Skip to content
NYC Data / City Support by Mantie Reid II

Housing violations · Bedford Park

2695 Briggs Avenue, Bronx

10458 · 49 apartments · 6 stories · City Council district 15

By · Updated · Data from NYC HPD

C
24open immediately hazardous violations · 49 per 100 apartments
B57Hazardous, open
A14Non-hazardous, open
!95Past the fix-by date

On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building has more.

6 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.

Open in Google Maps ↗

Who owns and manages it

Owning company2695 BRIGGS LLC
Landlord (head officer or owner)Joseph Pistilli

As registered with HPD.

Open problems

All open violations in the building, by type.

  1. Other repairs
    20
  2. Lead paint
    15
  3. Peeling paint and plaster
    13
  4. Broken doors or locks
    11
  5. Mold
    7
  6. Plumbing, sinks and toilets
    7
  7. Roaches
    6
  8. Missing smoke or CO detector
    6
  9. Mice or rats
    6
  10. Leaks and water damage
    2
  11. Electrical problems
    2

How fast problems get closed

Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.

C204 days
from 25 closed · NYC typical: 87 days
B259 days
from 45 closed · NYC typical: 115 days

The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.

Open hazardous violations

Newest first, the latest 60. Tap a violation number for its full details.

  • B
    Broken doors or locksProperly repair or replace the broken or defective mortise lock at the metal door in the entranceIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19107412
  • B
    Broken doors or locksProperly repair or replace the broken or defective rubber gasket around the refrigerator door in the kitchenIssued Jul 31, 2026 · fix by Sep 4, 2026 overdue · Violation #19107411
  • B
    MoldTrace and repair the source and abate the visible mold condition less than 10 sq ft at north wall and around north wall window in the bathroomIssued Jul 22, 2026 · fix by Aug 26, 2026 overdue · Violation #19096877
  • B
    Other repairsRemove all encumbrances consisting of garbage bags ,furniture and household items at public hall, 6th storyIssued Jul 13, 2026 · fix by Aug 17, 2026 overdue · rent impairing · Violation #19065211
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges at bulkhead roof door at 1st public hall bulkhead from north, 6th storyIssued Jul 13, 2026 · fix by Jul 27, 2026 overdue · Violation #19065213
  • B
    Broken doors or locksProperly repair with similar material the broken or defective marble saddle at door in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954532
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelin enmal final by method reglaze at bathtub in the bathroomIssued May 26, 2026 · fix by Jun 30, 2026 overdue · Violation #18954529
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 25.sq feet at ceiling,east and north walls in the bathroomIssued Mar 31, 2026 · fix by Apr 26, 2026 overdue · Violation #18754918
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Mar 31, 2026 · fix by Apr 26, 2026 overdue · Violation #18754929
  • B
    Other repairsFire escape defective. replace with new the broken, defective and/or missing bent dropladder at at 2nd fire escape from south at east exterior wallIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · rent impairing · Violation #18739045
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18739013
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10 sq ft at ceiling and all walls in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18732990
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective spout at shower body at bathtub in the bathroomIssued Mar 24, 2026 · fix by Mar 30, 2026 overdue · Violation #18732985
  • B
    Plumbing, sinks and toiletsProperly repair with similar material the broken or defective caulking around bathtub in the bathroomIssued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18732987
  • C
    Other repairsReplace with new the missing lower sash at 1st window from east at south wall in the 1st room from eastIssued Mar 24, 2026 · fix by Mar 30, 2026 overdue · Violation #18739036
  • C
    Plumbing, sinks and toiletsProperly repair or replace the broken or defective vanity under wsh basin in the bathroomIssued Mar 24, 2026 · fix by Mar 30, 2026 overdue · Violation #18732989
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18732992
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Mar 24, 2026 · fix by Apr 28, 2026 overdue · Violation #18732993
  • C
    Lead paint& 309 m/d law abate the nuisance consisting of a key operated lock installed at door leading to fire escape in the 1st room from east at southIssued Mar 24, 2026 · fix by Mar 30, 2026 overdue · Violation #18732999
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Feb 2, 2026 · fix by Feb 28, 2026 overdue · Violation #18607022
  • B
    Other repairsProperly repair with similar material the broken or defective ceramic wall tile at north and east wall in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18607030
  • B
    MoldTrace and repair the source and abate the visible mold condition greater than 10sq.ft at north wall in the bathroomIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18607032
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at north, south and east wall in the private hallwayIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18607035
  • B
    Other repairsProperly repair with similar material the broken or defective vinyl floor tile in the kitchenIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18607024
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Feb 2, 2026 · fix by Feb 28, 2026 overdue · rent impairing · Violation #18607021
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Feb 2, 2026 · fix by Feb 28, 2026 overdue · Violation #18607020
