical wall outlet at south wall in the 1st room from north at westIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19156122
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical wall outlet at west wall in the 1st room from north at eastIssued Aug 25, 2026 · fix by Sep 29, 2026 overdue · Violation #19156123
  • B
    Broken doors or locksProperly repair or replace the broken or defective entrance wood door in the bathroomIssued Aug 14, 2026 · fix by Sep 18, 2026 overdue · Violation #19142959
  • B
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at north wall above base cabinet in the kitchenIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19121058
  • B
    Plumbing, sinks and toiletsRepair the broken or defective connection waste line pipe at wash basin in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19121057
  • B
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective trip leaver at wash basin in the bathroomIssued Aug 10, 2026 · fix by Sep 14, 2026 overdue · Violation #19121056
  • B
    Other repairsProperly repair with similar material the broken or defective 5th tread from bottom at intermidiate landing at public hall, 3rd story, section ''b''Issued Aug 5, 2026 · fix by Sep 9, 2026 overdue · Violation #19123489
  • C
    Broken doors or locksProvide ready access to buildings heating system door locked at boiler roomIssued Aug 3, 2026 · fix by Aug 9, 2026 overdue · Violation #19109552
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 30, 2026 · fix by Aug 13, 2026 overdue · Violation #19105679
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at building front to return buzzer at west wall in the foyerIssued Jul 30, 2026 · fix by Sep 3, 2026 overdue · Violation #19105687
  • B
    MoldTrace and repair the source and abate the visible mold condition less then 10sq ft at ceiling in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19104139
  • B
    MoldTrace and repair the source and abate the visible mold condition around window at north wall in the 1st room from north at eastIssued Jul 16, 2026 · fix by Aug 20, 2026 overdue · Violation #19081914
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018061
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018062
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018060
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018059
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018063
  • B
    Lead paintAnd 27-2056.8 adm code - certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting…Issued Jun 22, 2026 · fix by Jul 27, 2026 overdue · Violation #19018064
  • C
    Lead paint- correct failure to notify occupants and/or to investigate lead-based paint hazardsIssued Jun 12, 2026 · fix by Jun 16, 2026 overdue · Violation #19004495
  • C
    Lead paintH) and 27-2056.17 adm code -correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to…Issued Jun 12, 2026 · fix by Jun 16, 2026 overdue · Violation #19004494
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936685
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at northIssued May 18, 2026 · fix by Jun 22, 2026 overdue · Violation #18936686
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 18, 2026 · fix by May 18, 2026 overdue · rent impairing · Violation #18936689
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink at east wall in the kitchenIssued May 18, 2026 · fix by Jun 22, 2026 overdue · rent impairing · Violation #18936688
  • B
    Other repairsProperly repair or replace the broken or defective bell buzzer intercom in the entire apartmentIssued May 12, 2026 · fix by Jun 16, 2026 overdue · Violation #18911625
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at westIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849260
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849256
  • B
    Other repairsProperly repair with similar material the broken or defective caulking around window frame from east at north in the 1st room from north at westIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849259
  • B
    Other repairsProperly repair with similar material the broken or defective caulking around window frame from south at east in the bathroomIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849257
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 4, 2026 · fix by May 3, 2026 overdue · rent impairing · Violation #18849261
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures at sink at north wall in the kitchenIssued May 4, 2026 · fix by Jun 8, 2026 overdue · rent impairing · Violation #18849253
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued May 4, 2026 · fix by May 18, 2026 overdue · Violation #18849255
  • B
    Other repairsProperly repair with similar material the broken or defective caulking around window frame from south at east in the 1st room from north at westIssued May 4, 2026 · fix by Jun 8, 2026 overdue · Violation #18849258
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued May 1, 2026 · fix by May 1, 2026 overdue · rent impairing · Violation #18826971
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued May 1, 2026 · fix by May 15, 2026 overdue · Violation #18826972
  • C
    Other repairsRepair the broken or defective connection at wasteline at tub in the bathroomIssued Apr 29, 2026 · fix by May 5, 2026 overdue · Violation #18818023
  • C
    Electrical problemsProperly repair or replace the broken or defective electrical outlet at east wall in the entire apartmentIssued Apr 28, 2026 · fix by May 4, 2026 overdue · Violation #18818020
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 28, 2026 · fix by May 12, 2026 overdue · Violation #18818024
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north at westIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18818022
  • B
    Other repairsProperly repair or replace the broken or defective ceramic tile at floor in the 1st room from north at westIssued Apr 28, 2026 · fix by Jun 2, 2026 overdue · Violation #18818021
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 square feet at east wall and window stool in the 1st room from east at southIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801183
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east at southIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801184
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north and east wall in the 1st room from east at northIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801189
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801193
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at north wall in the kitchenIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801192
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling inside west closet in the 1st room from east at southIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801186
  • C
    No heat or hot waterProvide hot water at all hot water fixtures in the entire apartmentIssued Apr 21, 2026 · fix by Apr 20, 2026 overdue · rent impairing · Violation #18801180
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Apr 21, 2026 · fix by May 5, 2026 overdue · Violation #18801194
  • C
    No heat or hot waterProvide an adequate supply of heat for the apartment in the entire apartmentIssued Apr 21, 2026 · fix by Apr 20, 2026 overdue · rent impairing · Violation #18801181
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at east wall in the 1st room from east at southIssued Apr 21, 2026 · fix by May 26, 2026 overdue · Violation #18801185

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

132018
322019
72021
312022
22023
892024
1512025
1992026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 562 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 16, 2026 at 4:16 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.