Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Morrisania

1065 Boston Road, Bronx

10456 · 17 apartments · 5 stories · City Council district 17

By · Updated · Data from NYC HPD

C
2open immediately hazardous violations · 12 per 100 apartments
B10Hazardous, open
A1Non-hazardous, open
!0Past the fix-by date

On average, NYC buildings have 19.8 open class C violations per 100 apartments. This building has fewer.

Open in Google Maps ↗

Who owns and manages it

Owning companyBR AFFORDABLE JV LLC
Landlord (head officer or owner)Joseph Zitolo

As registered with HPD.

What the city has done here

When a landlord does not fix things, HPD can step in: closer watch, doing repairs itself and billing the owner, and taking the owner to Housing Court.

0Repairs the city did itself
$0Billed to the owner for them
1Court cases HPD brought
1Cases tenants brought

Latest Housing Court cases

  • §
    Tenants sued for repairsOpened Nov 7, 2016 · Closed · Details
  • §
    No heat or hot waterOpened Jan 29, 2009 · Closed · Details

Repairs are HPD emergency repairs marked completed (Open Market Orders and Handyman Work Orders); the dollar amount is what HPD charged, which becomes a lien on the property if unpaid. Sources: NYC Open Data (AEP, OMO, HWO, Housing Litigations) and HPD's 2026 Certification Watchlist.

Open problems

All open violations in the building, by type.

  1. Peeling paint and plaster
    3
  2. Other repairs
    3
  3. Broken doors or locks
    2
  4. Plumbing, sinks and toilets
    2
  5. Roaches
    1
  6. Mice or rats
    1
  7. Electrical problems
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C49 days
from 2 closed · NYC typical: 84 days
B17 days
from 1 closed · NYC typical: 110 days

This is time until HPD records the violation as closed, not the exact repair date. Class C (immediately hazardous) deadlines depend on the problem: 24 hours for most, 21 days for lead paint, mold, mice, roaches, rats and window guards, 14 days for self-closing doors, and no grace period for heat and hot water. Class B has 30 days, class A has 90, counted from when the notice is served. HPD’s table.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19368240
  • B
    Broken doors or locksProperly repair or replace the broken or defective closet door in the 1st room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368241
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 12, 2026 · fix by Dec 8, 2026 · Violation #19368239
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368238
  • B
    Other repairsProperly repair with similar material the broken or defective upper wood cabinet at east wall in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368250
  • B
    Other repairs& 309 m/d law abate the nuisance consisting of vinly tiles at floor in the kitchenIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368249
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368248
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at south wall in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368247
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368246
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368245
  • B
    Electrical problemsProperly repair or replace the broken or defective outlet cover at north wall in the 5th room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368244
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 5th room from eastIssued Nov 12, 2026 · fix by Dec 17, 2026 · Violation #19368243

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

22017
32019
62022
32024
42025
132026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 45 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations and Buildings Subject to HPD Jurisdiction on NYC Open Data, plus HPD building registrations. Pulled nightly at about 5:15 AM New York time; this data was pulled November 24, 2026 at 9:30 AM New York time. Counts reflect the city's records at that time, not inspections done since. Apartment numbers are left out on purpose. Spot an error? Check the building on HPD Online, the official record, and let me know.