  • B
    Other repairsProperly repair or replace the broken or defective buzzer and return voice intercom system from building entrance up to panel at north wall in the private…Issued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18607036
  • B
    Other repairsProperly repair or replace the broken or defective light switch cover at south wall in the kitchenIssued Feb 2, 2026 · fix by Mar 9, 2026 overdue · Violation #18607026
  • B
    MoldTrace and repair the source and abate the visible mold condition less than ten square feet at ceiling, north and east walls in the bathroomIssued Jan 5, 2026 · fix by Feb 9, 2026 overdue · Violation #18550885
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchenIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18430014
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the private hallwayIssued Nov 24, 2025 · fix by Dec 29, 2025 overdue · Violation #18430012
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18210845
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18210846
  • B
    Broken doors or locksRefit door in the entranceIssued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18210843
  • B
    Other repairsProperly repair or replace the broken or defective saddle at entrance in the bathroomIssued Sep 8, 2025 · fix by Oct 13, 2025 overdue · Violation #18210841
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Sep 8, 2025 · fix by Oct 4, 2025 overdue · Violation #18210838
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 8, 2025 · fix by Oct 4, 2025 overdue · Violation #18210839
  • B
    Missing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204536
  • B
    Peeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204533
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the bathroomIssued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204532
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Sep 5, 2025 · fix by Oct 1, 2025 overdue · Violation #18204534
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Sep 5, 2025 · fix by Oct 1, 2025 overdue · rent impairing · Violation #18204535
  • B
    Missing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Sep 5, 2025 · fix by Oct 10, 2025 overdue · Violation #18204537
  • B
    Other repairsProperly repair or replace the broken or defective intercom system at south wall in the foyerIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18111545
  • C
    MoldTrace and repair the source and abate the visible mold condition more than 30 sq.ft at north, east, west walls and ceiling in the bathroomIssued Jul 25, 2025 · fix by Aug 20, 2025 overdue · Violation #18111548
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Jul 25, 2025 · fix by Aug 8, 2025 overdue · Violation #18111546
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 25, 2025 · fix by Aug 20, 2025 overdue · Violation #18111544
  • B
    Broken doors or locksProperly repair with similar material the broken or defective marble door saddle in the bathroomIssued Jul 25, 2025 · fix by Aug 29, 2025 overdue · Violation #18111547
  • C
    Mice or ratsAbate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm),…Issued Jul 25, 2025 · fix by Aug 20, 2025 overdue · rent impairing · Violation #18111543
  • C
    RoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 14, 2025 · fix by Aug 9, 2025 overdue · Violation #18090507
  • C
    Mice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jul 14, 2025 · fix by Aug 9, 2025 overdue · Violation #18090508
  • C
    Other repairsProperly repair or replace the broken or defective outer glass pane at window upper sash in the 1st room from eastIssued Jul 11, 2025 · fix by Jul 17, 2025 overdue · Violation #18089220
  • B
    Other repairsProperly repair or replace the broken or defective outer glass pane at upper window sash in the kitchenIssued Jul 11, 2025 · fix by Aug 15, 2025 overdue · Violation #18089218
  • B
    Other repairsProperly repair or replace the broken or defective inoperative. intercom system from building entrance to north wall panel in the foyerIssued Feb 13, 2025 · fix by Mar 20, 2025 overdue · Violation #17689067
  • C
    Broken doors or locksReplace or repair the self-closing doors that is missing or defective hinges in the entranceIssued Dec 19, 2024 · fix by Jan 2, 2025 overdue · Violation #17565194
  • B
    Leaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from eastIssued Dec 19, 2024 · fix by Jan 23, 2025 overdue · Violation #17565195
  • B
    Broken doors or locks& 309 m/d law abate the nuisance consisting of at building front entry door (plexi glass)Issued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17072726
  • B
    Other repairsProperly repair with similar material the broken or defective at (elevator machine room) all interior walls (cracks & eroded bricks)Issued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17072607
  • B
    Other repairsProperly repair with similar material the broken or defective at east exterior wall(north section) (building front entrance) alluminum flashing at (rooftop)Issued Jun 24, 2024 · fix by Jul 29, 2024 overdue · Violation #17072715
  • B
    Plumbing, sinks and toiletsReplace the broken or defective mechanical stopper at bathtub in the bathroomIssued Apr 8, 2024 · fix by May 13, 2024 overdue · rent impairing · Violation #16820427

See every open violation on HPD Online, the city's official site. Violation numbers match.

New violations each year

162018
12019
12020
182021
142022
52023
552024
432025
542026
Everything here comes from HPD's published records. A violation stays open until the landlord certifies the repair and HPD accepts it. Apartment numbers are left out on purpose. 249 violations on record for this building.

Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.