Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Morrisania

1374 Boston Road, Bronx

10456 · 14 apartments · 5 stories · City Council district 17

By · Updated · Data from NYC HPD

C
22open immediately hazardous violations · 157 per 100 apartments
B20Hazardous, open
A4Non-hazardous, open
!45Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

2 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company1374 Boston Road Limited Partnership

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    10
  2. Mice or rats
    8
  3. Roaches
    7
  4. Mold
    6
  5. Peeling paint and plaster
    6
  6. Lead paint
    3
  7. Broken doors or locks
    2
  8. Plumbing, sinks and toilets
    2
  9. Missing window guards
    2
  10. No heat or hot water
    1

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C181 days
from 54 closed · NYC typical: 87 days
B435 days
from 50 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective door in the bathroomIssued Aug 21, 2026 · fix by Sep 25, 2026 overdue · Violation #19153419
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19139021
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 17, 2026 · fix by Sep 12, 2026 overdue · Violation #19139023
  • C
    MoldTrace and repair the source and abate the visible mold condition approx (10) sq ft at west wall in the bathroomIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19141162
  • C
    MoldTrace and repair the source and abate the visible mold condition approx (10) sq ft at east wall in the bathroomIssued Aug 12, 2026 · fix by Sep 7, 2026 overdue · Violation #19141163
  • C
    Plumbing, sinks and toiletsRepair the broken or defective connection waste pipe under base kitchen sink in the kitchenIssued Aug 12, 2026 · fix by Aug 18, 2026 overdue · Violation #19134788
  • B
    No heat or hot waterProvide adequate supply of hot water for the fixtures hot water fixtures at wash basin sink in the bathroomIssued Aug 12, 2026 · fix by Sep 16, 2026 overdue · rent impairing · Violation #19134802
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the kitchenetteIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18819321
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at west wall in the bathroomIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18819318
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tiles at floor in the bathroomIssued Apr 29, 2026 · fix by Jun 3, 2026 overdue · Violation #18819317
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 5th room from eastIssued Apr 10, 2026 · fix by Apr 16, 2026 overdue · Violation #18774259
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Apr 10, 2026 · fix by May 6, 2026 overdue · Violation #18774265
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841996
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic floor tile in the bathroomIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841994
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroomIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841993
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at all ceilings and walls in the entire apartmentIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17842000
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at south wall in the bathroomIssued Apr 18, 2025 · fix by May 23, 2025 overdue · Violation #17841992
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 15, 2025 · fix by May 11, 2025 overdue · Violation #17820722
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Apr 15, 2025 · fix by May 11, 2025 overdue · Violation #17820723
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jan 24, 2025 · fix by Feb 19, 2025 overdue · Violation #17647386
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 17, 2025 · fix by Feb 12, 2025 overdue · Violation #17627873
  • C
    Missing window guardsInstall the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny…Issued Jan 17, 2025 · fix by Feb 12, 2025 overdue · Violation #17627872
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jan 7, 2025 · fix by Feb 2, 2025 overdue · Violation #17605562
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south wall and west wall in the bathroomIssued May 7, 2024 · fix by Jun 11, 2024 overdue · Violation #16950469
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued May 7, 2024 · fix by Jun 2, 2024 overdue · Violation #16950470
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued May 7, 2024 · fix by Jun 2, 2024 overdue · Violation #16950471
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic tile at south wall in the bathroomIssued May 7, 2024 · fix by Jun 11, 2024 overdue · Violation #16950472
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 29, 2022 · fix by Jan 24, 2023 overdue · Violation #15638605
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Dec 29, 2022 · fix by Jan 24, 2023 overdue · Violation #15638608
  • C
    Lead paintRemove the illegal fastening key operated lock set installed at door leading to fire escape in the 1st room from northIssued Jan 26, 2022 · fix by Feb 1, 2022 overdue · rent impairing · Violation #14799402
  • B
    MoldTrace and repair the source and abate the visible mold condition at east wall approixmately (10sqft) in the bathroomIssued Jan 26, 2022 · fix by Mar 2, 2022 overdue · Violation #14799416
  • B
    Other repairsProperly repair with similar material the broken or defective wood sub floor in the kitchenIssued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14627936
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 18, 2021 · fix by Nov 13, 2021 overdue · Violation #14627942
  • B
    Broken doors or locksReplace with new the broken or defective closet door at west wall in the 1st room from northIssued Oct 18, 2021 · fix by Nov 22, 2021 overdue · Violation #14627939
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 10, 2020 · fix by Dec 6, 2020 overdue · Violation #13885700
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Nov 10, 2020 · fix by Dec 6, 2020 overdue · Violation #13885699
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective re-grout ceramic wall tiles around bathtub in the bathroomIssued Nov 10, 2020 · fix by Dec 15, 2020 overdue · Violation #13885698
  • B
    MoldTrace and repair the source and abate the visible mold condition at ceiling, west, east and north wall in the bathroomIssued Jul 28, 2020 · fix by Sep 1, 2020 overdue · Violation #13741587
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of key aperated lock at the door leading to fire escape window in the 1st room from east at northIssued Mar 15, 2018 · fix by Mar 23, 2018 overdue · Violation #12286092
  • B
    Mice or ratsAbate the nuisance consisting of miceIssued Jan 9, 2017 · fix by Feb 13, 2017 overdue · Violation #11597070
  • B
    Other repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Sep 21, 2015 · fix by Oct 26, 2015 overdue · Violation #10867962
  • B
    Other repairsReplace with new the broken or defective window pane ; lower sash , in the bathroomIssued Mar 13, 2009 · fix by Apr 17, 2009 overdue · Violation #7767257

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

282017
142018
22019
412020
62021
152022
62023
162024
682025
632026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 474 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.