Housing violations · Bedford Park
3029 Briggs Avenue, Bronx
10458 · 51 apartments · 5 stories · City Council district 11
By Mantie Reid II · Updated · Data from NYC HPD
On average, NYC buildings have 19.6 open class C violations per 100 apartments. This building is about the same.
3 open violations are marked "rent impairing" by HPD, which can be grounds for tenants to pay less rent.
Who owns and manages it
As registered with HPD.
Open problems
All open violations in the building, by type.
- Other repairs11
- Peeling paint and plaster9
- Roaches7
- Mice or rats4
- Mold2
- Missing smoke or CO detector2
- Broken doors or locks2
- Leaks and water damage1
- Electrical problems1
How fast problems get closed
Typical days from the violation notice to the city closing it, for violations issued in the past 3 years. Fewer is better.
from 26 closed · NYC typical: 87 days
from 28 closed · NYC typical: 115 days
The legal deadline is 24 hours for class C and 30 days for class B. Closing also needs paperwork, so the real fix can be sooner.
Open hazardous violations
Newest first. Tap a violation number for its full details.
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Nov 6, 2026 · fix by Dec 2, 2026 · Violation #19355557
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods fire escape from from east at south exterior wall south section at…Issued Oct 21, 2026 · fix by Nov 25, 2026 · rent impairing · Violation #19312525
- BOther repairsFire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 1st fire escape from east at north exterior wall at fire escapeIssued Oct 21, 2026 · fix by Nov 25, 2026 · rent impairing · Violation #19312523
- BMoldTrace and repair the source and abate the visible mold condition less than 10 square feet at ceiling and east wall in the bathroomIssued Jul 24, 2026 · fix by Aug 28, 2026 overdue · Violation #19104143
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Apr 17, 2026 · fix by May 13, 2026 overdue · Violation #18791019
- BMissing smoke or CO detectorB)(1)(a) hmc, § 12-01, § 12-03 rcny repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of…Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791018
- BMissing smoke or CO detectorB)(1)(b) hmc, § 12-06, § 12-07, § 12-09 rcny repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance…Issued Apr 17, 2026 · fix by May 22, 2026 overdue · Violation #18791017
- CBroken doors or locksReplace or repair the self-closing doors that is missing or defective door and frame at exit door to south yard at cellarIssued Mar 26, 2026 · fix by Apr 9, 2026 overdue · Violation #18741218
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Dec 11, 2025 · fix by Jan 6, 2026 overdue · Violation #18496420
- BMoldTrace and repair the source and abate the visible mold condition greater than 10 sq.ft at ceiling in the bathroomIssued Aug 8, 2025 · fix by Sep 12, 2025 overdue · Violation #18139679
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17333709
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Oct 9, 2024 · fix by Nov 4, 2024 overdue · Violation #17333708
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Aug 12, 2024 · fix by Sep 7, 2024 overdue · Violation #17184446
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from northIssued Jul 3, 2023 · fix by Aug 7, 2023 overdue · Violation #16066157
- BOther repairsProvide an adequate supply of gas to the fixtures at range in the kitchenIssued Jun 30, 2023 · fix by Aug 4, 2023 overdue · rent impairing · Violation #16066150
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Jun 30, 2023 · fix by Jul 26, 2023 overdue · Violation #16066152
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jun 30, 2023 · fix by Jul 26, 2023 overdue · Violation #16066151
- CMice or ratsAbate the infestation consisting of mice in the entire apartmentIssued Aug 25, 2022 · fix by Sep 20, 2022 overdue · Violation #15328468
- CRoachesAbate the infestation consisting of roaches in the entire apartmentIssued Jul 19, 2022 · fix by Aug 14, 2022 overdue · Violation #15265304
- BRoachesAbate the nuisance consisting of roaches in the entire apartmentIssued Jul 23, 2018 · fix by Aug 27, 2018 overdue · Violation #12490237
- BLeaks and water damageProperly repair the source and abate the evidence of a water leak at ceiling, north and east walls in the 1st room from north at eastIssued Apr 10, 2018 · fix by May 15, 2018 overdue · Violation #12324725
- BOther repairs& 309 m/d law abate the nuisance consisting of raised floor approx 3 inches creating trip hazard in the kitchenIssued Nov 6, 2017 · fix by Dec 11, 2017 overdue · Violation #12051367
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Nov 6, 2017 · fix by Dec 11, 2017 overdue · Violation #12051380
- BElectrical problemsProperly repair and abate unsafe electric wiring condition consisting of bx cable in the bathroomIssued Nov 6, 2017 · fix by Dec 11, 2017 overdue · Violation #12051377
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroomIssued Nov 6, 2017 · fix by Dec 11, 2017 overdue · Violation #12051372
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at centerIssued Nov 6, 2017 · fix by Dec 11, 2017 overdue · Violation #12051355
- BOther repairsProperly repair with similar material the broken or defective wood floor in the private hallwayIssued Oct 18, 2017 · fix by Nov 22, 2017 overdue · Violation #12018526
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from eastIssued Oct 18, 2017 · fix by Nov 22, 2017 overdue · Violation #12018635
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color ceiling / east wall north wall south wall in the bathroomIssued Oct 18, 2017 · fix by Nov 22, 2017 overdue · Violation #12018585
- BOther repairsProperly repair the broken or defective lower sash window counter balance in the 1st bedroom from eastIssued Oct 18, 2017 · fix by Nov 22, 2017 overdue · Violation #12018566
- COther repairs-correct failure to provide to the department within 45 days of demand all records required to be maintained by ownerIssued Oct 16, 2009 · fix by Nov 11, 2009 overdue · Violation #8106838
- BPeeling paint and plasterRepair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings in the entire apartmentIssued Mar 25, 2003 · fix by May 4, 2003 overdue · Violation #4516292
- BBroken doors or locksReplace or repair the self-closing doors that is missing or defective 3rd sty southwestIssued Sep 14, 1999 · fix by Nov 1, 1999 overdue · Violation #397570
See every open violation on HPD Online, the city's official site. Violation numbers match.
New violations each year
Source: NYC Department of Housing Preservation and Development (HPD), Housing Maintenance Code Violations (NYC Open Data wvxf-dwi5) and Buildings Subject to HPD Jurisdiction (kj4p-ruqc), refreshed nightly. Updated November 15, 2026. Apartment numbers are left out on purpose.