Housing violations · University Heights (North)-Fordham
2550 Briggs Avenue, Bronx
10458 · 29 apartments · 5 stories · City Council district 15
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.
11 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs30
- Broken doors or locks23
- Peeling paint and plaster19
- Leaks and water damage17
- Lead paint15
- Roaches8
- Plumbing, sinks and toilets7
- Mold6
- Mice or rats5
- Missing smoke or CO detector5
- No heat or hot water4
- Electrical problems2
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 47 closed · NYC typical: 87 days
from 39 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first, the latest 60. Tap a violation number for its full details.
- BOther repairsRemove all encumbrances consisting of construction material at public hall, 1st storyIssued Nov 5, 2026 · fix by Dec 10, 2026 · rent impairing · Violation #19357221
- BOther repairsProperly repair with similar material the broken or defective marble at south wall at vestibule , 1st storyIssued Nov 5, 2026 · fix by Dec 10, 2026 · Violation #19357223
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges/ latchIssued Nov 5, 2026 · fix by Nov 19, 2026 · Violation #19357222
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 26, 2026 · fix by Nov 30, 2026 · Violation #19325316
- BBroken doors or locksProvide operable door knob at bulkhead door allowing for re-entryIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323030
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling at public hall, 5th storyIssued Oct 22, 2026 · fix by Nov 26, 2026 · rent impairing · Violation #19323039
- BOther repairsProperly repair with similar material the broken or defective at ceiling at public hall, 5th storyIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323040
- CLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 22, 2026 · fix by Oct 28, 2026 overdue · Violation #19322986
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19322929
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19322991
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective entrance in the entranceIssued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19322997
- CLead paintReplace or repair the self-closing doors that is missing or defective closer arm at door leading to roofIssued Oct 22, 2026 · fix by Nov 5, 2026 overdue · Violation #19323029
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322930
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322931
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from vestibule toIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322933
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322934
- BOther repairsProperly repair with similar material the broken or defective wood floor in the 3rd room from eastIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322936
- BOther repairsProperly repair or replace the broken or defective light fixture at ceiling in the 4th room from east at northIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322939
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from vestibule toIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322944
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19322958
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322959
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from vestibule toIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322960
- BLeaks and water damageRepair the roof so that it will not leak over the ceiling in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · rent impairing · Violation #19322975
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322978
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322984
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322985
- BPlumbing, sinks and toiletsProperly secure the loose the sink in the kitchenIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322987
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from vestibule toIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322988
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19322989
- BBroken doors or locksAdjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum…Issued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322990
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from vestibule toIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19322993
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 22, 2026 · fix by Nov 17, 2026 · Violation #19322996
- BOther repairsProperly repair or replace the broken or defective bell and buzzer system from vestibule toIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323001
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling and east wall in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323004
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323014
- BOther repairsProperly repair with similar material the broken or defective ceramic floor tiles in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323015
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft but less than 30 sq ft observed at ceiling and west wall in the bathroomIssued Oct 22, 2026 · fix by Nov 26, 2026 · Violation #19323018
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303457
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303459
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at vestibule door and left side panel , 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303460
- BBroken doors or locksProvide glass in place of plexi at vestibule door and left panel , 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303461
- CBroken doors or locks& 309 m/d law abate the nuisance consisting of plexi glass installed at building entrance door and sides panels , 1st storyIssued Oct 19, 2026 · fix by Oct 25, 2026 overdue · Violation #19303462
- BBroken doors or locksProvide glass in place of plexi at building entrance door and side panels , 1st storyIssued Oct 19, 2026 · fix by Nov 23, 2026 · Violation #19303463
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19293497
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19293494
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19293495
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 13, 2026 · fix by Nov 17, 2026 · Violation #19293496
- BOther repairsProperly repair or replace the broken or defective latch set in the entranceIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283723
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective latch set in the entranceIssued Oct 9, 2026 · fix by Oct 23, 2026 overdue · Violation #19283722
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Oct 9, 2026 · fix by Oct 23, 2026 overdue · Violation #19283721
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the kitchenIssued Oct 9, 2026 · fix by Nov 13, 2026 overdue · Violation #19283720
- BOther repairsProperly repair or replace the broken or defective latch set at in the entire apartmentIssued Aug 4, 2026 · fix by Sep 8, 2026 overdue · Violation #19122989
- BOther repairsAnd dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at 2nd story balcony at 1st fire from north at…Issued May 14, 2026 · fix by Jun 18, 2026 overdue · Violation #18926949
- BOther repairsRemove all encumbrances consisting of construction material at public hall, 1st storyIssued May 14, 2026 · fix by Jun 18, 2026 overdue · rent impairing · Violation #18926950
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at door in the entranceIssued Apr 30, 2026 · fix by May 14, 2026 overdue · Violation #18823502
- BOther repairsProperly repair with similar material the broken or defective wood sub floor (cracked and sunken) in the 4th room from east at northIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18823501
- BOther repairsProperly repair or replace the broken or defective bell buzzer intercom system from building entrance to panel at east wall in the private hallwayIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · Violation #18823510
- BOther repairsRemove all encumbrances consisting of construction materials at public hall, 1st storyIssued Apr 30, 2026 · fix by Jun 4, 2026 overdue · rent impairing · Violation #18823514
- CBroken doors or locksProperly repair or replace the broken or defective latch and assemblys at vestibule to 1st story public hall door , 1st storyIssued Oct 7, 2025 · fix by Oct 13, 2025 overdue · Violation #18279571
- BMoldTrace and repair the source and abate the visible mold condition less than 10 sq.ft at ceiling and south wall in the bathroomIssued May 13, 2025 · fix by Jun 17, 2025 overdue · Violation #17897213
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.